Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Metallurgy of Copper - Reverberatory Tonnages Reach 1500 per Day Waste-Heat Boiler Installations ImprovedBy P. D. I. Honeyman
DURING 1938 many copper companies again felt the economic pinch and smelter operations were often on a reduced basis which some- times resulted in intermittent operations and complete shutdowns. Durin
Jan 1, 1939
-
Opportunities For Improvements In Alumina Production: Balancing Incremental And Breakthrough InnovationBy Robin J. Batterham
Alumina demand is steadily climbing around the world and is likely to continue to do so for many years. In such a commodity industry, the question arises as to what effort should be expended on innova
Sep 1, 2012
-
Design-By-Analysis of Water-Cooled Gas Handling DuctsBy T. Plikas, T. Porretta, M. Al-Dojayli, B. Pretorius, J. Woloshyn, H. Ghorbani
"Water-cooled ducts represent an integral part of high temperature off-gas systems in metallurgical processes. Typically, off-gas enters these ducts at significantly elevated temperatures; therefore,
Jan 1, 2017
-
Pyrometallurgical process simulations using CALPHAD thermodynamic databasesBy M-A Van Ende, N Kumar, I-H Jung
In order to utilise the powerful thermodynamic databases for process simulations, a concept called Effective Equilibrium Reaction Zone (EERZ) was introduced to couple thermodynamic database calculatio
Aug 21, 2024
-
Mathematics Model and Programming Realization of the Varying-Rate Gas Drainage Process for a Sealed LaneBy H. G. Wang
The production process of a coal mine can often be interrupted by all kinds of events scheduled or unscheduled and thus often needs gas drainage for a temporary or long-term sealed area. Gas drainage
Aug 1, 2013
-
Power Cooling And Mulpic Technology For Hot Rolled Flat And Plate ProductionBy Lukas Pichler
The market trend of advanced high strength steel (AHSS) with demand for higher strength products is increasing continuously. The inline cooling technologies have established as the most powerful metal
Aug 17, 2017
-
IC 9408 Computer-Assisted Ground Control Management SystemBy David P. Conover
The U.S. Bureau of Mines (USBM) has developed a computer-assisted Ground Control Management System (GCMS) for near realtime evaluation of underground coal mine ground conditions. The GCMS combines exi
Jan 1, 1994
-
The Professional Examination Of Undeveloped Mineral Properties.By Charles Catlett
(Chattanooga Meeting, October, 1M.) THE terms " developed " and " undeveloped " are necessarily relative and cover a wide range; but the latter is here applied to cases in which the information at ha
Mar 1, 1909
-
Monitoring the wear of water-cooled tap-hole blocks by the OPTISAVE fibre-optic methodBy M. Hopf
Numerous developments and improvements have been made to tap-hole designs. On the other hand, there are very specific designs in operation that have endured for many years without any modification. No
Jan 1, 2014
-
The New York Annual MeetingBy AIME AIME
EITHER the 2300 people who came to the Annual Meeting were in a better frame of mind or they were resigned to their fate, or it was a better meeting than usual. Whatever the reason, at the 1nstitute?s
Jan 1, 1938
-
Developing an Interactive, Collaborative Virtual Underground Mine to Support Mine Emergency Response ExcercisesBy Tony Szwilski
Using Unity 3D as a collaborative multi-user virtual on-line environment, an interactive virtual underground mine platform (IVUMP) is being developed to provide on-line access to mine safety preparedn
Aug 1, 2013
-
Using Simple Statistics To Define Confidence Limits For Reliable Quantitative Definition Of Mineral Resources?The Venmyn Variance Tower ? SynopsisBy A. N. Clay
In recent times, there has been criticism of the minerals industry over the lack of quantifiable boundaries between inferred, indicated, and Measured resources. A recent initiative through the United
Jan 1, 2012
-
Ventilation Cost Savings Using Localized Haul Truck Power Reduction"An innovative concept is proposed whereby the operating power for haul trucks in certain areas of an underground mine are reduced in order to lower ventilation costs. Airflow that must be provided fo
Jan 1, 2017
-
Uranium Extraction from Turbid Liquids by Continuous Ion Exchange ProcessesBy A. Himsley
This paper presents a review of the existing ion exchange resin systems for treating unclarified pregnant liquor, with particular reference to uranium extraction. A new concept of a truly continuous i
Jan 1, 1977
-
IC 8482 Summary Of Mining And Petroleum Laws Of The World (In Five Parts) 1. Western HemisphereBy Northcutt Ely
This volume summarizes mining and petroleum legislation in 30 jurisdictions of the Western Hemisphere. Within these jurisdictions, primary attention is given to requirements that must be met in each c
Jan 1, 1970
-
IC 9278 Impact Of Current Load On Mine Trailing Cable Thermal LifeBy M. R. Yenchek
The U.S. Bureau of Mines has determined a method for calculating coal mine portable power cable thermal life for a specified temperature loading. This work was the culmination of a multifaceted resear
Jan 1, 1991
-
Evaluation Of Hot Electrostatic Precipitation As The Basis For An Arsenic-Zinc Separation When Treating Arsenical Dusts With The HRD Flame Reactor ProcessBy J. E. Sallee
An experimental study has been conducted on the level of arsenic contamination in samples of zinc oxide when the zinc oxide is contacted with gas mixtures containing As4O6(g). This contamination has b
Jan 1, 1994
-
The Development of Models in Minerals ProcessingBy I Cameron
Simulation is increasingly being used to analyse mineral processing operations and explore efficiency options. Engineers that use simulation are rightly concerned with the quality and applicability of
Jan 1, 1998
-
Experimental Study On Iron-Based Alloy As Cladding Layer—Improving High Temperature Oxidation Resistance Of Furnace AlloyBy Chen Chen, Wang Yanze, Hong Xin
Furnace superalloy was applied in harsh environment within the erosion of high temperature and oxidizing atmosphere. With plasma powder surfacing technology, iron-based alloy powder was sprayed on the
Jan 1, 2016
-
Current developments at Rio AIgom, Elliot LakeBy K. D. Hester
This paper will review the metallurgical aspects of the completed expansion program at Quirke, and the current rehabilitation and refurbishing program at Panel. During the Quirke program, completed a
Jan 1, 1979