Search Documents

Sort by

  • AIME
    Long -Range Production Planning Of Direct-Shipping Ore From Several Deposits

    By A. T. Janssen

    Production planning of direct-shipping ore from a number of relatively small deposits serves to sequence development and mining of these deposits so that both long- and short-range demand can be met w

    Jan 1, 1969

  • SME
    Economic Modeling And Optimization Of Closed-Circuit Grinding Processes

    By Y. Zimmels, C. Feldman

    Closed-circuit grinding processes are considered in the context of a reactor-separator circuit that involves multifraction streams and products. Because grinding circuits are low-efficiency, capital-i

    Jan 1, 1993

  • AUSIMM
    Grade Recovery Optimisation Using Data Unification and Real Time Gross Error Detection

    By R Linares

    The efficient operation of any modern metallurgical facility depends on the accurate measurement and estimation of flow rates, inventories, and composition of their intermediate and final products. Al

    Jan 1, 2005

  • NIOSH
    Analysis Of Longwall Pillar Stability (ALPS) Method For Sizing Longwall Pillars - Objective

    Improve ground control in longwall gate entries by developing a practical method for evaluating longwall pillar designs. Background Longwalls have emerged as the most important technology to be

    Jan 1, 1991

  • NIOSH
    Dry-Feed Spray System For Coal Mine Sealants - Objective

    Simplify the spraying of sealants onto coal mine roofs. Approach A nonclogging system in which dry-fed sealant is mixed with water down-stream of the spray nozzle, has been developed and tested

    Jan 1, 1979

  • SME
    Technology Research Improves Phosphate Economics

    By Paul Clifford

    The Florida Institute of Phosphate Research (FIPR) is an independent, state of Florida research agency. It was created in 1978 to conduct research to enhance the competitiveness of the Florida phospha

    Jan 1, 1998

  • AUSIMM
    Problems Associated with Sampling and Assaying for Gold in Mill Feed at Peko Mines Ltd.

    Prior to 1972, Peko Mines Limited at Tennant Creek used a central mill at Peko, which consisted of a gravity circuit, flotation and cyanidation of tailings, to treat their gold ore from surroundin

    Jan 1, 1978

  • AIME
    Growth Seen for Bauxite, Alumina and Metal

    Until the end of 1960, the small primary aluminum industry in Australia was run by the government. The entire operation was at Bell Bay on the north coast of Tasmania. It consisted of an alumina plant

    Jan 10, 1964

  • AUSIMM
    Geotechnical Investigations for Urban Road Tunnels in Sydney

    By Hosking IA, Mirkov P

    Among the solutions currently being considered for improving traffic flow in Sydney are the construction of major road tunnels, principally the Eastern Distributor Tunnels, leading from the end of

    Jan 1, 1987

  • NIOSH
    Fire Protection For Front-End Loaders - Objective

    Provide reasonably priced, reliable fire protection for front-end loaders. Approach Automatic fire sensing and suppression systems were developed and ruggedized for use on front-end loaders opera

    Jan 1, 1979

  • AIME
    Some Characteristics Of Roll-Type Uranium Deposits At Gas Hills, Wyoming

    By John W. King, S. Ralph Austin

    Spurred by recent forecasts of greatly increased demands for uranium by 1980 and beyond, interest is once again focusing on America's western uranium deposits. One of the principal producers in t

    Jan 5, 1966

  • AIME
    Chuqui

    A mine that staggers the imagination is Chuquicamata, the granddaddy of them all. In 1968 production exceeded 300,000 tons of copper. Production began in 1915 and mining proceeded solely on oxide ores

    Jan 11, 1969

  • CIM
    Automated Bridge Condition Assessment With Hybrid Sensing

    By R. S. Adhikari

    It is necessary to assess the physical and functional conditions of highway bridges at regular intervals to ensure they still meet their service requirements. Currently, this condition assessment is m

    Aug 1, 2013

  • SME-ICGCM
    Use Of Polymer Grids For Longwall Shield Recovery

    By Brian E. Travis

    The recent development of polymer grids for the underground coal mining industry has created new alternatives for supplemental ground control practices. The grids utilize strong, lightweight polymers

    Jan 1, 1990

  • AIME
    I. Isometric System

    By William E. Ford, Edward Salisbury Dana

    1. Normal Class (1) Galena Type 2. Pyritohedral Class (2) Pyrite Type 3. Tetrahedral Class (3) Tetrahedrite Type 4. Plagiohedral Class (4) Cuprite Type 5. Tetartohedral Class (5) Ullmannite Type

    Jan 1, 1922

  • AIME
    A Computer Procedure To Simulate Progressive Rock Failure Around Coal Mine Entries

    By M. T. Melvin, N. P. Kripakov

    The practical application of a post-processing modeling procedure to simulate progressive rock failure around the periphery of coal mine entries is presented. This numerical scheme utilizes a simple r

    Jan 1, 1983

  • AUSIMM
    New Backfill Binder and Method

    By M Grossi, G Baiden

    This paper describes a new mine backfill method based on a newly invented binder with several years of test results from laboratory and onsite applications. The new binder has several advantages over

    Jan 1, 1998

  • SME-ICGCM
    Roof Control With Polyurethane For Recovery Of Kitt Energy?s 1000-Foot Longwall

    By J. G. Stewart

    Polyurethane injection for the consolidation and control of broken strata is a common practice in the deep mines in Europe. The technology has gained wide acceptance in the coal mines of America since

    Jan 1, 1984

  • AUSIMM
    Deformation of Retreat Gatroad in Interpanel-Pillar System

    By Ichinose M, Tsuru T, Gotoh K

    Since 1980, the Department of Mining Engineering at Kyushu University, in co-operation with the Ikeshima Colliery, Matsushima Coal Mining Co. Ltd., has been conducting a research project into longw

    Jan 1, 1992

  • AIME
    Institute of Metals Division - Activation Energy for High Temperature Creep of High Purity Aluminum

    By H. I-Lieh Huang, O. D. Sherby, J. E. Dorn

    RECENT investigations1-4 have suggested that the total plastic strain, C, for high temperature creep under a given stress can be correlated by means of a temperature-compensated time, te- where t is t

    Jan 1, 1957