Search Documents

  • AIME
    Institute Committees (5a3bd20e-0e6e-4d95-a7f3-fab4f18cce32)

    New York Meets first Wednesday after first Tuesday of each month. DAVID H. BROWNE, Chairman: PERCY E. BARBOUR, Vice-Chairman. A. D. BEERS, Secretary, 55. Wall St., New York, N. Y. C. A. BOHN, Trea

    Jan 1, 1917

  • SME
    Effect of coal on the corrosive wear of grinding media

    By A. S. Malicsi, M. D. Baker, I. Iwasaki

    Fine grinding may he required for- some coals to remove sulfur and ash or to prepare coal-water slurry. Fine grinding leads to increased hall wear and its effect on the surface properties of the groun

    Jan 1, 1991

  • SME
    Design Of Coal Preparation Plants Using A 32k Microcomputer

    By M. J. Laurila

    Utilizing data compiled from a drilling program and bulk samples taken from a coal reserve, flowsheet performance for a coal preparation plant can be calculated using a desktop computer. Sets of equat

    Jan 1, 1982

  • SME
    Investigation Of Porous Silicates Contamination With Crude Oil Using Dielectric Spectroscopy

    By C. Anastasiadis

    The wettability of sandstone was investigated using the technique of dielectric spectroscopy in the frequency interval 1kHz-1MHz. The natural wetness of the material was modified to get two different

    Jan 1, 2005

  • IMPC
    Multi-stage counter: Current circulation acid leaching process for extracting vanadium from stone coal

    By Yizhong Yuan, Dao Li, Nannan Xue, Tao Liu, Yimin Zhang

    A new multi-stage counter-current circulation leaching process for extracting vanadium from stone coal was proposed, and the main factors on multi-stage counter-current circulation acid leaching proce

    Jan 1, 2014

  • AUSIMM
    Recovery of Gold from Refractory Ores and Concentrates Using the Sirosmelt Reactor

    By Floyd J. M

    The recovery of gold from refractory ores and concentrates can be achieved in a number of ways using roasting and leaching procedures. The Sirosmelt system introduces a new approach to the recover

    Jan 1, 1987

  • AIME
    Arizona Paper - 2,000-Ton Leaching Plant at Anaconda (with Discussion)

    By Harold W. Aldrich, Frederick Laist

    After a series of experiments covering a period of about three years, extending from the spring of 1912 to the spring of 1915, a 2,000-ton leaching plant for the treatment of the accumulated copper co

    Jan 1, 1917

  • AUSIMM
    Data Acquisition and Management at Olympic Dam Mine Operations

    The Olympic Dam Mining Operation involves the supply of some 2.2 million tonnes per annum of ore feed for the metallurgical plant. To achieve this approximately 9 km of tunnels are developed per year

    Jan 1, 1992

  • AIME
    Block Caving - New York Meeting February 1941

    By Philip B. Bucky

    [CONTENTS t. How Does One Determine WhetherPAGE an ore Body Will Block-cave?R. W. Hughes13 Sherman R. Burdick 13 PAGER. T. Gallagher 14 Mark A. Smith 2 C. F. B. Price, Jr.14 Harry A. Leidich2Be

    Jan 1, 1942

  • AIME
    St. Louis Paper - October, 1917 - Ore Deposits of the Boulder Batholith of Montana (with Discussion)

    By J. A. Grimes, Paul Billingsley

    A. Introduction. 1. Association of Ores and Igneous Rocks. 2. Identity of Granite Rocks. B. General Geology. 1. Geologic Events of the Igneous Cycle. 2. Association of Igneous Intrusions with Tec

    Jan 1, 1918

  • SME
    Innovation and Its Management: A Production Manager's Perspective

    By Bruce Cavender

    Production managers look to innovative practices and equipment to reduce operating costs and improve efficiency. These innovations apply to both technical and social aspects of production operations a

    Jan 1, 1998

  • DFI
    2023 OPA Winner: Climate Pledge Arena

    By Meeok Kim, Thornton Tomasetti, Seth Knihtila, Michael Oakland, Shawn Leary

    The transformation of Seattle's historic KeyArena into the state-of-the-art Climate Pledge Arena, home to the NHL's Seattle Kraken, was no small feat. The $930-million renovation and expansion require

    Sep 1, 2023

  • RMCMI
    Morning Session Tuesday, July 3, 1962

    President Schloss called the third session of the fifty-eighth annual meeting of the Rocky Mountain Coal Mining Institute to order at 9:30 a.m. and introduced James Westfield, Assistant Director, Heal

    Jan 1, 1962

  • ISEE
    Harlan Diversion Project Upstream Portal Blasting

    By Paul Ross, Harry Burchett, Lou Case, Calvin J. Konya

    "The Cumberland River in Harlan, Kentucky has flooded the town for numerous years. TheU.S. Army Corps of Engineers funded a project to divert the river. The project consisted oftunneling through a mou

    Jan 1, 1993

  • AIME
    Meeting Of Board Of Directors (3c75717d-c7b6-41c5-8235-bd8fcd637ea7)

    At the meeting of the Board of Directors held Tuesday, Feb. 18, 1919, there were present nineteen Directors and the Secretary of the Institute. The following officers were elected for the year: A. R.

    Jan 4, 1919

  • AIME
    Personnel Service (8a9dc024-ce3c-490c-a218-885bd2e3b836)

    MEN AVAILABLE Engineering Manager, many years' experience in design, construction and operation of industrial plants and mining properties, requiring a knowledge of mechanical, electrical, civ

    Jan 1, 1952

  • AIME
    Personal (85b5911f-26c2-4196-b101-faae048c5c90)

    (Members are urged to send in for this column any notes of interest concerning themselves or their fellow-members.) Members and guests who registered at Institute headquarters during the period Dec

    Jan 2, 1915

  • TMS
    Molten-Salt Electrolysis Of Neodymium From A Chloride Electrolyte

    By M. F. Chambers

    Neodymium metal was electrowon from a molten-chloride electrolyte at 650° C using a molten-metal cathode. A 50 mol pct NdC13-50 mol pct KC1 mixture served as the electrolyte. Binary metal alloys of &a

    Jan 1, 1989

  • SME
    Design And Construction Of Access Shaft And Cross Adit Los Angeles Metro Rail Tunnel Contract A146

    By Wolfgang H. Roth, Stephen J. Navin, Samuel K. Louis, Anthony F. Stirbys

    This paper presents a case history of the design and construction of the access shaft and cross adit utilized to gain access to the Los Angeles Metro Rail tunnel alignment, at the A146 Contract site.

    Jan 1, 1989

  • NIOSH
    RI 6070 Flotation Of Spodumene From Pegmatites Of Cleveland County, N. C.

    By Thomas L. McVay

    The Bureau of Mines made laboratory batch and small-scale continuous flotation tests of a sample of pegmatite rock from a deposit of the Lithium Corporation of America, Inc., near Kings Mountain, N.C.

    Jan 1, 1962