Search Documents

  • NIOSH
    RI 4977 Tests Of A Heat Pump For Domestic Heating And Cooling ? Introduction And Summary

    By E. P. Carman

    This: report gives data on the installation and operation of a packaged-unit heat-pump installation in a residence in McLean, Va., a suburb of Washington, D. C. The original equipment, installed in Ja

    Jan 1, 1953

  • CIM
    Sustainable Hydrometallurgical Processing at the Ambatovy Nickel Operation in Madagascar

    By D. Yuan, M. Sitter, S. St. Jean, M. Collins

    The Ambatovy Joint Venture comprises an operating lateritic nickel mine, ore slurry pipeline, pressure acid leach plant and nickel refinery in Madagascar. The hydrometallurgical process selected by S

    Jan 1, 2015

  • AIME
    Notes on the Fatigue of Non-ferrous Metals

    By H. F. Moore

    DURING the last six years, there have been many extensive investigations of the fatigue of metals. The major work of 'these investigations has been the determination of constants for fatigue stre

    Jan 1, 1925

  • CIM
    Effect of Laser Power and Joint Gap on Weld Quality Of Aerospace Grade Ze41a-T5 Magnesium Alloy Using Nd:YAG Laser

    By H. Al-Kazzaz

    The effects of laser power and joint gap on the welding quality of 2-mm butt joints of ZE41A-T5 sand castings were investigated using a continuous wave 4 kW Nd:YAG laser system and 1.6-mm EZ33A-T5 fil

    Jan 1, 2006

  • CIM
    Role of Process and Logistics Simulation Modeling in Delivering Capital Effective and Operationally Efficient Solutions for RTFT

    By G. Issid, J. McGinty, C. Lee, Y. Pepin

    For more than a decade, Hatch has used process and logistics models to assist Rio Tinto Fer et Titane (RTFT) with capacity planning, debottlenecking, and optimization to help ensure design capability,

    Jan 1, 2011

  • NIOSH
    IC 6941 Reconnaissance Of Mining Districts In Mineral County, Nev. ? Introduction

    By William O. Vanderburg

    This paper gives the results of a reconnaissance of the mining districts of Mineral County, Nev., made during the month of June and the first 10 days in October 1936.3/ During the field work virtually

    Jan 1, 1937

  • CIM
    Development of a Risk-Based Inspection System for the Mining and Metals Industry

    By S. Boisvert

    Risk-based Inspection (RBI) addresses the challenges associated with ageing plants by focusing the inspection effort on the process equipments with the highest risk, thereby improving plant safety and

    Jan 1, 2010

  • IMPC
    Optimization Studies On The Removal Of Copper From Sarcheshmeh Molybdenite Concentrate By Ferric Chloride Leaching

    By Ali Dehghani Ahmad Abady

    In Sarcheshmeh Copper Complex, a molybdenite floatation concentrate was produced by selective removal of copper impurities with 7 stages of cleaner floatation banks, that contains around 1% copper and

    Sep 1, 2012

  • CIM
    Prevention of Low Back Pain - A Challenge

    By C. Droun

    "Low back pains account for about 13 per cent of all compensation claims made to the Quebec Workmen's Compensation Commission and cost the employers a sum exceeding ten million dollars. The frequency

    Jan 1, 1973

  • NIOSH
    IC 7874 Methods And Practices For Producing Crushed Granite, Weston-Brooker Co. Warren County, Ga. ? Introduction

    By Norman A. Pace

    This paper is one of a series being published by the Federal Bureau of Mines on methods and practices used in mining and preparing crushed stone for market. Performance, in terms of units of work or t

    Jan 1, 1959

  • NIOSH
    IC 8561 Engineering Cost Study Of Development Wells And Profitability Analysis Of Crude Oil Production

    By T. M. Garland

    This report presents a more extensive perspective of the calculated profitability of developing and producing crude oil and associated natural gas by primary methods from selected onshore areas of the

    Jan 1, 1972

  • TMS
    An Interdisciplinary Approach towards Optimal Continuous Casting of Steel

    By Jaroslav Horskoý, Miroslav Raudenský, Bogdan Filipic, Božidar Sader

    This paper describes main elements and practical use of the computational system for automated setting of optimized casting conditions in the continuous casting of steel. The system consists of the he

    Jan 1, 2000

  • CIM
    On the Calibration of the Potential Technique for Monitoring Corrosion Fatigue Crack Growth Using Finite-Element Method

    When selecting a method for monitoring crack growth in pipeline steel, the sensitivity or crack-size resolution plays a dominant role. Even though there are several visual and non-visual methods, the

    Jan 1, 2005

  • CIM
    Teniente Converter- A Decade of Achievements at the Southern Peru Ilo Smelter

    By E. Herrera Alarcón, L. Mariscal Samaniego

    The Teniente Converter (wet charge type) was commissioned in august 1995 and was designed to smelt 744 tpd (metric tons per day) of dry copper concentrates. Its products are white metal (73% Cu) that

    Jan 1, 2007

  • CIM
    Alloy Steels in the Mining Industry

    By G. K. Herzog

    THE problems relating to the construction and use o{ mining equipment are basically the same as those pertaining to equipment in other industries. It is true that much mining equipment is subjected to

    Jan 1, 1938

  • AUSIMM
    Recent Advances in the Simulation of Mineral Processing Circuits Using Artificial Intelligence

    By van der Walt TJ, van Deventer JSJ, Reuter MA

    Owing to their complexity, many metallurgical processes are difficult to model fundamentally, and as a result more attention has been focused on the use of artificial intelligence techniques to simu

    Jan 1, 1993

  • AUSIMM
    Solid bowl decanter centrifuges – the alternative technology

    By M Player, R Klug, N Schwarz

    There are several technologies available for thickening and dewatering of mining process slurries. The most commonly used are thickeners and filters, but technological developments have made solid bow

    Jul 1, 2021

  • NIOSH
    IC 8247 Electronic Monitoring Of Mine Fans

    By John C. Hartley

    Three systems that monitor ventilating fans are described. These electronic monitoring systems automatically perform most of the operations required to conform with the provisions of the Federal Mine

    Jan 1, 1964

  • SME
    Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?

    By Giuseppe M. Gaspari, Tamara Kondrachova

    Contract practices affect cost and schedule of tunneling works, impacting risk allocation between Owners and Contractors. The Authors compiled a dataset of projects constructed in the Toronto Area bet

    Jun 13, 2021

  • CIM
    The Marketing of Nickel

    By K. H. J. Clarke

    "ALTHOUGH nickel was not identified as a separate element until a Swedish scientist, Axel Frederick Cronstedt, did so in 17 51, its utilization dates from pre-historic times. From its humble beginning

    Jan 1, 1960