Search Documents

Sort by

  • AUSIMM
    Experiments on Rock Burst and its Control

    By L R. Sousa, M He

    Rock burst is common in deep underground excavations and is characterised by a violent ejection of block rocks from excavation walls. It is critical to understand the phenomenon of rock burst and part

    Nov 5, 2014

  • SME
    Overview and evaluation of smoke detectors in underground mines - SME Transactions 2011

    By C. D. Litton

    When methods to prevent the occurrence of fire in underground mines fail, the next line of defense is to rapidly and reliably detect the developing fire, so that subsequent evacuation and control proc

    Jan 1, 2011

  • AUSIMM
    Change Challenges for Large Open Pit Mines

    By R Durchholz, A-J Heiertz, R Schmitz

    Mining of lignite is the largest bulk materials handling activity in Europe. In order to mine this lignite, with an average calorific value of only a third of bituminous coal in an economical way, hig

    Sep 18, 2012

  • CIM
    Coal Preparation

    By G. A. Vissac

    METHODS of coal preparation have been greatly developed and improved during the past few years. Under the pressing competition from substitutes that have been displacing coal as a source of heat or po

    Jan 1, 1937

  • CIM
    Some Legal Unitization and Engineering Problems of Oil and Gas Producing Concerning Properties

    By D. W. MacFarlane

    In the formation of Oil and Gas Producing Units lawyer& and engineers are interdependent members of the same team. Management is, there-fore, entitled to expect no less than a total cooperative effort

    Jan 1, 1960

  • CIM
    Economic Safety

    By A. S. Bayne

    WITH the great increase in the use of power-driven machinery in industry, and consequent large-scale operations, the hazards to which , workmen are exposed have become much more numerous than at the b

    Jan 1, 1938

  • AUSIMM
    Rock Mass Characterisation and Analysis for Excavation Design – A Discrete Fracture Network Approach

    By F M. Weir, M Fowler

    The design of excavations in rock must, implicitly or explicitly take into consideration the influence of small- and large-scale geological structures. For most sites the complexity of a fractured roc

    Nov 5, 2014

  • SME
    A Summary Of Current Employment Practices In Mining Engineering

    By Charles O. Frush

    This paper presents a summary of the current employment practices with respect to recent graduates in Mining Engineering, as observed at the Colorado school of Mines. Because our experience is limited

    Jan 1, 1962

  • CIM
    Simulation of Extrusion Processes of Aluminum Profiles with Modeling of Microstructure

    By A. Ockewitz, A. Trondl, D. -Z. Sun

    "Numerical simulation of extrusion processes offers an efficient method for tool design and optimization of geometries and properties of extruded parts. However, until now there are few systematic inv

    Jan 1, 2018

  • SAIMM
    An automatic ladle level measurement system for monitoring ladle fill rate during tapping

    By A. Rödfalk, P. Bloemer, J. P. Nilsson, N. Brogden

    "Reliable and accurate metal transfer information during silicon tapping from an EAF is invaluable for decision-making and process optimization, while obtaining such information safely is a necessity.

    Jan 1, 2014

  • AUSIMM
    A case study in managing a high consequence geotechnical risk in a Queensland coalmine

    By K Young, M Martin, D Payne

    This paper outlines the evolution of managing high consequence risk scenarios in BHP Coal, with particular focus on managing the stability of an endwall that is adjacent to a public infrastructure cor

    Nov 29, 2022

  • AUSIMM
    Modelling Blast Movement for Grade Control

    By O Handayani, R Barr, E Isaaks

    The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los

    Aug 18, 2014

  • CIM
    Expert Control System of a Hybrid Pilot Rougher Flotation Circuit Including Predictive Models

    By Luis Bergh, Juan Olivares, Juan Durán, Juan Yianatos

    "In the last decades heuristic approaches based on logic rules have been one favored tool to control flotation units and plants on top of distributed control systems. Fundamental knowledge on flotatio

    Jan 1, 2016

  • CIM
    CIM Mineral Exploration Best Practice Guidelines

    By CIM Mineral Resource, Mineral Reserve Committee

    The CIM Mineral Exploration Best Practice Guidelines (the Exploration Guidelines) have been prepared to assist professional geoscientists and engineers to conduct consistently high-quality work in ord

    Nov 23, 2018

  • AUSIMM
    Digital geological mapping – pay-offs, pitfalls and pathways to successful mapping digitalisation

    By N Anderson

    The world-class Golden Mile gold deposit in the Eastern Goldfields of Western Australia is part of the Kalgoorlie Consolidated Gold Mines (KCGM) operation, which is wholly owned by Northern Star Resou

    Mar 22, 2022

  • SME
    Standing Support and Rolled Mesh for Safe and Efficient Tailgate Rib Control

    By J. Dubbert, T. H. Jones

    "This paper describes a rib-control methodology that uses standing support to provide most of the lateral resistance to the rib. The method is analyzed, and its boundary conditions for rib control are

    Jan 1, 2015

  • AUSIMM
    Enhanced Risk Reduction Using Early Warning Technologies Embedded in Active Explosion Suppression Systems

    By J J. L du Plessis, A Spaeth

    The objective of this paper is to demonstrate the efficiency of machine-mounted active explosion suppression systems (AESS). Their proven effectiveness against methane explosions is highlighted, as we

    Aug 31, 2015

  • NIOSH
    RI 6229 Methods For Producing Alumina From Clay - An Evaluation Of Three Sulfuric Acid Processes

    By Frank A. Peters

    A series of evaluations is being made to determine the relative processing costs of producing metallurgical-grade alumina from low-grade aluminous materials. These evaluations include the estimated op

    Jan 1, 1963

  • CIM
    Towards Sonic Injection in Peirce-Smith Converters: A Computational Fluid Dynamics (CFD) Modelling Study

    By G. A. Bezuidenhout, J. Davis, S. M. Bradshaw, J. P. T. Kapusta, D. K. Chibwe

    "This research work forms part of an assessment to complement the feasibility of implementing high pressure sonic injection into relatively small (2.25 m I.D by 3.66 m I.L) Peirce-Smith converters (PS

    Jan 1, 2012

  • DFI
    Lateral Response of Large Diameter Drilled Shafts in Clay

    By Ke Yang, Robert Liang

    "Drilled shaft foundations are widely used for many types of structures, especially for highway bridges, high rise buildings, and costal structures. The lateral design considerations are crucial for t

    Jan 1, 2005