Search Documents

  • AUSIMM
    Implementation of Acoustic Arrays for Semi-autogenous Grinding Mill?Operation

    By R Wynn, R A. Pax, S Mann, B Cornish

    The semi-autogenous grinding (SAG) mill at the MMG Century operation has failing load cells that are essential to the control strategy used to stabilise the mill. Currently, mill-bearing pressure is u

    Sep 1, 2014

  • NIOSH
    Experimental and Theoretical Measurement of the Aerodynamic Diameter of Irregular Shaped Particles (cb2693b4-8374-45fe-879f-1cccfef59f02)

    By W. E. Wallace, P. Bolsaltis, M. J. Keane, B. L. Rauaboni

    Thermal treatment of respirable size silica dust samples results in marked changes in their hemolytic activity. These changes can be correlated with changes in the characteristics of the particle surf

    Jan 1, 1988

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • CIM
    Investigating Total Media Wear

    By Peter Radziszewski

    "Comminition process costs, which typically represent an important contribution to mining operating costs, can themselves be divided roughly between energy and liner /charge wear. As such, developing

    Jan 1, 2001

  • TMS
    Biodegradable Starch/Copolyesters Film Reinforced With Silica Nanoparticles: Preparation And Characterization

    By Esperidiana A. B. Moura, Célio H. Wataya, Roberta A. Lima, Rene R. Oliveira

    Biodegradable starch/copolyesters/silica nanocomposite films were prepared by melt extrusion, using a twin screw extruder machine and blown extrusion process. The influence of the silica nanoparticle

    Jan 1, 2015

  • SME
    A Computer Program For The Analysis Of Coal Preparation Plant Economics

    By Richard D. Zigmond

    In this paper, a computer program that has been developed for determining the capital and operating costs for coal preparation plants is described along with its applications. The logic of the compute

    Jan 1, 1981

  • SME
    Prediction of Ground Vibration Induced Due to Single Hole Blast Using Explicit Dynamics Mining, Metallurgy and Exploration

    By R. K. Sinha, B. S. Choudhary, Desh Deepak, A. K. Mishra, Hemant Agrawal, Shankar Kumar

    There are several methods (empirical, statistical, and machine learning tools) to calculate blast-induced ground vibration. Still, due to complications in the blasting procedure, under varying blastin

  • DFI
    Design & Construction Of Pile Foundations For A Building Complex - A Case History

    By S. K. V. Avasarala

    This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c

    Jan 1, 1995

  • CIM
    Production of High Strength Pipe Steels by the CSP® Thin Slab Technology

    By J. Kempken, R. Hagmann, C. -P. Reip, W. Hennig

    The CSP technology symbolizes a highly productive process for the cost-effective production of steel grades with a range of sophisticated properties comprising both the inner quality of hot strip, its

    Jan 1, 2005

  • SME
    Boddington Gold Mine Expansion Project Overland Conveyor

    By T. Hollingsworth

    The Boddington Gold Mine, located near Perth in Western Australia, has recently completed the construction of a new process plant. An overland conveyor system was installed to convey the ore from the

    Jan 1, 2010

  • CIM
    Non-Metallic Coatings for Corrosion Protection

    By W. N. B. Armstrong

    CORROSION of metals, for the purpose of this talk, may be divided into two general classes, namely, atmospheric and chemical. Atmospheric corrosion is caused by the natural agents -water, air, salt,

    Jan 1, 1958

  • CIM
    Mineral Particle Interactions in Gypsum-Supersaturated Process Water

    By R. M. Beauchamp

    Base metal processing operations often treat process tailings and acid mine drainage using a high density sludge (HDS) water treatment process. Lime is used in this process, which reacts with existing

    Jan 1, 2006

  • TMS
    Energy Saving in Copper Electrowinning

    By C. Lupi

    "The energy consumption of copper production by electrowinning, generally represents more than 1/4 of the total energy requirement in hydrometallurgical traditional process (roasting, leaching, purifi

    Jan 1, 1997

  • CIM
    Optimisation of the Prominent Hill SAG Mill

    By Mark Weidenbach

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • AIME
    Part V – May 1969 - Papers - The Effect of Fabrication Variables on the Creep-Rupture Properties of Molybdenum-Base Alloys

    By R. L. Stephenson

    The effect of fabrication variables on the creep-rupture properties of TZM (Mo-0.5 pct Ti-0.08 pct Zr-0.03 pct C), Cb-TZM [columbium-modified TZM (7140-1.5 pct Nb-0.5 pct Ti-0.8 pct Zr-0.05 pct C)], a

    Jan 1, 1970

  • ISEE
    Blasting In Close Proximity to Densely Populated Communities

    By Radhe Krishna, Mutale William Chanda, Timothy Mwale

    Blasting as a process is the emplacement of industrial explosives into blast holes suitably located to a free surface and detonated. Every blast hole containing a certain amount of explosive charge un

    Jan 1, 2015

  • TMS
    New Developments for Sol-Gel Film and Fiber Processing

    By Alan J. Hurd

    "New insights into the development of microstructure in sol-gel films have recently been revealed by several diagnostic techniques, including imaging ellipsometry, ""chemical imaging"" by fluorescent

    Jan 1, 1994

  • CIM
    Metallurgical Practice at Golden Manitou

    By D. A. Livingstone

    Abstract Golden Manitou Mines, Limited, nine miles east of the town of Val d'Or in northwestern Quebec, are presently milling, at the rate of 1,000 tons daily, a relatively complex 3.11-phide or

    Jan 1, 1952

  • NIOSH
    RI 3587 Storage Of Subbituminous Coal In Bins ? Introduction (ec12c762-01de-4211-8def-cf4bdd33eeef)

    By V. F. Parry

    Subbituminous coal or lignite when stored in random riles or in ordinary bins in which the temperature fluctuates and air circulates quickly undergoes objectionable physical and chemical changes, whic

    Jan 1, 1941

  • NIOSH
    RI 3587 Storage Of Subbituminous Coal In Bins ? Introduction

    By V. F. Parry

    [Subbituminous coal or lignite when stored in random piles or in ordinary bins in which the temperature fluctuates and air circulates quickly undergoes objectionable physical and chemical changes, whi

    Jan 1, 1941