Search Documents

Sort by

  • CIM
    Remediation of a Uranium Processing Facility

    By Ernest Becker

    Golder Associates provided overall radiological direction and assistance to the client in their interactions with the Canadian Nuclear Safety Commission and operational radiation protection services f

    Aug 1, 2010

  • CIM
    Pt-Bi intermetallic nanoparticles as electrocatalysts for oxygen reduction

    By D. Xia

    Pt-Bi intermetallic Nanoparticles was prepared by the polymer-anchor method. The electron micrographs shows that the dimensions of particles sharply distribute in the range of about 3-6 nm. The elemen

    Jan 1, 2005

  • AUSIMM
    Island Arc Geodynamics: A Model with Implications for Seismic and Magmatic Processes

    By Demin SS

    Slow seismotectonic movements along the in-clined deep fault zone under the compressional horizontal stresses are supposed to be the prin-cipal mechanism controlling the structure and processes in the

    Jan 1, 1990

  • NIOSH
    Application Of A Microphone Phased Array To Identify Noise Sources On A Roof Bolting Machine

    By J. Shawn Peterson, David S. Yantek, Adam K. Smith

    Exposure to excessive noise over time can cause permanent hearing loss. Workers in the mining industry are frequently exposed to A-weighted sound levels in excess of 90 dB. The A-weighted sound level

  • SME
    Ring-Geared Mills Operated With Frequency Converter (Much More Than Just Variable Speed)

    By T. R. von Ow

    The method of powering mills such as AG, SAG and Ball has a long and technically interesting history. It can be said that almost every decade in the last half century had its own trend. The trends wer

    Jan 1, 2010

  • CIM
    Some Crushing and Grinding Considerations in Plant Design

    By H. A. Steane

    "This presentation will cover some crushing and grinding considerations in plant design and operation. There is nothing basically new in the subject matter presented here; however, the viewpoint and i

    Jan 1, 1976

  • RMCMI
    Morning Session - Wednesday, June 29,1977

    Past President Ralph Moore opended the meeting at 9:30 a.m. He thanked all the committees for their part in making the 1977 meeting the success is was. He then turned the meeting over to President-ele

    Jan 1, 1977

  • DFI
    Pile Load Tests

    Case I- Timber Pile Test- 4 pages describe the pile driving record, the pile load test and the boring log. Case II- 24 inch square prestressed concrete pile-5 pages give details about the pile dri

    Jan 1, 1988

  • TMS
    Recovery of Components and Valuable Metals from Printed Circuit Boards

    By A. Gibson

    Most methods for the treatment of scrap printed circuit boards do not reclaim the components in working order as the boards are either fed to a copper smelter, to recover the valuable elements, or, si

    Jan 1, 2009

  • SAIMM
    Putting Beach Slope Prediction Into Perspective - Synopsis

    By R. J. Jewell

    The storage capacity of any given tailings storage facility (TSF) is a function of the volume available for the tailings, for which the geometry of the final upper surface of the tailings is most impo

    Jan 1, 2012

  • SME
    Lithium: A Review of 1999 Activities

    By M. Tamlin

    The state of the lithium mineral industry is closely linked to the performance of the glass and ceramic industries and to the overall economy. Demand for the glass/ceramic products in Europe, Asia and

    Jan 1, 2000

  • CIM
    Operation of a High-Density Tailings Thickener

    By Ernie Doell, Trung Nguyen

    "In early 1995 Cluff Mining commissioned a newly constructed high density tailings thickener at its Cluff Lake uranium mill. The 85 ft diameter high density thickener is one of the first of its kind i

    Jan 1, 1996

  • CIM
    Wash Water Optimization on an Iron Ore Spiral

    "Gravity concentration remains the main separation method for fine iron ore and is used extensively for treating various minerals. Gravity concentration methods separate minerals of different specific

    Jan 1, 2015

  • NIOSH
    Preventing Methane Ignitions At Longwall Faces

    By Fred N. Kissell, Andrew B. Cecala

    In This Chapter [Where methane is emitted at longwall faces Where methane accumulates at longwall faces Using the modified shearer-clearer to eliminate ventilation eddy zones Using a wa

    Jan 6, 2006

  • DFI
    Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam

    By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett

    "A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu

    Jan 1, 2017

  • AUSIMM
    Precipitation of Gold and Silver in Cyanide Solutions by Carbon

    THIS paper is the outcome of experiments carried on and experience gained. at the Waihi-Paeroa Gold Extraction Company's tailings plant at Waihi, New Zealand. The plant was erected to treat accum

    Jan 1, 1912

  • SME
    Alaska Way visit highlights Megaprojects conference in Seattle

    When defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,

    Dec 1, 2013

  • NIOSH
    RI 3122 Tests on Brick Klins Fired With a Stoker

    By R. R. Falier, W. E. Rice

    "PURPOSE OF REPORTThis paper presents the results of a series of tests made by the U. S. Bureau of Mines in cooperation with The Ohio State University Engineering Experiment Station as part of an inve

    Aug 1, 1931

  • AUSIMM
    Land Reclamation at Waihi

    One of the most significant problems experienced in land reclamation work has been the tendency of earthmovers to over-compact the subsoils and topsoils. The need for extensive subsoil drainage, becau

    Jan 1, 1991

  • SAIMM
    Some Pitfalls And Misuses Of Rock Mass Classification Systems For Mine Design ? Synopsis

    Rock mass classification systems are extensively used in rock engineering design work, and mine design is no exception. Among the systems most widely used for mining-related design work are the NGI 0-

    Jan 1, 2012