Search Documents

Sort by

  • AUSIMM
    Pressure oxidation circuit design for the Lihir Project, Papua New Guinea

    The Lihir deposit in Papua New Guinea (PNG) contains an estimated mineable reserve of 454t (14.6M oz) of gold in refractory sulphide ore. The Lihir Joint Venture has submitted a proposal to the PNG Go

    Jan 1, 1994

  • CIM
    Experience With Mine Roadway Steel Arch Supports in the United Kingdom

    By A. B. Szwilski

    The paper outlines the factors taken into account for the selection of steel arch supports. The results are based on experience using the long wall system of coal mining where roadway closure can be e

    Jan 1, 1979

  • ISEE
    Journal: Safety Talk / Safety Shortcuts -- The Longest Distance Between Two Points

    By Steven D. Sandbrook

    A man by the name of Louis Binstock once said, “Too often the shortcut, the line of least resistance, is responsible for evanescent and unsatisfactory success.”

    Jan 1, 2015

  • AIME
    From Indian Scrapings To 85-Ton Trucks: The Development Of Chino

    By W. A. Gibson, A. D. Trujillo

    The Santa Rita copper deposit first served as a source of native copper for Indian implements and weapons. In 1801 Santa Rita copper, trans- ported by mule train to Chihuahua, began to be used commerc

    Jan 1, 1966

  • TMS
    Overcoming the Challenges of Plantwide Control (1c61443a-08dc-4d11-b2ac-b217ab4e12e7)

    By John A. Herbst, William T. Pate

    "Plantwide control of mineral processing operations has long been sought for its potential benefits. These benefits include minute-to-minute optimization, reacting to disturbances in ore characteristi

    Jan 1, 1996

  • AUSIMM
    Estimating the Cost of a Feasibility Study for a Mining Project

    The cost of preparing a feasibility study is notoriously difficult to estimate. Studies for mining projects are typically commenced when an exploration programme has identified a mineable resource a

    Jan 1, 1990

  • IMMS
    Discovery Of Hydrothermal Fields At The Central Indian Ridge (Gemino Project)

    In 1983, the GEMINO research project (Geothermal Metallogenesis Indian Ocean) was initiated in order to locate and evaluate sites of recent or fossil hydrothermal activity in the largely unexplored In

    Jan 1, 1989

  • ISEE
    The Use of Large Diameter Blastholes Underground at Meramec Mining Company

    By James C. Irvine

    Meramec Mining Company's Pea Ridge underground mine is presently involved in a large scale pillar recovery program and has made use of both rotary and down-the-hole drills for large diameter blasthole

    Jan 1, 1976

  • AUSIMM
    Monitoring and Predictive Modelling of Subsidence in the West Moreton Coalfield

    An ongoing research program into surface subsidence over Room and Pillar coal mining is described. A subsidence monitoring network has been established for one Room and Pillar mine in the West Mor

    Jan 1, 1986

  • SAIMM
    Surface parameters for quantifying the hydro-mechanical anisotropy of rock discontinuities

    By W. Robert, J. Wirth, G. Grasselli

    ABSTRACT: Strength, deformability and fluid flow properties of rock joints are to a great extent controlled by the surface roughness. The hydraulic conductivity of a rock fracture depends on the aper

    Jan 1, 2003

  • ISEE
    The Journal of Explosives Engineering Vol 21 No 3 - Dynamite Daze

    I was lucky to land a job in the powder business. I was looking for some way to support my wife and first child to be when I saw an ad in the Hercules magazine, “Explosives Engineer” for technical rep

    Jan 1, 2004

  • SME
    Performance And Experiential Development Of The Mobile Miner At Mount Isa

    By R. J. Boyd

    SUMMARY The productivity of drill and blast methods of mining in hard rock is limited by the cyclic nature of the operation, and a plateau of performance has been reached, even with the most advanc

    Jan 1, 1987

  • SME
    Geologic Constraints on Mining and Recovering Coal in the Western US

    By Ralph J. Anctil, James E. Palmer

    According to relatively recent estimates by the US Geological Survey and the US Bureau of Mines, there are more than 0.9 Tt (one trillion tons) of remaining identified coal resources in the seven majo

    Jan 8, 1982

  • AUSIMM
    The Relationship of Structure and Ore Deposition at Stawell Goldfield, Victoria

    The Stawell Goldfield, the westernmost of the main Victorian fields, has produced over a million and a quarter ounces of gold from one and three-quarter million tons of ore. The lodes are quartz reefs

    Jan 1, 1960

  • AIME
    Iron and Steel Division - The Electrolysis of FeO-CaO-SiO2 Melts

    By Edward B. Dismukes, Walter R. Dickson

    Measurements of current efficiency at an iron anode during the electrolysis of FeO-CaO-SiO2 melts contained in an iron crucible indicate that compositions of high SiO5 content conduct current almost e

    Jan 1, 1962

  • TMS
    A Novel Electrometallurgical Process for the Treatment of Refractory Gold Concentrates

    By Nicole de Jager, Michael J. Nicol

    "In order to liberate gold from refractory gold ores and concentrates it is generally necessary to oxidise the surrounding sulphide minerals, typically pyrite and arsenopyrite. Traditional methods of

    Jan 1, 1997

  • SME
    Preparing A Feasibility Study Request For Proposal In The 21st Century

    By G. Wahl, H. Danilkewich, T. Mann

    Developers of advanced mining projects face the challenge of how to craft a “Request for Proposal for a Feasibility Study” that will result in bids that are comparable and will lead to a successful ex

    Jan 1, 2002

  • SME
    The Gold-Silver-Cyanide System A Thermodynamic Approach to Recovery Problems

    By J. L. Waldron

    This paper presents a theoretical tool used to analyze gold recovery problems at Dee Gold Mining Co. The first step in addressing the problem was realizing that lower gold extraction was linked to hig

    Jan 1, 1992

  • CIM
    Mining strategy for the Retreat Zone at Noranda’s Bell-Allard mine

    By D. Ouellet, G. Gagnon, B. Simser, V. Falmagne

    The mining sequence at Noranda’s Bell- Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modelli

    Jan 1, 2004

  • SME
    Geochemical Attenuation and Natural Biodegradation of Cyanide Compounds in the Subsurface

    By Roman Pyrih, Jim V. Rouse

    Because cyanide is a naturally-occurring chemical, geochemical and biogeochemical mechanisms exist to retard or attenuate the movement of cyanide and its compounds in the subsurface and to degrade suc

    Jan 1, 1991