Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Dragline Performance Evaluations for Tarong Coal Using Physical ModellingBy Lumley G. I, Hayes H
Non-intrusive methods for the reliable determination of dragline bucket and rigging performance have been achieved using physical modelling. Modelling offers a logical first step towards developing ma
Jan 1, 1992
-
Rotary Percussion Blasthole Machine May Revolutionize DrillingBy E. P. Pfleider, W. D. Lacabanne
Rotary percussive drilling, vibro-drilling, vibro-rotation drilling, rotary pulsating drilling-all names that mean the same thing-are gradually appearing in mining literature. What is rotary percussiv
Sep 1, 1955
-
RI 7856 Steam-Cured Bricks From Industrial Mineral WastesBy P. G. Pigott
This investigation by the Bureau of Mines demonstrated that building bricks can be produced by the steam-curing process from various types of industrial mineral wastes. Wastes, utilized to produce bri
Jan 1, 1974
-
Methodology Of Incident Recreation Using Virtual RealityBy M. Karmis
Promoting a strong safety culture requires that the significance of unsafe acts be emphasized. This can be achieved vividly by accurate recreation of unsafe actions in the workplace, demonstrating ex
Jan 1, 2003
-
Subsidence Monitoring To Verify Analytical ModelsBy Peter J. Conroy
Introduction Most subsidence monitoring to date has been surface monitoring to develop empirical relationships of the magnitude and extent of subsidence effects. Federal regulations are forcing a bet
Jan 1, 1982
-
RI 8681 Beneficiation of a Phosphate Ore Produced by Borehole MiningBy B. E. Davis
As part of its program to increase the domestic availability of critical minerals, the Bureau of Mines conducted characterization and beneficiation studies on a St. Johns County, Fla., phosphate ore t
Jan 1, 1982
-
Silica Dust Sources In Underground Metal/Nonmetal Mines - Two Case StudiesBy H. R. Grau
NIOSH’s Pittsburgh Research Laboratory is currently involved in research to identify silica dust generation in underground metal/nonmetal mines. The ultimate goal of this research is to develop con
-
Recent Drilling and Blasting Developments Groote Eylandt Mining Company Pty. LimitedBy Fitter JF
Drilling and blasting practices at Groote Eylandt are undergoing a period of rapid change. Practices over the last ten years are reviewed and some specific blasting problems currently being faced
Jan 1, 1982
-
High Pressure Water-Powered Scrubbers For Continuous Miner Dust ControlBy Robert A. Jankowski, Charles Babbit, Natesa I. Jayaraman
The Bureau of Mines, together with Foster Miller Inc., has developed a compact, high pressure scrubber system for continuous miners. Powered by water energy alone, it can move up to 1.4 m3/s (3,000 cf
Jan 1, 1989
-
Submerged Combustion Technology* Applied to Copper Slag TreatmentBy Leahy GJ, Wright DJ, Player RI
The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r
Jan 1, 1978
-
Seismic Event Data Acquisition and Processing: Distribution and Coordination Across PC-Based NetworksBy Brian Kenner, Peter Swanson, Todd Krahenbuhl
NIOSH has developed an automated PC-based seismic event (induced earthquake) monitoring system for use in mine ground control studies. The distribution and coordination of data acquisition and process
-
RI 8471 Recovery Of Byproduct Heavy Minerals From Sand And Gravel Operations In Central And Southern CaliforniaBy J. M. Gomes
The Bureau of Mines has investigated the occurrence and recovery of by-product heavy minerals from sand and gravel operations as a means of assessing the Nation's resources. Sand samples from 63
Jan 1, 1980
-
Furnace Cooling Technology In Pyrometallurgical ProcessesBy Karel Verscheure
Reliable furnace cooling technology is a domain of increasing concern to the pyrometallurgical industry as it can significantly increase process intensities, productivity and campaign times of furnace
Jan 1, 2006
-
RI 8049 Recovering Metal From Nonmagnetic Auto-Shredder RejectBy L. J. Froisland
An integrated process for recovering metal from nonmagnetic auto-shredder reject scrap was investigated by the Federal Bureau of Mines. The methods used were air classification, water elutriation, scr
Jan 1, 1975
-
RI 9396 - Copper Exchange Capacity of Clays and Their Potential Effect on In Situ Copper LeachingBy S. P. Sandoval, A. E. Clark, S. W. Yopps, J. S. Gomer
The U.S. Bureau of Mines conducted Cu exchange tests for six common clays under simulated in situ leaching conditions. Regression equations were obtained from the data expressing the Cu exchange capac
Jan 1, 1992
-
Improving Silica Dust Control Through Targeted ResearchBy Edward D. Thimons, Jay F. Colinet
NIOSH conducted a strategic planning effort to identify those areas in mining with the greatest research needs. Data analysis and stakeholder input identified the need to reduce worker exposure to res
-
Fuel Shortages Trigger A New Uranium Rush In New MexicoBy Eugene Guccione
For at least a decade, the energy crisis was accurately predicted by a small number of industry people who were ignored until last year, when they suddenly found themselves accused for their "lack of
Jan 8, 1974
-
Prediction of Solute Transport from Gold Mine Wastes, Coromandel, New ZealandThis paper describes a case history of using an integrated geochemical and hydrogeological approach to predicting solute transport from gold mine tailings in highly fractured volcanic terrain. Two m
Jan 1, 1988
-
Thermodynamic Network Simulation Incorporating Airway Heat and Moisture TransferA simulation program has been developed tc predict the airflow distribution and thermal environment in multi-level narrow lode Cornish =n mines. Because of the approximate equality between fan powe
Jan 1, 1988
-
Application of a Simplified Three-Dimensional Roof-Pillar-Floor Interaction Analysis Model for Subsidence PredictionBy Chugh Y. P
A simplified, three-dimensional, time-dependent, mechanistic model of the overburden-coal seam-floor interaction has been developed and validated at two Illinois coal mines. The model based on the
Jan 1, 1992