Search Documents

Sort by

  • NIOSH
    RI 5993 Purification Of Electrolytes For The Deposition Of High-Purity Nickel ? Summary

    By J. G. Donaldson

    Nickel containing less than 0.01 percent of total metallic impurities was produced at the Rolla Metallurgy Research Center of the Bureau of Mines by electrodeposition from purified electrolytes. The f

    Jan 1, 1962

  • SME
    Solid Cast Polymer Tunnel Segments: The Corrosion Resistant Solution for Sanitary Sewer Tunnels

    By Richard A. Cubeta

    Precast concrete segments have been used in sanitary sewer tunnel design for decades. Federal mandates (reduction in heavy metals and I & I), and system design changes (increased retention times) and

    Jan 1, 2008

  • SME-ICGCM
    The Uniaxial Compressive Strength Of Coal: Should It Be Used To Design Pillars?

    By Christopher Mark

    The Bureau of Mines has recently completed a comprehensive study of coal strength. More than 4000 individual test results from over 60 seams were extracted from the literature and combined in the most

    Jan 1, 1996

  • IMPC
    Kinetic Study Of The Bioleaching Process Of Miduk Copper Sulphide Minerals By Modeling

    By S. N. Shahcheraghi

    Bioleaching method makes use of bacteria in solving metallic sulphides, so that these bacteria tend to convert insoluble metal sulphides into soluble sulphates. Since the kinetics description of this

    Sep 1, 2012

  • SME
    A Collaborative Role For A Mining School: Lifelong Learning In The Mining Industry

    By Malcolm Scoble

    This contribution examines the motivation and prospects for mining companies to become Learning Organizations and integrate Lifelong Learning into their culture. Mining Schools have a potentially cent

    Jan 1, 2005

  • NIOSH
    RI 8764 Velocity and Orientation Effects on the 10-mm Dorr-Oliver Cyclone

    By Andrew B. Cecala

    The Bureau of Mines conducted a brief laboratory study on the 10-mm diam Dorr-Oliver nylon cyclone to investigate (1) whether high wind speed (>300 ft/min), or sampler inlet orientation with respect t

    Jan 1, 1983

  • SME-ICGCM
    Outcomes of the Landmark Longwall Automation Project with Reference to Ground Control Issues

    By Michael Kelly

    Inertial navigation technology has, for the first time, allowed the position of a longwall shearer to be mapped in three dimensions. Following the success of the technology in highwall mining and succ

    Jan 1, 2005

  • ISEE
    The Power of Information using Self-Audits us Safety and Compliance Program Tools

    By Paul Downing

    A major component of an effective blasting company safety program is the self-audit. A self-audit can help reveal hazardous conditions that should be corrected and training needs that should be addres

    Jan 1, 2001

  • CIM
    A Possible Role for Pyrite in the Reductive Pyro De-Arsenification of Enargite

    By Yanping Xiao, Ton van Sandwijk, Gus Van Weert, Larry McHugh, Thomas Zabev

    "All attempts to remove significant amounts of arsenic from enargite via neutral or reductive pyro routes have required operating temperatures between 600 and 700 º C, too high to propose an equipment

    Jan 1, 2014

  • NIOSH
    RI 9432 - Rock Mechanics Investigations at the Lucky Friday Mine (In Three Parts)

    By M. E. Poad, J. K. Whyatt, T. J. Williams

    Researchers at the U.S. Bureau of Mimes monitored rock mass response to mining of an experimental underhand longwall stope in Hecla Mining Co.'s Lucky Friday Mine, Mullan, ID. This stope design,

    Jan 1, 1992

  • IOM3
    The database: a prerequisite for large-scale use of artificial intelligence in mining

    By S. Henley

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993 (original title: The database: a pre-requisite for large-scale use of AI in minin

    Apr 1, 1994

  • NIOSH
    IC 8042 Administration Of The Federal Coal-Mine Safety Act, 1952-60 ? Summary

    By James Westfield

    Following is a brief resume of the Division's activities that have had a favorable effect on health, safety, and the reduction of injuries at coal mines: 1. The Federal Mine Safety Code for B

    Jan 1, 1961

  • CIM
    Future Raw Material Needs of The Canadian Steel Industry Some Problems and Opportunities

    By R. J. Goodman, P. Lafleur

    This paper presents a current interpretation and projections of recent statistics on raw materials availability based on familiarity with the Canadian steel industry and its development. Problems and

    Jan 1, 1976

  • SME
    Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143

    By N. Merriam

    This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo

    Feb 24, 1997

  • SME
    Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs

    By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo

    The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.

    Jan 1, 2005

  • SME
    The Treatment Of Copper Ores And Concentrates With Nitrogen Species Catalyzed Pressure Leaching

    By C. G. Anderson

    Today, with a stringent economic and environmental climate prevailing in the copper business, there is increased interest in evaluating new processing alternatives for production. Hydrometallurgical p

    Jan 1, 2001

  • NIOSH
    IC 7010 Advanced Mine Rescue Training Course Of The Bureau Of Mines ? Introduction

    By J. J. Forbes

    The activities of the Bureau of Mines include the development and testing of self-contained oxygen breathing apparatus and other devices for respiratory protection, the development and tasting of devi

    Jan 1, 1938

  • SME
    Northside Storage Tunnel Project, Sydney: Tunnelling and Groundwater Control Beneath the Middle Harbour

    By R. A. Gee, G. B. Ashton, S. T. Warren, P. N. Groves

    Northside Storage Tunnel provides 500 megalitres (Ml) (130 million gallons) of storage capacity to capture stormwater/sewage overflows into Sydney Harbour. The6.6 m diameter TBM driven tunnel traverse

    Jan 1, 2001

  • NIOSH
    OFR-64-75 Proceedings Of The Second WVU Conference On Coal Mine Electrotechnology

    A compilation of papers presented at The Second WVU Conference on Coal Mine E1ectrotechnology in Morgantown, West Virginia on June 12 -14, 1974. Papers cover areas of electric power, electronic commun

    Jan 1, 1974

  • SME
    Using Proximity/Object Detection to Increase Shovel Productivity in the Open Pit Mine

    By E. Hsieh

    Proximity detection in the open pit mine can be used effectively as an operator assist strategy which improves digging production through enforcement of best practices, although it is normally thought

    Feb 23, 2014