Search Documents

  • AUSIMM
    Dingo – an optimisation tool to solve complex short interval control at Telfer underground mine

    By S Graskoski

    The allocation of boggers and trucks at Telfer’s sublevel cave mine is currently assigned by manual techniques, with decision-making primarily dependant on the judgement of the operators and mine cont

    Oct 16, 2017

  • CIM
    Activation and Leaching Of Chalcopyrite Concentrate

    By K. N. Subramanian, H. Kanduth

    "It is well known that chalcopyrite can be dissociated into simple sulphides by heating with elemental sulphur at about 475°C:CuFeS2 + S -> CuS + FeS2Experimental work was undertaken to determine whet

    Jan 1, 1973

  • CIM
    Ore in Depth in British Columbia Mines

    By S. J. Schofield

    INTRODUCTION ONE of the greatest and most interesting problems of economic geology is to discover criteria bearing on the persistence of ore in depth. It is a question which is very much to the fore

    Jan 1, 1935

  • CIM
    Introduction to the Meliadine Project

    By M. Gaumont, F. Robichaud

    "Agnico Eagle Mines Limited (AEM) is a Canadian-based gold producer with operations in Canada, Finland and Mexico. In 2010, AEM produced its first gold bar in Nunavut, Canada as it started its Meadowb

    Jan 1, 2016

  • SME
    A Comprehensive Roof Bolter Drilling Control Algorithm for Enhancing Energy Efficiency and Reducing Respirable Dust (Mining, Metallurgy & Exploration)

    By H. Jiang, Y. Luo

    The study develops an automated, high-efficiency drilling control system to reduce respirable dust and increase energy efficiency in underground coal mines. It uses specific energy to evaluate efficie

    Feb 12, 2022

  • SME
    Development Of Equipment For Measuring Time-Dependent Deformations

    By M. W. Chanda

    This paper presents the development of a rock-creep measuring apparatus using air as the initial pressure source. Servo-controlled machines can and have been used for time-dependent property tests. Ho

    Jan 1, 1993

  • AUSIMM
    Miner Training at Aberfoyle Tin Limited

    By Coronel PT

    Like companies in other sectors of industry, mining companies are experiencing significant problems with low labour productivity, high labour turnover, and accidents. Increasingly, companies are

    Jan 1, 1980

  • NIOSH
    RI 7697 Methane Diffusion Parameters For Sized Coal Particles - A Measuring Apparatus And Some Preliminary Results (7cef55c1-6ad7-4273-8b18-677dfe4d9750)

    By R. J. Bielicki

    A sorption apparatus for measuring the equilibrium sorption isotherm and the rate of diffusion of methane from fine-sized coal was designed and constructed. Preliminary work that used Pittsburgh and P

    Jan 1, 1972

  • SME
    Genetic Algorithm Based Design of an Air-Injected Hydrocyclone

    By C. L. Karr, D. E. Goldberg

    This paper considers optimization of the design and operation of an air-injected hydrocyclone (AIHC) via a genetic algorithm (CAI. The AIHC is a mineral separating device, developed by the U.S. Bureau

    Jan 1, 1990

  • SME
    Opening and Development

    By Victor L. Steven

    10.1-SHAFT SINKING AND RAISING BY CONVENTIONAL METHODS VICTOR L. STEVEN 10.1.1-SHAFT SELECTION A great deal of thought and planning should go into the selection of a mine shaft to provide t

    Jan 1, 1973

  • AIME
    Institute of Metals Division - A New Method to Test Steel for Temper Brittleness (TN)

    By Abdul-Fattah K. Kaddou, P. C. Rosenthal

    THE authors have studied the problem of temper brittleness in steel1 employing an internal friction method. The specimens are in the form of wire, 14 B and S gage (0.064 in diam), 6 in. long. It wa

    Jan 1, 1961

  • ISEE
    Drill Monitoring & Navigation Systmes at BHP Billiton's Navajo Mine

    By John Vynne

    BHP’s Navajo coal mine installed drill monitoring and high precision navigation systems on their three overburden drills during 2002 and 2003. Details of the DrillNav system hardware and reporting sys

    Jan 1, 2007

  • NIOSH
    RI 2663 Friction Factors For Metal Mine Airways

    By G. E. McElroy

    [During the period July, 1923, to April, 1924, we made a large number of careful determinations of the resistance to the passage of air in selected sections of airways in the metal mines of Butte, Mon

    Jan 1, 1925

  • AIME
    The Tooele Plant Of The International Smelting & Refining Co.

    By H. N. Thomson

    GENERAL. THE Tooele plant of the International Smelting & Refining Co. is situated at the mouth of Pine canyon, Tooele county, Utah. It is connected with the main line of the San Pedro, Los Angeles &

    Jan 7, 1913

  • AUSIMM
    A design and construction methodology for deep mine development

    By E Villaescusa, C Drover

    The stability of access tunnels is one of the main engineering challenges in deep underground mine construction. Many underground hard rock mining operations are now reaching depths where the induced

    Nov 29, 2022

  • AIME
    Underground Mining - Subsidence at Merrittstown Air Shaft near Brownsville, Pa. (With Discussion)

    By F. W. Newhall, L. N. Plein

    During the latter part of the year 1931, the Republic mine of the Republic Steel Corporation, at Republic, about 4 miles south of Brownsville, Pa., was mining coal along four rib or fracture lines. On

    Jan 1, 1936

  • AIME
    Underground Mining - Subsidence at Merrittstown Air Shaft near Brownsville, Pa. (With Discussion)

    By L. N. Plein, F. W. Newhall

    During the latter part of the year 1931, the Republic mine of the Republic Steel Corporation, at Republic, about 4 miles south of Brownsville, Pa., was mining coal along four rib or fracture lines. On

    Jan 1, 1936

  • AIME
    Stabilization Of Bituminous Coal Industry

    By Herbert Hoover

    THE desire of the engineers over the last few years, growing out of their contact with public affairs, that this Institute should take a wider vision than the narrower field of technology and should a

    Jan 3, 1920

  • CIM
    Large Underground Blast at Inco Using Slurry Explosives

    By P. F. Venus

    In December 1977, a large pillar was removed by blasthole mining methods at lnco's Creighton No. 3 mine. Although the 2,363.000-ton blast was not a size record for a single underground blast at I

    Jan 1, 1978

  • AIME
    Institute of Metals Division - The Constitution Diagram Tantalum-Iridium

    By Nicholas J. Grant, William H. Ferguson, Bill C. Giessen

    Ta-lr alloys have been examined over the complete range of compositions using metallographic and X-ray techniques. The terminal solid-solubility limits, solidus temperatures, and intermediate phases w

    Jan 1, 1963