Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Electrodeposition and Characterization of Fe-Mo-P Coatings as Electrocatalysts for Hydrogen Evolution during Chlorate ProductionBy E. Ghali, N. Sorour, G. Houlachi
"The binary Fe53Mo47 and ternary Fe54Mo30P16 coatings have been electrodeposited from citrate-based electrolyte on mild steel (MS) substrates. The electrodeposition has been conducted for 6 hours at 2
Jan 1, 2016
-
High-Pressure Grinding for Copper at Cyprus SierritaBy L. Thompsen
High-pressure grinding rolls (HPGR) offer capacity increases, savings in operating costs and metallurgical advantages. The first installation of the Polycom HPGR in a copper ore treatment plant occur
Jan 1, 1996
-
The Influence Of Temperature, Potential And Chloride Concentration On The Dissolution Of Pt, Pd And Rh In NaCl SolutionBy K. Lillkung
The use of secondary sources has become a very attractive option in the production of platinum group metals as the demand for these metals has increased. One of the promising sources are the spent cat
Sep 1, 2012
-
C12-02 Leaching Of Massive Sulfide Samples From The Southern Juan De Fuca Ridge, North Pacific OceanBy D. L. Sawyer
Aqueous C12-02 leaching procedures developed by the Bureau of Mines to produce zinc chloride from zinc sulfide bulk concentrates were effective in extracting 99 pct of the zinc and 97 pet of the silve
Jan 1, 1983
-
Application of an empirical method and numerical modelling to the Merensky Reef crush pillar stabilityBy K. B. Le Bron, T. van Aard
The empirical pillar strength formulae have been widely, and in most cases successfully, applied to design underground pillars for mines in the Bushveld Igneous Complex (BIC). This paper presents the
Mar 5, 2025
-
Some Developments In High-Temperature Alloys In The Nickel-Cobalt-Iron SystemBy C. R. Austin
THE investigation described in this paper deals with the development of high-temperature alloys of the Konel series over a considerable period of time at the Research Laboratories of the Westinghouse
Jan 1, 1931
-
Review of Australian Longwall Panel Ventilation PracticesBy S Gillies, H W. Wu
A study has been undertaken into mine ventilation systems currently in use within Australian modern coal longwall (LW) extraction mines. It reviews systems and discusses evolving changes being adopted
Jul 1, 2013
-
Supergene Mineralization at the Kori Kollo Gold Mine, BoliviaBy C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood
"Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)
Jan 1, 1997
-
Micromodel Approach To Process SimulationBy S. Seetharaman
The present paper presents. the concept of micro-models and illustrates the application of the same in the simulations metallurgical processes. Development of micromodels requires access to accurate t
Jan 1, 1999
-
Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving MinesBy G Pizarro, O Miranda, D Rosales
In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i
May 9, 2016
-
Wireless Communications in Mineral Processing ApplicationsBy Peter Metcalfe
"Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen
Jan 1, 2014
-
Impact of Blasting Sequence on Dilution and Benefit Through Ore Displacement Control Using Three-Dimensional ModelingBy Paulo C. Fernández A, Sergio Matamala V, Claudio C. Gajardo, Christian A. Rees P
In fragmentation processes in open-pit mining, it has been observed that there are many opportunities for improvement if greater control of ore displacement in blasting is achieved, reducing the perce
Jan 26, 2026
-
Flash Furnace OptimizationBy W. G. Davenport
A flash furnace can be run many different ways. It can, for example, be operated with: (a) highly 02"enriched, ambient temperature blast and no fossil fuel (b) considerable fossil fuel and hot, sl
Jan 1, 2001
-
A Review of the Geology of Gold in Nova ScotiaBy Milton C. Graves, Marcos Zentilli
"Gold has been reported from most geological environments in Nova Scotia; however, virtually all production (circa 2,000, 000 troy ounces; circa 60 tonnes) has come from that part of the province to t
Jan 1, 1982
-
A Study On The Relation Of Retained Austenite To Mechanical Properties In Cold Rolled Transformation-induced Plasticity Steel*By Hongshuang Di, Tianyu Zhang, Huiqiang Huang
A CMnSiAl transformation induced plasticity (TRIP) steel was used to study the effect of retained austenite on room-temperature mechanical properties. The steel plates with retained austenite were obt
Oct 1, 2019
-
Metal Losses to the Slag and Matte-Slag Separation in Electric Smelting of Copper-Nickel Concentrates.The effect of change in slag composition upon metal losses to the slag and the relationship between slag composition and slag matte separation was investigated at 1400°C. The synthetic slags containin
Jan 1, 1994
-
Effect of Batch Charging Equipment on Glass Furnace EfficiencyBy Mark Jolly, Nasim Soleimanian
"During the last 20 years CFD (Computational Fluid Dynamics) has been used as a tool to aid furnace designers and manufacturers to improve energy efficiency and effectiveness of glass furnaces. Howeve
Jan 1, 2013
-
Semi-autonomous inspection of a belt conveyor in an industrial environment with the use of a legged robot APCOM 2021By M. Stachowiak, M. Nowicki, K. Walas, A. Skoczylas, P. Stefaniak
In this paper the authors present a walking robot dedicated to the inspection of a belt conveyor’s transportation system in an underground mine. The developed robot can independently diagnose all of t
Sep 1, 2021
-
Comparative Tests on Drill-Steel BreakageBy S. S. Clarke
ABOUT two years ago some of my friends were discussing the amount of drill-steel breakage that was permissible or not excessive, per month, per rock ton, per ton of steel or any unit of measure or out
Jan 1, 1933
-
Single Stage Autogenous Grinding And Instrumental Control Of The C.S.A. Mine, CobarBy H. B. Muller
Single stage autogenous grinding of run-of-mine ore was selected by Broken Hill South Ltd., parent Company of Cobar Mines Pty. Ltd. for the concentrator to treat 60,000 tons per four weekly period of
Jan 1, 1970