Search Documents

Sort by

  • CIM
    Alkyl Arsines And U

    By J. Gogal

    Cameco's Cigar Lake Operation (CLO) started commercial uranium ore production in 2015. Initial mining was focused in areas of the ore body with relatively low concentrations of elements of concern (EO

    Jan 1, 2020

  • SME
    Predicting Utilization Rate of Hard Rock Slurry TBMs by Discrete Event Simulation Model - NAT2022

    By Anuradha Khetwal, Tala Tahernia

    The estimation of TBM utilization rate can be problematic due to the uncertainty involved in the tunneling system reaction to various geology along the tunnel. Moreover, the impact of operational and

    Dec 1, 2022

  • CIM
    Progress in Dust Control at Ontario Mines

    By Clifford S. Gibson

    A year ago a paper (1) was presented at the Annual Western Meeting of the Institute regarding silicosis in Ontario mines. It described the whole problem as we see it and discussed the means of prevent

    Jan 1, 1939

  • SME
    Metallurgical Developments At Palabora Concentrator

    By Johann Steynberg

    The design and construction of a Concentrator based on initial pilot plant work is rarely perfect. Palabora's plant was no exception although the basic objective to produce copper in a safely con

    Jan 1, 1985

  • CIM
    Lean Method to Identify Improvements for Operation Control at Quarry Sites

    By D. Rylander

    The operation of Quarry and Aggregate sites are similar to factory production, since it contains sequential production processes, tasks and activities to produce the output product. Compared to the pl

    Aug 1, 2013

  • SME
    Undercut And Fill Mining At Magma Copper Company's Superior Division ? Introduction

    By Joseph W. Murray

    Prior to 1950 Magma's ore production came from two parallel, steeply dipping, east-west striking mineralized faults, one called the Main or Magma vein, and the other the Koerner vein, which lay a

    Jan 1, 1973

  • IMPC
    A global sensitivity analysis for multiple products in a mineral processing flowsheet

    By Felipe Sepulveda, Edelmira Gálvez, Luis Cisternas

    "In mineral processing, the recovery and/or concentration of the value components cannot occur in one operational stage, therefore requiring the use of separation circuits based on several flotation s

    Jan 1, 2014

  • TMS
    High-Pressure Injection Of Air Into A Peirce-Smith Copper Converter

    By J. K. Brimacombe

    Plant trials have been conducted at the Tacoma Smelter of ASARCO to assess the effect on tuyere blockage and refractory erosion at the tuyere line, of increasing the injection pressure of air into a P

    Jan 1, 1983

  • TMS
    Arsenic Removal From A Nickel Concentrate

    Roasting treatments were investigated to remove arsenic from a nickel concentrate. The main arsenic minerals and their proportions in the concentrate were niccolite (NiAs)-50%, gersdorffite (NiAsS)-40

    Jan 1, 2005

  • SME
    Second Manapouri Tailrace Tunnel Design and Construction Considerations

    By Brian Heer, David Young, Randall Essex

    The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and

    Jan 1, 1997

  • AIME
    Expansion of Rosario Dominicana ' s Gold-Silver Cyanide Plant

    By Stanley M. Moos, Richard Addison

    Introduction The Pueblo Viejo gold-silver mine, located in the Dominican Republic, started production in early 1974 processing ores averaging 4 g/t gold and 20 g/t silver at a rate of 7.25 kt/d. The

    Jan 1, 1981

  • SAIMM
    Removal Of Unburned Carbon From Fly Ash Using A Cyclonic-Static Microbubble Flotation Column - Synopsis

    By Y. J. Cao

    The purpose of this study was to investigate the flotation behaviour of unburned carbon in a cyclonic-static microbubble flotation column (FCSMC). The ash sample, collected from a power station in Gua

    Jan 1, 2012

  • SME
    Expansion Of Rosario Dominicana's Gold/Silver Cyanide Plant ? Introduction

    By Stanley M. Moos

    The Pueblo Viejo gold/silver mine, located in the Dominican Republic, started production in early 1974 processing ores averaging 4 g/tonne gold and 20 g/tonne silver at a rate of 7,250 tonnes/day. The

    Jan 1, 1979

  • ABM
    Softening Behavior Of A Titanium Added Ultra-low Carbon Steel After Hot And Warm Deformation

    By Jônatas Venancio Barbosa, Dagoberto Brandão Santos, Túlio Magno Füzessy de Melo

    In this work, the mechanical and metallurgical behavior of titanium added ultra-low carbon (ULC-Ti) steel under hot and warm working conditions was studied by means of dilatometer compression tests. D

    Oct 1, 2019

  • SME
    Designing, Modeling, and Laboratory Testing of a Non-cloggingImpingement Type Filter for Mining Dust Scrubbers "Mining, Metallurgy & Exploration (2020)"

    By Ashish Ranjan Kumar, Steven Schafrik, Oscar Velasquez

    Flooded-bed dust scrubbers installed on continuous miners use fibrous type multi-layered filters to capture dust from the airstream. Prolonged operations of the scrubber could lead to filter clogging

    Sep 19, 2020

  • ABM
    Microstructural Evolution During Steckel Rolling And Ebsd Analyses Of Final Microstructure

    By Alisson Paulo de Oliveira, Altair Lucio de Souza, Jacson Morais Borges, Cleiton Arlindo Martins

    A customized version of the Microsim-PM software for one Steckel rolling mill was built and adapted for specific mill parameters. The focus of this study is to use this model, which predicts the auste

    Oct 1, 2019

  • TMS
    Computational Modelling Of Freeze Layers in Smelting Processes

    By Mark Cross, Andrew P. Campbell, Koulis A. Pericleous

    "Computational Fluid Dynamics (CFD) modelling is being used to simulate the freeze layers formed within direct smelting processes. There has been some concern whether water-cooled elements can withsta

    Jan 1, 2001

  • DFI
    Systematic Evaluation of Foundation Reuse for a Metro Station

    By Haoran Zhang, Chu Ho

    A recent design-build project in New York involved various degrees of additions and improvements to four existing transit stations. Reuse of the existing foundations was considered a more sustainable

    Sep 8, 2021

  • ISEE
    Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi

    Feb 6, 2023

  • SME
    Analog Computation In Mineral Process Simulation, Analysis And Control

    By K. J. Reid

    With the current trends of increasing costs and decreasing head grades the mineral industry is no longer operating in very high profit areas and has been forced to pay greater attention to the applica

    Jan 1, 1972