Search Documents

  • AIME
    The Josephtown Electrothermic Zinc Smelter - Progressive Plant Expansion Increases Zinc and Zinc Product Supply

    By H. K. Najarian

    AT Josephtown, Pa., on the south hank of the Ohio River about thirty miles northwest of Pittsburgh, is the Josephtown electrothermic zinc smelter, which operates as a custom smelter receiving both dom

    Jan 1, 1947

  • CIM
    The Concentration of Barite-Fluorite Ores from the Lake Ainslie District, Nova Scotia

    By E. Lee Cameron

    The old mine workings on four barite-fluorite veins of the Lake Ainslie district, Nova Scotia, were opened recently and channel sampled. The samples were then forwarded to the Ore Dressing Laboratorie

    Jan 1, 1945

  • SME
    Revisiting Scrubbing Unit Operations in the Phosphate Industry

    By F. J. Sotillo

    "Scrubbing both horizontal (drum) and vertical (attrition) are considered simple unit operations in the beneficiation of phosphate ores. In general, the operating conditions are fixed at high solids c

    Jan 1, 2017

  • AIME
    Discussions - Of Mr. Colby's Paper on Comparison of American and Foreign Rail-Specifications, with a Proposed Standard Specification to Cover American Rails Rolled for Export (see p. 576)

    E. Windsor Richards, London, England:—In reading this paper the most interesting point to me mas the question of the maximum percentage of phosphorus allowable in the steel rail. Mr. Colby said, and w

    Jan 1, 1907

  • DFI
    Inspector's Manual For Driven Pile Foundations ? Introduction

    This manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an

    Jan 1, 1997

  • AUSIMM
    The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold Mines

    By D Hillier, A Giblett, K Parker, V Ramsell

    Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo

    Oct 29, 2012

  • CIM
    Compressed Air in Cool Mines

    By Marc Piard

    In a cool mine, tapping high-pressure lines through reducing valves lowers the temperature beyond remedy. It is the writer's suggestion that, for low-pressure work, law-pressure air ,should be ge

    Jan 1, 1926

  • SME
    The Cost Simulation Approach For Evaluating, Selection And Recommendation Of Equipment For Large Volume Earth-Moving Projects

    By Harrison H. Roberts

    A. We are aware that many who are in the audience have perhaps heard before some of the material which will be presented. Since our firm is more closely associated with the heavy construction industry

    Jan 1, 1972

  • CIM
    Continuous Improvement of the Return Air Raise Silencer System at Totten Mine

    By Andrew Dobson, Cheryl Allen, Enrique Acuña

    "Totten Mine return air raise was designed with two parallel fans equipped with silencers to reduce the noise emitted from the outlets into the environment. As development and production of the mine p

    Jan 1, 2019

  • SME
    Effects of obstructions, sample size and sample rate on ultrasonic anemometer measurements underground - SME Transactions 2011

    By C. D. Taylor, A. L. Mazzella, A. L. Martikainen

    In fluctuating airflow, continuous air velocity recording is the most reliable method of air velocity measurement. It allows for fast recognition of changes and the calculation of long-term averages.

    Jan 1, 2011

  • SME
    Practical Development of Gold Projects from the Design Engineer's Aspect

    By M. P. A. Hames, D. R. Beaumont

    INTRODUCTION Legend has it that when Isembard Kingdom Brunel was confronted with the cost and consequences of one of his bridges having failed, he responded cheerfully that the event had saved inv

    Jan 1, 1987

  • SME
    The McLaughlin Mill -- An Overview Of Initial Operations

    By J. L. Young

    The McLaughlin Mill started operating in January, 1985. For the first eighteen (18) months start-up, initial operation, and circuit debottlenecking have been done. The mill was designed to recover gol

    Jan 1, 1987

  • SME
    Service Life Prediction for the Ohio River Bridge East End Crossing Tunnel

    "The Ohio River Bridge East End Crossing Tunnel requires a 75-year service life of its cast-in-place reinforced concrete lining. This twin-tube 3-lane (each tube) highway tunnel is about 55-ft wide an

    Jan 1, 2016

  • CIM
    The Ecstall Story: The Ecstall Concentrator

    By Michael P. Amsden

    "THE ECSTALL CONCENTRATOR is situated adjacent to Highway 101 and the Ontario Northland Railroad, 15 miles east of Timmins, Ontario. Ore is delivered to the concentrator by rail from the mine, which i

    Jan 1, 1974

  • NIOSH
    Bulletin 34 Run-Of-Mine and Briquetted Coal

    By Henry Kreisinger, WALTER T. RAY

    In its investigation of more efficient methods for utilizing the coals and lignites in the United States, to the end that waste might be avoided, the value of low-grade coals increased, and the life o

    Jan 1, 1911

  • CIM
    Diamonds on the Brodeur Peninsula — A new kimberlite province in Nunavut, Canada

    By B. C. Jago, H. Derbuch

    "The Freightrain kimberlite is located on the Brodeur Peninsula, Baffin Island, Nunavut. Twin Mining is exploring the pipe and adjacent land (79 claims/655 km2) using a combination of airborne geophys

    Jan 1, 2002

  • SME
    Visualizing rock mass displacement and strain data for interpretation of TARP levels as a safety measure - ME Feature Article

    By Angelina Anani, Nilufer K. B. Akbulut, Sefiu O. Adewuyi

    Crucial information about safety, design and operation from ground movement data can be utilized in underground mines. Communicating the information and exploring new findings can be a challenge, howe

    Sep 1, 2025

  • TMS
    Analysis of Recent Advances in Smelter Gas Cleaning Systems (The Minerals, Metals & Materiale·Society, 1991)

    By L. J. Friedman

    Smelter operating and environmental requirements demand high on-stream time (high reliability) from the primary smelter sulfur retention device - the sulfuric ?acid plant. The key to reliable smelter

    Jan 1, 1992

  • CIM
    Feasibility of controlled recirculation of exhaust air to reduce heating costs at Ruttan Mine, Manitoba

    By J. -P. Saindon, L. D. Nel, A. E. Hall, S. G. Hardcastle

    "This paper reports on an investigation into gas and dust concentrations in Ruttan Mine's exhaust air. The values obtained indicate that there is excellent potential to recirculate approximately

    Jan 1, 1988

  • CIM
    Studies in the casting of AA6111 strip on a horizontal, single belt, strip casting simulator

    Strips of AA6111 automotive alloy were cast on a horizontal single belt strip casting simulator, Pure copper and carbon steels substrates plasma sprayed with different coatings for improving the strip

    Jan 1, 2005