Search Documents

  • IOM3
    Underground Heatings at Lynemouth Colliery

    By M. Riddell

    This paper describes the incipient heatings that occurred below ground in the High Main and Main seams at the mine between the years 1963 and 1966. The possible causes, effects and activities associat

    May 23, 1905

  • NIOSH
    RI 3331 Progress Reports - Metallurgical Division - 14. Annual Report Of The Metallurgical Division, Fiscal Year 1936 ? Copper Metallurgy Section

    By Dean. R. S.

    The work of the copper metallurgy section during the year was devoted to laboratory studies of sulphur recovery from smelter smoke and combination smelting of copper and manganese. Both of these subje

    Jan 1, 1937

  • CIM
    New Threshold Limit Values for Gases in Europe and Resulting Problems in Mines

    By J. Weyer

    "Threshold limit values (TLVs) for NO and NO2 have been reduced drastically in 2016. Emissions of diesel engines have been reduced in the last decades. In many cases this is not enough to stay under r

    Jan 1, 2019

  • TMS
    A New Continuous Copper Converting Process

    By K. J. Richards

    The converting of copper mattes to blister copper has seen few technical advances since the introduction of batch furnaces using submerged tuyeres over a hundred years ago. The first side-blown conver

    Jan 1, 1983

  • TMS
    The Third Decade of Top Submerged Lance Technology

    By J. M. Floyd

    "Top submerged lance furnace developments started in CSIRO in the early 1970s and was given the name Sirosmelt. In the early work the technology was developed for tin smelting and processing tin slags

    Jan 1, 1996

  • SME
    Segment Design for Exceptional Circumstances: Post Tensioning and Squeezing Ground - RETC2021

    By Eduardo Velasco, Paz Navarro, Alfonso Navarro, Claudio Cimiotti, Alejandro Sanz, Nick Karlin

    The LA Effluent Outfall tunnel is a 7-mile long, 18' internal diameter, secondary treated effluent discharge tunnel currently under construction by Dragados USA for the Los Angeles County Sanitation D

    Jun 13, 2021

  • CIM
    Solvent extraction circuits

    By N. Dave

    "IntroductionIn the mineral processing industry, certain minerals such as uranium, thorium and vanadium, etc., are selectively extracted with high degree of purity from solutions containing variety of

    Jan 1, 1989

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • NIOSH
    OFR-81-80 Mine Trailing Cables And Cable Splices

    By Robert H. King

    An analysis of low-voltage shielded trailing cables is performed to develop a method for calculating the differences in operating costs between shielded and non-shielded cables. Two types of shield co

    Jan 1, 1980

  • SME
    Smart Air in the Underground Mine: Advancing Real-Time Ventilation Monitoring in Humid Underground Mines - SME Annual Meeting 2026

    By Max Friedemann, Franziska Günther, Helmut Mischo

    Ensuring adequate ventilation is a critical aspect of safety in underground mining operations. In small-scale mines in particular, key ventilation parameters such as temperature, humidity, and air vel

    Feb 22, 2026

  • SME
    Evaluation of Different Carbon Monoxide Sensors for Battery Charging Stations

    By L. Yuan, J. H. Rowland, R. A. Thomas

    "Hydrogen (H2) gas released during battery charging can result in cross-interference for carbon monoxide (CO) sensors used for early fire detection and compromise the integrity of the mine atmospheric

    Jan 1, 2018

  • NIOSH
    RI 3331 Progress Reports - Metallurgical Division - 14. Annual Report Of The Metallurgical Division, Fiscal Year 1936 ? Foreword

    By R. S. Dean

    This report, the second of a series of annual reports of the Metallurgical Division to be released in this form covers the fiscal year July 1, 1935, to June 30, 1936. The technological work of the

    Jan 1, 1937

  • ABM
    Danieli Universal Endless (Due) - The New Evolution Of Danieli Thin Slab Casting And Rolling Plant

    By Alessandro Pigani

    Over the last 25 years the thin slab casting and rolling process has been gaining a major market share in the production of hot rolled strip, progressively eroding the areas previously of exclusive do

    Aug 16, 2017

  • NIOSH
    Contributions To The Data On Theoretical Metallurgy ? XI. Entropies Of Inorganic Substances. Revision (1948) Of Data And Methods Of Calculation - Introduction

    By K. K. Kelley

    The first bulletin (269) 3 in this series, which appeared in 1932, compiled the entropy values then available for the elements and in-organic compounds, results being listed for some 150 substances. E

    Jan 1, 1950

  • AIME
    Modernization - An Answer to the Cement Industry's Dilemma

    By A. H. Tousley

    Current problems in the cement industry are discussed and suggestions for solving them by modernization are made. Cement facility modernization is discussed in considerable detail with examples illust

    Jan 1, 1972

  • CIM
    Improving the Process of Blending Consistent and Predictable Feed in the Nickel Smelting Process Using PGNAA Technology (e661f665-f6c8-4db9-ab1c-aa460f31422a)

    By A. Montera, M. Loken

    "The process of blending consistent and predictable feed for the roasters is critical for optimizing product quality and controlling production costs. To assist in this process, online PGNAA slurry an

    Jan 1, 2017

  • NIOSH
    OFR-47(1)-80 Interpretation Of Rock Mechanics Data - Vol. I (A Two-Dimensional Finite Element Approach To The Evaluation Of Underground Coal Mine Stability)

    By W. G. Pariseau

    A two-dimensional finite element program has been modified and extended to account for some of the rock mechanics complexities associated with single entry development of longwall coal mine panels. Pr

    Jan 1, 1978

  • NIOSH
    OFR-34-80 Develop Safety Practices For Electrokinetic Treatment Of Mine Waste

    By Charles E. Green

    This study was conducted to identify, evaluate, and develop procedures to minimize or eliminate safety hazards associated with the electrokinetic dewatering process, such as toxic and volatile gas emi

    Jan 1, 1979

  • CIM
    Adoption of High Oxygen Bottom Blowing in Copper Matte Smelting: Why is it taking so long?

    By Enzo Palumbo, Joël P. T. Kapusta, François Larouche

    In light of the rapid deployment of bottom blowing smelting in China over the last ten years, one has to wonder why it has taken the copper industry so long to adopt ultra-high oxygen enrichment via S

    Jan 1, 2015

  • SME
    Concentradora ?Do[n]a Aida? Design, Construction And Operation Costs

    By Adrian C. Dorenfeld

    Concentradora "Dana Aida" (100 t/d capacity) was built in 1971-1972 to treat dumps and ores containing mixed oxide-sulfide copper-gold-silver minerals from two veins. The veins, Don Felipe and aria ar

    Jan 1, 1979