Search Documents

Sort by

  • SME
    Field Performance Testing Of Fully Grouted Roof Bolts (039d5b3f-0e88-4b7d-8661-f96f790d08a3)

    By C. S. Compton, D. R. Dolinar, D. C. Oyler

    More than 80% of U.S. roof bolts are fully-grouted, but about 1500 roof falls are reported each year. Anchorage failure of a fully grouted bolt can occur when the roof is active near the top of the ho

    Jan 1, 2003

  • AUSIMM
    Equivalent Rock Column Design System for Tunnel Liners and Underground Structures Incorporating Rock Restraint

    An approximate rapid design system for tunnel liners and underground structures is presented which permits the effects of structure geometry and stiffness, rock quality in terms of its deformation

    Jan 1, 1976

  • AIME
    Mining Methods At Pine Creek Mine

    By L. A. Wright, H. L. McKinley

    PINE Creek mine of Union Carbide Nuclear Co. is some 23 miles northwest of Bishop, Calif., in the Sierra Nevada Mts. Office and mill are 7800 ft above sea level, the 1500 level portal is at 9300 ft, t

    Jan 10, 1957

  • NIOSH
    RI 7981 Carbon Steel From Prereduced Pellets ? Acid Practice

    By W. L. Hunter

    Eleven steelmaking heats are described in this Bureau of Mines report in which acid practice was used to produce carbon steel from pre reduced iron ore pellets. Furnace slags obtained with no flux add

    Jan 1, 1974

  • NIOSH
    RI 7297 Structural Design Data For Unreinforced Concrete Tunnel Linings

    By J. D. Dixon

    The Bureau of Mines has developed structural design data for unreinforced concrete tunnel linings in the form of stress and deflection coefficients from which bending, axial, shear, and boundary stres

    Jan 1, 1969

  • NIOSH
    OFR-18-82 Operation Manual For Temporary Face Support System (TFSS) - Functional Description And Operation Of: 1. Beam And Post Carrier And Deployer (BAPCAD) 2. Post And Beams ? 1. Purpose

    1. PURPOSE The Temporary Face Support System (TFSS) consisting of beams, posts and carrying-emplacing equipment was developed to provide temporary supports between the working face and the permanen

    Jan 1, 1980

  • AIME
    Outdoor Substations , In Connection With Coal-Mining Installations

    By H. W. Young

    DEVELOPMENT of high-tension outdoor substations during the past few years has been due primarily to economic reasons. The demand for power in small communities could not be met with the conventional a

    Jan 9, 1919

  • NIOSH
    RI 8315 Tungsten Recovery From Searles Lake Brines

    By P. B. Altringer

    The Bureau of Mines conducted laboratory tests to devise a procedure for recovering a marketable grade of tungsten from the brine of Searles Lake, Calif. The brine contains only 56 parts per million o

    Jan 1, 1978

  • AUSIMM
    Coal and Minerals Comminution with High Pressure Waterjet Assistance

    By Galecki G

    The investigations conducted in the High Pressure Lab at the University of Missouri-Rolla demonstrated the ability of high pressure waterjets to excavate coal and minerals, disintegrate materials an

    Jan 1, 1993

  • AUSIMM
    Mechanised Tunnelling Technologies for Mining Applications

    The increasing global demand for rough materials forces almost every mine to look at the mechanisation in their processes. This will not onlyimprove performance but with safety issues becoming more an

    Jan 1, 2008

  • SME
    Design And Installation Of A 1818 Tonnes, 273 Meter Lift, Vertical Conveying System At White County Coal Pattiki 2 Mine, Carmi Illinois

    By S. Crewdson

    Vertical hoisting of materials using hoists and skips is common in the Mining Industry. These systems have a number of drawbacks, one being limited hoisting capacity at medium depths. FKC-Lake S

    Jan 1, 2003

  • NIOSH
    RI 6076 MgO-MgF2-SiO2 System At Two Levels Of Li2O And Na20

    By H. R. Shell

    The systems MgO-MgFa-SiO2, at 2 and 4 weight-percent Li2O and at 3.8 and 7.7 weight-percent Na2O were investigated by solid state reaction at 1,200° C. The results are summarized in four ternary diagr

    Jan 1, 1962

  • NIOSH
    RI 8075 Electrokinetic Densification of Hydraulic Backfill-A Field Test

    By R. H. Sprute

    Hydraulic backfill consisting of siliceous mill tailings was successfully dewatered and consolidated by electrokinetics in a field test conducted by the Bureau of Mines at the Star mine, Burke, Idaho.

    Jan 1, 1975

  • SME
    Favorable Results By Mixing Geology With Minerals Processing

    By H. P. Ehrlinger

    The Illinois State Geological Survey added Minerals Processing to its capabilities in 1966. Subsequently, the Minerals Processing Team and several Geologists collectively thought what neither would ha

    Jan 1, 2003

  • NIOSH
    Analyses Of Mine Samples

    By F. D. Osgood, H. M. Cooper, A. C. Fieldner

    The analyses in the tables are arranged geographically with respect to county and towns, and are grouped as follows: l The proximate analysis--moisture, volatile matter, fixed car bon, and ash; 2

    Jan 1, 1928

  • SME
    New Technology Transforms Coal Fly Ash To Mineral Filler

    Mineral Resource Technologies(MRT) and Michigan Technological University (MTU)finalized an agreement that permits MRT to offer an advanced carbon removal technology process for coal fly ash from an as

    Jan 1, 1996

  • ISEE
    Regulation Compliance: Security in Manufacturiing, Transportation, Storage and Use of Commercial Explosives

    By John Capers

    •The IME is the Safety and Security Association of the commercial explosives industry in the United States and Canada. •Founded in 1913 •Board of Governors •5 Standing committees- 1. Technical 2. Envi

    Jan 1, 2006

  • SME
    Message From Spokane: Environmental Policies Under Closer Scrutiny

    By Steve Kral

    Americans are taking a more critical view of various environmental laws because the effects of those laws are becoming more pervasive and intrusive, according to William Perry Pendley. And Secretary

    Jan 1, 1996

  • NIOSH
    OFR-27-78 Improved Fire Protection For Stationary Underground Equipment

    By J. L. Buckley

    A survey of previous underground mine fires revealed a number of reported fires may have been caused by malfunctioning stationary electrical equipment. Therefore, an evaluation of conventional fire pr

    Jan 1, 1976

  • CIM
    Oil Sands Tailings Storage Facilities: Design Considerations for Ease of Closure

    By N. A. Beier, N. Slingerland

    "Oil sands tailings impoundments rank among the largest (spatially) in the world, covering a total of approximately 220 km2 of northern Alberta, Canada. A preliminary geomorphic design for an oil sand

    Jan 1, 2019