Search Documents

Sort by

  • SME
    Design And Construction Challenges At The Gualcamayo Mine ? Introduction

    By N. Ward

    The Gualcamayo Mine is located in the Andes Mountains north of San Juan, Argentina (Figure 1). A property of Yamana Gold Inc, it declared commercial production in July 2009 and has a total mineral re

    Jan 1, 2011

  • IMPC
    Optimising Flotation Innovations and the Role of Plant Testwork

    Optimising flotation designs and innovations is a complex process involving many parameters, one of which is ensuring sufficient testwork is carried out at plant level before these innovations are lau

    Jan 1, 2014

  • TMS
    Current Teniente Converter Practice At The Spl Ilo Smelter.

    By William E. Torres

    The Southern Peru Limited smelter, in Ilo, operates two reverberatory furnaces, seven Peirce-Smith converters, one Teniente Converter, two casting wheels and a single contact acid plant. The Teniente

    Jan 1, 1998

  • SME
    Jet Grout Ground Modifications for the Brightwater Conveyance System

    By Richard Hanke

    Tunnel construction on the Brightwater Conveyance System?s East and Central contracts required ground modifications of the existing site soils, comprised of sandy alluvium to very dense glacial till,

    Jan 1, 2008

  • AIME
    Papers - Occurance - Anthracites and Semianthracites in the United States

    By Allen J. Johnson

    Anthracite coals have been divided into three groups: (I) meta-anthracite, a high-carbon coal that is usually very slow to kindle and difficult to burn, at least on conventional equipment; (2) anthrac

    Jan 1, 1944

  • SME
    Risk Assessment/Management in the Environmental Planning of Mines

    By Steve Kral

    The list of environmental issues facing industry in general, and the mining industry in particular, has placed greater emphasis on the concept of risk assessment and risk management. In informal terms

    Jan 1, 1993

  • AIME
    Papers - Occurance - Anthracites and Semianthracites in the United States

    By Allen J. Johnson

    Anthracite coals have been divided into three groups: (I) meta-anthracite, a high-carbon coal that is usually very slow to kindle and difficult to burn, at least on conventional equipment; (2) anthrac

    Jan 1, 1944

  • AUSIMM
    Minimising the water loss associated with mine tailings disposal

    By C Vuillier, A Roshdieh

    Water is the main medium for removing impurities from iron ore during wet processing to achieve a higher quality product. However, there is a substantial increase in freshwater consumption due to an i

    Jul 24, 2017

  • AUSIMM
    Swedish Slot Raise Drilling Method at the Louvicourt Mine

    The Louvicourt Mine is located 600 km north of Montreal in the province of Quebec, Canada. The owners are Aur Resources Inc (30 per cent), mine operator, Novicourt Inc (45 per cent) and Teck Corporati

    Jan 1, 2002

  • SME
    The Party’s Over, Now What? - SME Annual Meeting 2025

    By Peter Werner

    Technological advances in mine equipment and milling processes have enabled mining companies to exploit ever lower grades of ore. The result has been larger disturbances, greater volumes of waste, a c

    Feb 1, 2025

  • SME
    Tom O’Neil: An Interview With the 2003 SME President

    The status and outlook for mining, in your view. Minerals remain a major part of the world’s economic foundation. The fortunes of the mining industry rise and fall with general economic trends, but m

    Jan 1, 2003

  • ISEE
    Gas and Dust Explosion Research at the UKERT Lab

    By Jaco van den Berg, Dr. Todor Petrov, Dr. Josh Calnan, Dr. Jhon Silva

    This paper shows and reviews the similitudes and differences in explosions generated by high explosives and gas explosions, the reasons why gas explosions are difficult to replicate using high explosi

    Feb 1, 2020

  • AIME
    Directory of Digita1 Computer Programs for the Mining Industry

    By J. F. Stiehr, R. L. Sanford, T. L. Myers

    This paper summarizes the development of a Directory of Computer Programs Applicable to US Mining Practices and Problems. The directory is funded by the US Bureau of Mines and includes a sampling of c

    Jan 9, 1979

  • AUSIMM
    The Continuous Miner and its Application to Pillar Extraction

    By Monger N. R

    Factors leading to the decision to use Joy Continuous Miners for pillar extraction in the Burwood Colliery are outlined. A detailed description is given of the Joy 1-CM-2 Continuous Miner, including t

    Jan 1, 1957

  • AIME
    Montreal (Annual) Paper - Titaniferous Ores in the Blast-Furnace

    By Auguste J. Rosh

    The use of titaniferous ores in the blast-furnace has been the subject of much controversy for many years. Divers objections have been raised against them, and, for one cause or another, the verdict

    Jan 1, 1893

  • AUSIMM
    The Estimation of Gold and Tin Alluvials in Malaya

    The presence of gold or tin in a particular place in payable quantities may be suspected from geological and prospE;cting reports. It behoves the engineer by judiciously spaced boreholes or pits to es

    Jan 1, 1942

  • IOM3
    Proposed changes in mineral legislation in the United Kingdom

    By Williams J. A.

    "Changes proposed in 1969 to modernize legislation governing the exploitation of mineral deposits in the United Kingdom serve as the basis for a discussion of what is considered to be a desirable fram

    Dec 30, 1971

  • DFI
    Design And Construction Of The Rion Antirion Brdoge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2005

  • SME
    Debiasing For Improved Inference Of The One Point Statistic

    By Michael J. Pyrcz, Clayton V. Deutsch

    Strategic project decisions are based on the distributions global variables, for example, total mineable resource, or recoverable oil volume. These global variables distributions are very sensitive to

    Jan 1, 2002

  • SME
    Development Of The Wiseda 220 Ton Rear Dump Hauler

    By A. E. Hunt

    Over the past twenty-live years since large scale truck haulage in open-pit mining began, the periodic introduction of Larger capacity vehicles has provided increased productivity and reduced costs.

    Jan 1, 1983