    A regressive mode of highwall failure in coal strip mines

    By B. Stimpson, K. Kosar, K. Barron

    "A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t

    Jan 1, 1986

  • TMS
    Fugitive Emission Factors For A Primary Copper Converter

    By John O. Burckle

    For years, the measurement of fugitive emissions from the primary copper converter has defied all attempts based on inferential measurements, It has been concluded by virtually all investigators that

    Jan 1, 1983

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • NIOSH
    IC 7682 Accepted Limit Values Of Air Pollutants ? Introduction And Acknowledgments

    By J. F. Barkley

    As part of the work of serving as Chairman of Subcommittee 3, Health and Industrial Requirements, of the American Society of Mechanical Engineers' Committee on Air-Pollution Controls, the author

    Jan 1, 1954

  • IMPC
    Multidimensional Analysis of Coal Separation Processes

    By T. Tumidajski

    The purpose of the separation processes in coal processing is obtaining products of certain ash contents. In the most of cases it is assumed that the separation process is described by one, selected p

    Jan 1, 2014

  • CIM
    The Approach to Process Improvements at Brunswick Mine

    By Chris Larsen, Carole Fortin, Dave Scott, Curtis Deredin, Ian Orford, Jean Guy Gauthier, Andy Trusiak, Lyne Côté, Mike Cooper

    "Upon successful commissioning of the Stage Grinding Project (Cormier et. al., 2002), process improvements predicted through pilot plant testing were obtained in several flotation circuits, resulting

    Jan 1, 2005

  • CIM
    Manganese Removal Process: from project status to production CIM

    By Robin Belley

    Outline Introduction Wabush Mines HistoricalBackground Mine and Concentrator at WabushMines High Intensity Magnetic Separators (HIMS) Development of the Manganese Removal Process Pilot Plant T

    May 1, 2011

  • SME
    Olivine - Past, Present And Future

    By Kefton H. Teague

    Olivine was first described and named by Warner in 1790. It is an olive green to greenish gray colored magnesium-iron silicate containing a mixture, in solid solution, of fosterite (Mg2SiO4) and faya

    Jan 1, 1977

  • AIME
    Extractive Metallurgy Division - Metallurgical Reactions of Fluorides - Discussion

    By Herbert H. Kellogg

    C. M. Decroly (University of Brussels, Belgium) — The importance of the fluorides in the process metallurgy of special metals has already been accepted and it will probably increase in the future. Fre

    Jan 1, 1952

  • DFI
    Installation And Testing Of Instrumented Tieback Anchors - Introduction

    By Joan Stoupa

    The expansion of the West Point wastewater treatment plant located in Seattle, Washington, will require a permanent tieback retaining wall to enlarge the plant site for the new treatment plant facili­

    Jan 1, 1990

  • CIM
    Maximisation des revenus et du rendement financier par l'optimisation de l'information, de la planification et des pratiques minières

    During the past 10 years, research work to improve the survey of stope limits after mining supplied useful information, particularly for large open and sub-level stopes, regarding waste dilution cause

    Jan 1, 2005

  • AIME
    Institute of Metals Division - A Calorimetric Investigation of the Energy Relations in Alloys of Composition Cu3Au

    By J. S. Ll. Leach, L. R. Rubin, M. B. Bever

    The energies of formation of ordered and disordered solid solutions of composition CusAu and the energy of ordering in this alloy were determined by tin solution calorimetry. The degree of order was m

    Jan 1, 1956

  • AUSIMM
    The Use OF Synthetic Polymer As A Drying Aid In Pelletizing

    In February 1974 a continuous synthetic polymer dosing plant was installed at Hamersley Iron Pty. Limited's Pellet Plant at Dampier. The polymer, supplied in a liquid sus- pension, is used to i

    Jan 1, 1974

  • AIME
    Part VII – July 1969 - Papers - Nature of the Work-Hardening Behavior in Hadfield's Manganese Steel

    By M. J. Marcinkowski, K. S. Raghavan, A. S. Sastri

    A detailed transmission electron microscopy investigation was carried out in connection with a manganese Hadfield Steel. At small plastic strains, numerous individual intrinsic stacking faults are obs

    Jan 1, 1970

  • TMS
    Production of Copper and Zinc Oxide in the Process of Brass Scrap Recycling

    By Milorad Cirkovic, Mile Bugarin, Vlastimir Trujic

    "Industrial scale testing was performed in the plant-site of Bor Company. Charging sample was from 4-5 tons for each particular test. All operations in industrial scale investigations were carried out

    Jan 1, 2008

  • IIMP
    Mining Complexes Information Management – Experiences

    By Osvaldo A. Bascur

    Connectivity between mining and metallurgical process operations and their business systems has become a reality. Expanded use of plant information on the desktop is a standard tool for revenue improv

    May 25, 1998

  • DFI
    Theoretical Ultimate Lateral Resistance near the Soil Surface in Unsaturated Cohesionless Soils

    By Oladayo O. Komolafe and Majid Ghayoomi

    p-y curves have been used over the years to determine the lateral resistance of piles. This method is popular among practicing engineers due to its simplicity and its ability to determine the slope,

    Sep 8, 2021

  • SME
    Biomineralization Of Manganese By Bacillus Spp Isolated From A Marine Biofilm

    By H. Sarvamangala

    Biomineralization of manganese on titanium condenser material exposed to seawater has been illustrated. Biom-ineralization occurs when the fouling components, namely, the microbes, are able to oxidize

    Jan 1, 2008

  • CIM
    The Role Of Technical Experts in Sustainability and Corporate Social Responsibility

    By Dina Aloi

    The need to be seen as responsible neighbours and good corporate citizens is a critical success criteria for mining companies. To be seen as responsible requires both achieving responsible performance

    Jan 1, 2010

  • SAIMM
    The Recovery of Manganese Products From Ferromanganese Slag Using a Hydrometallurgical Route

    By S. J. Baumgartner

    The ferromanganese industry is under pressure to deal with the slag arising from the production of ferromanganese, which is discarded in landfills or slag heaps. This material poses an environmental a