    A Large Scale In-Situ Compression Test On A 1.5m Coal Cube

    By Tadeusz Cyrul

    Results of a large scale compression test in situ are the subject of discussion. A cube of coal having an edge length of 1.5 meters was subjected to uniaxial compression tests in situ. At the same tim

    Jan 1, 1984

  • SME
    How a Plant is Constructed

    By George E. Aiken, B. R. Jr. Waples

    INTRODUCTION In this paper the author will attempt to bridge from the paper work of design and engineering to the reality of implementation. Certain facets of construction are constant to a succes

    Jan 1, 1986

  • SME
    Design Parameters Of Roof Support Systems For Pre-Driven Longwall Recovery Rooms

    By T. M. Barczak, S. C. Tadolini

    Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. The recovery en

    Jan 1, 2004

  • SME
    Generation And Entrainment Of Coal Dust In Underground Mines (ecda6593-a22c-439b-b205-b2bb56406ce3)

    By R. V. Ramani, J. Qin

    During the mining process, the in-situ material is broken into different size ranges, from very large pieces to very fine particles. Some of the fine particles become airborne. In underground coal min

    Jan 1, 1989

  • AUSIMM
    Future Planning Against Mineral Shortages

    As you are all aware, the theme of this con- ference is "International Resources Management". The subject matter of this particular session is "the mineral equation". Looking down the sub- ject matt

    Jan 1, 1978

  • SME
    Sources And Characteristics Of Quartz Dust In Coal Mines

    By Steven J. Page, Robert A. Jankowski, John A. Organiscak

    Quartz dust is one of the most significant ongoing health concerns in coal mining today. Since initial verification of this health risk in coal mines by the Mine Safety and Health Administration (MSHA

    Jan 1, 1991

  • AIME
    Sampling And Estimating Cordilleran Silver-Lead Limestone Replacement Deposits

    By Basil Prescott

    A thorough knowledge of the peculiarities of this type of orebody is necessary in sampling these limestone replacement deposits. Oxidized ores are often overestimated because of error in determining s

    Jan 3, 1924

  • AIME
    Acid Mine Drainage Quantity and Quality Generation Model

    By Vincent T. Ricca, Kurtis Chow

    When dealing with acid mine drainage as to treatment levels, costs, and evaluation of abatement schemes, predictions of the quantity and quality of the discharges are needed. An acid mine-drainage mod

    Jan 1, 1975

  • AIME
    Choice Of Geophysical Methods In Prospecting For Oil Deposits

    By E. De Golyer

    The only known direct method of discovering oil deposits is by the drilling of test wells. Such exploration is always hazardous and generally very costly. The problem of the prospector, therefore, is

    Jan 1, 1932

  • NIOSH
    Program Description (8a6a65e5-9080-4b9a-96d4-f8314d0d74a7)

    By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent

    A. 4 Illustrative Simulations The capabilities of the program are demonstrated by simulating various evacuation cases in different situations for a particular mine. The mine selected for the illust

    Jan 1, 1976

  • SME
    Investigation Of In-Pit Ore-Waste Selection Procedures Using Conditionally Simulated Orebodies

    By Y. C. Kim

    For the past few years, the Cyprus Bagdad Copper Company began experiencing a significant "ore-dilution" problem from its low grade open- pit copper mine located at Bagdad, Arizona. To pinpoint the ca

    Jan 1, 1982

  • SME
    Multiple Seam Mining

    By Matthew Spedding

    The complex nature of the carboniferous measures prevailing in the U.K. has dictated the types of mining required to exploit the coal seams. Most mines in Britain are referred to as deep mines in

    Jan 1, 1977

  • TMS
    Volatilization Behavior Of Minor Elements During Non-Isothermal Oxidation Of Copper Concentrate Particles Falling In One-Dimensional Laminar Gas Flow

    By Ho-Sang Sohn

    Copper concentrate particles of 200 to 300 mesh size were fed from the top of vertical reaction tube of 2.8 cm ID and 2 m long with an O2-N2 gas mixture. The reaction tube was heated to 900 K to 1100

    Jan 1, 2006

  • AUSIMM
    Blasthole Diameter and its Effect on Explosive Distribution

    A good blasting result is largely achieved by putting the right amount of explosive in the right place and firing it in the right sequence. The best blast design in the world will not break the roc

    Jan 1, 1990

  • TMS
    Wear Of Cu/WC Composites And Wear Model Application

    By Pranav Deshpande

    The wear behavior of metal matrix composites differs from that of the monolithic metallic counterparts because composite materials have multiple constituents in their structures and these constituents

    Jan 1, 2006

  • NIOSH
    Impact Breaker For Large Diameter Shaft Sinking ? Objective

    Reduce shaft sinking costs and workers exposure to mechanical hazards, drill dust, blast dangers, and fumes. Approach Replace drilling and blasting by using a large, cab-mounted impact breaker sus

    Jan 1, 1981

  • TMS
    Innovative Prospects For Nonferrous Metals Production In Russia

    By A. V. Tarasov

    The nonferrous metals industry has been a sector with one of the highest growth rates during the recent years. The prospects for the Russian metals industry during the period until 2010 are associated

    Jan 1, 2006

  • AUSIMM
    Mine to Mill Reconciliation - Three Case Studies

    By J T. Carswell, N A. Schofield

    Fluctuations in periodic reconciliations between the mine and the mill are an expected and common experience in mining and processing operations. These fluctuations are caused in part by errors in the

    Nov 20, 2012

  • NIOSH
    RI 9209 - Closed Loop Control for a Continuous Mining Machine

    By John J. Sammarco

    As part of a project to automate coal extraction, computer control of a continuous mining machine test bed has been developed and tested by the Bureau of Mines. A computer system and control software

    Jan 1, 1988

  • AUSIMM
    Optimisation of Coal Production from Mine Face to Customer

    The technology of coal preparation, while based on similar processes to those in common useage in the 1950s, has improved significantly over the past 15 years primarily due to advances in process cont

    Jan 1, 1992