Search Documents

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • CIM
    Ensuring the Furnace Integrity with Intelligent Operations, Efficient Cooling and Refined Design

    By Iina Vaajamo, Jani Jansson, Lauri Pesonen

    In pyrometallurgical operations, structural integrity of a high temperature furnace plays a crucial role in the overall safety, profitability and ecological footprint of the plant. Furnace integrity i

    Jan 1, 2015

  • AUSIMM
    Controlled Recirculation and Refrigeration at ValeÆs Taquari Potash Mine

    By S Bluhm, LádeáOliveira, R Funnell

    Taquari Vasouras potash mine (Vale Fertilizantes) has many interesting features including virgin rock temperatures of 50¦C at depths of 700 m. The mine has a relatively small shaft system with limited

    Jul 1, 2013

  • SME
    A Passive Means To Detect Hot Trolley Insulators

    By M. R. Yenchek

    Faulty insulators on mine trolley/track haulageways may allow the flow of leakage currents into the mine roof and ultimately result in combustion of the local roof material. The National Institute for

    Jan 1, 1998

  • SAIMM
    Reliability Modelling And Performance Analyses Of An LHD System In Mining

    By B. Samanta

    LHD (load haul dumper) is now used as a loading machine for intermediate mechanization in underground coal mining. For survival in the intense competition in the global business environment in recent

    Jan 1, 2004

  • SME
    Recent Developments In New Coal Utilization Technologies (04ad539c-7aff-4fae-9de6-777592f00c43)

    By Leonard B. Rothfeld

    For many years, pulverized coal (PC) boilers in utility power plants have been the dominant market for domestic coal. Today, two new coal utilization technologies challenge the PC boiler's domina

    Jan 1, 1987

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • SME
    Refuge Alternatives Relief Valve Testing and Design With Updated Test Stand

    By P. T. Bissert, T. J. Lutz, J. A. Yonkey, G. T. Homce

    "Underground refuge alternatives (RAs) require an air source to supply breathable air to the occupants. This requires pressure relief valves (PRVs) to prevent unsafe pressures from building up within

    Jan 1, 2017

  • NIOSH
    IC 7188 Field Performance of Permissible Electric Cap Lamps

    By A. B. Hooker

    Nineteen of the installations were on rental contracts 1.L."'1der whtch the lamps belong to the lamp company and are rented by t.½em to the mine operatj.nt; company. · The other nine installations had

    Jan 1, 1942

  • CIM
    Metallurgical Coals of the Crowsnest Area (f4686b1c-7914-48b7-b4ff-5c4b1e7d36a6)

    By E. J. Burrough

    MR. J. J. McIntyre (International Coal & Coke Company, Ltd., and McGi1livray Creek Coal & Coke Company, Ltd., Coleman, Alta): Mr. Burrough's excellent paper, Metallurgical Coals of the Crowsnest

    Jan 1, 1951

  • SAIMM
    Synthesis of Pt-based alloy nanostructures

    By E. van Steen, G. M. Leteba

    Optimizing the catalytic performance of multimetallic nanoparticle (NP) catalysts demands a concrete understanding of their design, while preferentially deploying wet chemical synthesis procedures to

    Jun 1, 2021

  • SME
    Financing Options For Small Mines—what We Learned In Our Senior Design Project - SME Annual Meeting 2022

    By G. V. Campbell, O. T. Holdsworth, M. G. Nelson

    A senior design project is required by all accredited mining engineering degree programs. Often referred to as the capstone of a student’s education, this project is expected to include all the import

    Mar 2, 2022

  • IMMS
    Marine Minerals Research In The United States: Recent Results From The Marine Minerals Technology Center

    By Sukumar Bandopadhyay

    The Marine Minerals Technology Center (MMTC) was authorized by an act of the United States Congress in 1996. The act established several marine minerals research centers in the U.S., including one at

    Jan 1, 2005

  • NIOSH
    OFR-47-88 Determining The Effect Of Incentive Programs On The Occurrence Of Accidents, Injuries, And Productivity - Final Report

    By Paul S. Goodman

    This report examines the effectiveness of bonus plans in the coal industry. The analysis uses theoretical, literature review and empirical approaches to determine the impact of bonus plans on safety a

    Jan 1, 1987

  • NIOSH
    RI 9011 - Corrosion Resistance of Selected Ceramic Materials to Sulfuric Acid

    By James P. Bennett

    The Bureau of Mines is investigating the acid resistance of ceramic materials to identify construction materials for emerging technology in chemical and metallurgical processes. Eight commercial ceram

    Jan 1, 1986

  • NIOSH
    OFR-99-76 Open-Pit Mine Demonstration Of Ream

    By Robert G. Lundquist

    This report summarizes all relevant findings and conclusions regarding capabillty of high-energy projectile impact to operate effectively in an open pit mining environment and to successfully handle s

    Jan 1, 1976

  • SAIMM
    Consolidated Backfill At O'Okiep Copper Company

    By J .. F. Brownrigg

    In the mining method used at O'Okiep Copper Company (OCC), vertical crater retreat, the prime requirement for the fill is that it should be sufficiently strong to be free-standing to a height of

    Jan 1, 1988

  • AUSIMM
    Quality Sampling Using Coiled Tubing Drilling in Deep Mineral Exploration

    By V Rasouli, G Cavanough, A Mokaramian

    The sampling time, the costs and its quality are the three factors that determine the best method of drilling in mineral exploration. The two principal methods of reverse circulation (RC) and diamond

    Aug 21, 2012

  • SAIMM
    Friction Hydro Pillar Process As An Alternative Repair Technology For Creep Evaluation Sites On Thick-Walled 10CrMo910 Creep-Resistant Steel Structures ? Synopsis

    By D. L. H. Bulbring

    The removal of a cylindrical core from thick-wall sections for creep analysis by the relatively new Weldcore® process represents a very exciting methodology for obtaining more representative creep dam

    Jan 1, 2013

  • SAIMM
    Development of a filtered inverse velocity method analyser: A comparative study of smoothing filters in surface mines for optimisation of slope failure predictions

    By M. M. Masood, G. Y. Raju, T. Verma

    The inverse velocity method has proven to be an effective approach for predicting slope failures in surface mines by analysing displacement monitoring data. However, the accuracy of inverse velocity m

    Sep 1, 2025