Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
RI 7082 An Electrolytic Process For Separating Nickel And CobaltBy T. A. Sullivan
Refining in a molten salt electrolyte was investigated as a means of recovering nickel containing less than 1 percent and preferably less than 0.2 percent cobalt from nickel products containing up to
Jan 1, 1968
-
New Approach In High Capacity Railroad To Ship Coal Terminal ? Economic BackgroundBy Paul Soros
A major share of the increase in the energy demands of Ontario province in the next decade will be supplied by bituminous coal mined in the U,S, To be competitive with alternative sources of energy, i
Jan 1, 1965
-
Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - SynopsisBy S. Narasimha Rao
Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc
Jan 1, 1996
-
Improved Hydrogen Storage Properties Of Mg(Bh₄)₂-Mg(Aih4)₂ Combined SystemsBy Qian Li, Haiyan Leng, Kuo-Chih Chou, Haoyuan Xiao, Zhigang Yu
Magnesium borohydride and Magnesium alanate were synthesized by mechanochemical metathesis reaction. The thermal decomposition behaviors of Mg(BH4)2-nMg(AlH4)2(n=0.5,1) systems were investigated as po
Jan 1, 2015
-
Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) MethodBy Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh
This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).
Jan 1, 1992
-
Process design of the Phola coal preparation plant - SynopsisBy G. M. Cresswell
The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing
Jan 1, 2010
-
Part VI – June 1969 - Papers - The Effects of Solute Additions on the Stacking Fault Energy of a Nickel-Base SuperalloyBy P. S. Kotval, O. H. Nestor
Stacking fault energy measurements of nickel-base alloys have been mainly confined to binary and ternary systems. In this paper, the stacking fault energy has been measured by the rolling texture meth
Jan 1, 1970
-
OFR-28-88 Potentially Critical MaterialsBy Russell J. Foster
In this Bureau of Mines report a selection process has identified 14 nonstockpiled materials (cesium, gallium, hafnium, indium, osmium, rhenium, rhodium, rubidium, ruthenium, scandium, selenium, tellu
Jan 1, 1988
-
High-Intensity Magnetic Separation of Industrial MineralsBy D. M. Ramsey
HIGH-INTENSITY magnetic separation as now practised in the commercial treatment of a large variety of industrial minerals is a com-paratively recent development, having had its practical beginning abo
Jan 1, 1937
-
Avaliação Da Temperabilidade, Microestrutura E Tenacidade De Tubos De Aço Especificados Pela Norma Api 5ctBy William Rodrigues Soares
Este trabalho apresenta uma avaliação da temperabilidade, microestrutura e tenacidade de dois tubos de aços (A e B) especificados pela norma API 5CT. O aço B tem um teor de elementos de liga maior que
Aug 16, 2017
-
Investment For Mineral Exploration And Development In Foreign Countries--Problems And Positive Factors ? IntroductionBy L. Nahai
In an exchange of views with the Program Chairman for the Technical Session on Industrial Minerals and Investment in Foreign Countries, it was agreed that it would be more interesting to approach the
Jan 1, 1976
-
A Review of Problems and Challenges in the Resource Estimation of High Nugget-Effect Lode-Gold DepositsBy A E. Annels, M D. Raine, I M. Platten
Lode-gold systems are often characterised by a high to extreme nugget effect (>50 per cent), and the presence of coarse gold particles (>100 ¦m in size). They rank amongst the most difficult of ore de
Jan 1, 2003
-
Development of the Rainy River Gold Project and Processing PlantBy Paolo Toscano, Dave Hall
"This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m
Jan 1, 2016
-
The Aeroplane in EngineeringBy Louis Huntoon
THE USE of the aeroplane in engineering work is quite recent. Its general application to all branches of engineering, including mining and metallurgical engineering, is increasing and its possible use
Jan 12, 1923
-
Melbourne City Link Tunnels: End PlayBy Ken Mathers, Tom Conley, Jim Rozek
The Melbourne City Link Tunnels have been constructed through a BOOT process, the largest undertaking in Australia to date. Tolling commenced on the 1.6 kilometer Domain tunnel in April 2000, and the
Jan 1, 2001
-
RI 6379 Linear Correlation of Magnetic Susceptibility With the Composition of MineralsBy Foster Fraas
Review of the literature on solid solutions discloses that the relation between composition and magnetic susceptibility is not linear . Recalculation using a transformation of composition values to pa
Jan 1, 1964
-
Frontiers In Cleat Extraction From The Combustion Gases Of CoalBy Elmer R. Kaiser
COMBUSTION of coal and transfer of heat from flames and gases to boiler surfaces continue to be of great interest to engineers here and abroad. Numerous investigations have been in progress to improve
Jan 3, 1954
-
RI 3920 The Metallurgical Research Program of the Bureau of Mines Relating to Iron and SteelBy R. S. Dean
"INTRODUCTION The metallurgical research program of the Bureau of Mines has been somewhat disorganized, but generally advanced by the increased activities of the war period. The present report is for
Jul 1, 1946
-
Effective Design of Tailings Pond Size for the Management of Iron Ore Tailings in Indian Context (ABSTRACT PAGE)By P. K. Sen, Mrinal K. Ghose
Tailing slurry is usually abrasive and possesses high viscosity. This paper examines the existing iron ore beneficiation process and focuses on some of the key environmental issues related to the disp
Jan 1, 2003
-
Distribution of Various Structural Species in Alkali Borate MeltsBy Zhijing Zhang
A thermodynamic structure model for alkali borate melts is developed to describe the distribution of structural groups in the alkali borate melts as a function of compositions. Fractions of threefold
Jan 1, 2001