Search Documents

  • NIOSH
    Electrical And Mechanical Hazards And Falls Of Persons At Metal And Nonmetallic Mines - Metal- and Nonmetallic-Mine Accident-Prevention Course - Section 6 - Purpose And Scope

    The first metal-mine accident-prevention course was prepared and published 1942-45 as a series of seven miners' circulars (Nos. 51-57). The course has been broadened, revised, and brought up to d

    Jan 1, 1957

  • NIOSH
    Bulletin 130 Blast-Furnace Breakouts, Explosions, and Slips, and Methods of Prevention

    By F. H. Willcox

    This publication is the third of a series of reports on hazards and the prevention of accidents at blast-furnace plants that is being published by the Bureau of Mines, Technical Paper 106a being the f

    Jan 1, 1917

  • CIM
    Larger Tonnages, Larger Crushers? (4b90a2d7-e545-4b9a-86f4-a36122e857a0)

    By K. L. Boyd

    "Can the increasing tonnages of ore and waste mined today be accommodated simply by using bigger and better crushers? This paper reviews the latest primary crushing and large cone crusher designs. It

    Jan 1, 2017

  • NIOSH
    OFR-34-87 Industry Assessment Of Minos® Mine-Monitoring System

    By F. du Breuil

    BCR National Laboratory (formerly Bituminous Coal Research, Inc.), under a USBM con­tract (originally with the Department of Energy), monitored the installation and operation of a computer-based belt-

    Jan 1, 1987

  • NIOSH
    OFR-23-78 Brake Evaluations & Recommendations - Evaluation And Development Of Performance Requirements Of Braking Systems For Rubber-Tired Mining Equipment In Underground Coal Mines

    By Walter W. Kaufman

    The braking performance of underground, rubber-tired, coal mining vehicles is evaluated. Surveys of mining equipment and braking manufacturers and underground stopping tests are discussed as they rela

    Jan 1, 1977

  • SME
    Crystalline Silica: A Need For Responsible Risk Assessment In Formulating Public Policy

    By B. A. Hillman

    Silicon is the second most abundant element on earth, exceeded only by oxygen. Silicon dioxide forms a crystalline structure of repeating SiO2 molecules which form characteristically hard, durable cry

    Jan 1, 1992

  • NIOSH
    OFR-76(2)-79 Development Of Highwall Mining Equipment (Phase I) Volume II

    By Mandius C. Lundal

    This report describes the work done to develop a coal mining machine to increase productivity and recovery from thin seams beyond the highwall, in addition to decreasing the miner's susceptibilit

    Jan 1, 1977

  • SME
    Using lean six sigma techniques for projects at a Canadian uranium mine, mill

    By S. G. Britton

    "Strategies to improve performance in mining production, maintenance and mineral processing operations have evolved over time from straightforward time studies of individual machine performance in the

    Nov 1, 2016

  • NIOSH
    OFR-17(3)-77 Conceptual Design Of An Automated Longwall Mining System - Volume I - Final Report ? Executive Summary

    This report provides concepts for two automated longwall mining systems; one for operation in a 42 to 57-inch thick section of the Lower Kittanning coal seam, the other in a 57 to 72-inch thick sectio

    Jan 1, 1976

  • SME
    SME Annual Conference & Expo

    By Georgene Renner, Chee Theng, William Gleason

    "With more than 900 booth spaces sold and 630 exhibiting companies displaying their wares, there was something for all 7,804 attendees on the exhibit floor of the 2015 SME Annual Conference & Expo in

    Jan 1, 2014

  • NIOSH
    OFR-123-76 Evaluation Of Underground Conventional Mining Equipment

    By William J. Douglas

    This document describes the development of a conventional mining equipment data base, and an approach for conducting industrial engineering studies of arbitrary mining systems employing network techni

    Jan 1, 1976

  • SME
    Floodplain Aggregate Mining In Western Oregon (041e6431-52df-4ad0-a7d9-a5b889f587f6)

    By E. F. Schnitzer

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit and

    Jan 1, 1999

  • NIOSH
    IC 8458 Proceedings Of The Symposium On Respirable Coal Mine Dust, Washington, D.C., November 3-4, 1969

    MR. RIGG: Gentlemen, I would like to welcome you all to the symposium this morning. My name is Jack Rigg, and I m a special assistant to Hollis Dole, Assistant Secretary of the Interior for Minera

    Jan 1, 1970

  • CIM
    Network Convergence for Underground Mines

    By Matthew R. Ward

    This paper aims to describe the reasons and methods to extend enterprise networks into underground mines. Currently mines use a number of communication networks for telephones, PLCs, two-way VHF radio

    Apr 1, 2005

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • CIM
    Operation of Centrifugal Pumps

    By Mark W. Booth

    THE Dominion Steel and Coal Corporation, as a coal mining concern and as a steel industry, has much pumping to do, and the conditions are as varied as it is possible to make them. We are faced with ha

    Jan 1, 1944

  • NIOSH
    OFR-56-75 Early Warning System Of Impending Rock Failure For Safety In Mines And Excavations

    By A. L. Podia

    The purpose of this research was to develop a system capable of detecting changes in the structure of rocks, leading to failure of mine roofs, and/or excavations. A prototype system was developed,

    Jan 1, 1973

  • NIOSH
    Bulletin 40 The Smokeless Combustion of Coal in Boiler Furnaces

    By D. T. Randall, H. W. Weeks

    The burning of coal without smoke is a problem that concerns the Government directly because of the advantages of smokeless combustion both in public buildings and on naval vessels. In addition, smoke

    Jan 1, 1912

  • CIM
    Project Environmental Approval

    By B. R. Boardman

    Project Environmental Approval is a multi-faceted issue. From a mining perspective, it is a costly item because of avoidable time delay. The government perspective is that the approvals are a necessar

    Jan 1, 1978

  • NIOSH
    OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

    By K. B. Bengtson

    This task report provides the process technology, preliminary design, capital and operating costs for a 25 TPD pilot plant to produce cell-grade alumina using a clay/hydrochloric acid extraction - HCI

    Jan 1, 1979