Search Documents

  • AUSIMM
    Eight days entrapped – PT Nusa Halmahera Mineral’s rescue of a trapped miner

    By A Hilli, K Kosmara, J Steyn

    PT Nusa Halmahera Minerals (PT NHM) is an Indonesian joint venture company owned by Newcrest Mining Limited (75 per cent) and PT Aneka Tambang (Persero) (25 per cent). PT NHM operates two underground

    Oct 16, 2017

  • NIOSH
    IC 6323 Fire-Fighting Equipment and Organization of the Madison Coal Corporation, Glen Carbon, Madison County, Il

    By A. U. Miller

    Protection against fire is a greater problem at a coal mine, than at an ordinary industrial plant. Generally mines are located in isolated districts and do not have the protection of city fire departm

    Jul 1, 1930

  • TMS
    Study of Certain Parameters in Laboratory-Scale Smelting of Sivrihisar Laterite Ores of Turkey

    Conventional ferronickel smelting has five main steps: Drying, calcination, prereduction, smelting and refining. In the scope of the current work, smelting experiments were conducted using Sivrihisar

    Jan 1, 2012

  • AIME
    The Caddo Oil- And Gas-Field, Louisiana.

    By Walter E. Hopper

    (Wilkes-Barre Meeting, June, 1911.) I. LOCATION AND EXTENT. THE Caddo oil-field, shown in Fig. 1, is located in Caddo parish, northwestern Louisiana. The known producing territory of oil is covered

    Apr 1, 1911

  • AUSIMM
    Condition Monitoring at ERA - Ranger Mine

    By J A Evans

    A well-maintained and low cost mining operation today requires the use of condition monitoring techniques. At ERA - Ranger Mine oil analysis, vibration monitoring, infra-red themtography, and perfor

    Jan 1, 1994

  • AUSIMM
    Recent advances in tailings testing methods

    By D J. Williams

    The majority of surface tailings storage facilities continue to employ sub-aerial tailings slurry deposition. Surface TSFs are typically sized and operated in a way to minimise the initial capital cos

    Jul 23, 2018

  • AUSIMM
    Quality Assurance and Quality Control of the Interpretation of the Geological Economic Commodity Concentrations is Important in Getting a Mineral Resource Estimate Right

    The mining industry, both here and internationally, is continually developing increasingly sophisticated software to compute mineral resource estimates, but these processes cannot compensate for a fla

    Jan 1, 2007

  • AUSIMM
    The Mine Manager's Toolkit

    As the surrounding environment continues to change and evolve, mine managers face a changing climate of expectations. TodayÆs mine managers must juggle competing pressures to deliver sound social, env

    Jan 1, 2006

  • CIM
    And where are we going? Comminution, flotation and gravity separations

    By J. A. Finch

    In this paper, the author offers a personal view of what the next 30 years holds for mineral processing. Restating that mineral processing will remain a vibrant industry in raw material production, gr

    Jan 1, 1998

  • AUSIMM
    Comparing Different Prediction Techniques, and Field Results From South African Opencast Collieries

    By E de Necker, F D. I Hodg, L-M Cruywagen

    The acid mine drainage (AMD) situation at three opencast collieries in the Witbank Coalfield, South Africa, was evaluated from different perspectives. Twenty-seven test pits were dug into the spoils o

    Jan 1, 2003

  • SME
    The Discovery, Evaluation And Development Of Gold Occurrences At The Dome Mine, South Porcupine, Ontario - A Working Model For Archean-Type Deposits (7c07f7ef-a02a-49ca-85f9-92f9b8e390e0)

    By Dean S. Rogers

    The conventional role of exploration, development and grade control is examined in this paper within the context of the many and varied types of gold occurrences which are found at the Dome Nine. The

    Jan 1, 1984

  • NIOSH
    Mineral Indicators - Aluminum (3c9a6c0f-f8d7-4a06-8832-e98398516b54)

    Workers at the Consolidated Aluminum Corp. primary aluminum smelter at Lake Charles, LA walked out at midnight March 31 when their contract expired. Management personnel operated the smelter and preba

    Jan 1, 1979

  • IIMP
    Proyectos mineros que cumplen con las expectativas de la empresa

    By Dave J. Porter

    Si bien, los proyectos son el camino para que una organización minera cumpla con su estrategia, la gran mayoría de su historial de cumplimientos son un fracaso puesto que el impacto del proyecto no e

    Apr 1, 2012

  • SME
    Criteria For Selection And Application Of Rock Cutting Tools For Soft Rock Mining

    By Jan M. Andersson

    This paper will discuss the background information about rock cutting tools used for soft ground excavation, their history and evolution. A brief review of the current state of the art manufacturing t

    Jan 1, 1998

  • NIOSH
    OFR-7-84 Ground Control Mechanisms In Multi-Seam Mining - I. Introduction

    By C. Haycocks

    The problems caused by interaction in multi-horizon mining are world wide and are not limited to the coal industry. These problems will continue to increase as mining of new seams multiplies and repla

    Jan 1, 1983

  • SME
    Hierarchical Computer Monitoring And Grinding Control At Pinto Valley

    By J. C. Watts

    Monitoring and control of conventional industrial wet grinding circuits is conceptually straightforward. However, since production objectives and operating constraints can vary widely from plant to pl

    Jan 1, 1978

  • CIM
    Exploring Metal Recycling Business In China

    By K. Soga

    DOWA has long been specialized in the treatment of complex massive sulfide ores from exploration through smelting. Its competitive advantage derived from ore dressing technology to dress and concentra

    Jan 1, 2007

  • NIOSH
    IC 8014 Tungsten Deposits In Utah ? Introduction And Summary

    By F. D. Everett

    The Federal Bureau of Mines reviewed the status of tungsten deposits of Utah in 1959. Industrial requirements of tungsten during emergencies have exceeded the domestic supply, and a knowledge of the s

    Jan 1, 1961

  • AIME
    Annual Meeting, New York

    THE opening session was held on Tuesday evening, February 17th, in the house of the American Society of Civil Engineers. The President of the Institute, Mr. E. B. Coxe, after a few introductory rem

    Jan 1, 1880

  • NIOSH
    OFR-3(1)-80 The Development Of A Cross-Pit Overburden Handling System - Volume I - Preliminary Design

    By J. Ritchey

    This report describes the engineering feasibility and economic advantages of using a mobile bridge-type cross-pit belt conveyor system in conjunction with a large dragline to excavate and transport sp

    Jan 1, 1976