Search Documents

Sort by

  • DFI
    Ground Vibrations from Pile and Sheet Pile Driving Part 1 — Building Damage

    By K. Rainer Massarsch, Bengt H. Fellenius

    "Abstract Vibrations generated during the driving of piles or sheet piles can affect buildings or installations in the ground. However, observed building damage is not always caused directly by dynami

    Jan 1, 2014

  • AUSIMM
    Landslide Stabilisation at the Clyde Power Project: A Major Geotechnical Undertaking

    Construction work on one of the world's largest landslide stabilisation projects is drawing to a close in Central Otago. Begun in mid 1990, major stabilisation work has been carried out on seven

    Jan 1, 1992

  • DFI
    Effect Of Surcharge Pressures On Excavation Support - Inconsistencies Between Design Calculations And Practice

    By Darrell Wilder

    When designing excavation support systems in urban environments, it is often necessary to consider the effect of vertical surcharge loads from adjacent structures. Several methods are used in practice

    Jan 1, 2006

  • CIM
    The Behaviour of Gold in Hemlo Mines Ltd. Grinding Circuit (aa6f7398-0561-40ff-b0b4-243c3a8474e3)

    By S. Banisi, J. Marois, A. R. Laplante

    "This paper compares the behaviour of gold and ore in the grinding circuit of Hemlo Gold Ltd. Particular attention is given to grinding kinetics, classification behaviour, and liberation. For grinding

    Jan 1, 1991

  • SME
    Actual vs. Baseline Tracking During TBM Tunneling In Highly Variable Glacial Geology

    By Ulf G. Gwildis

    The Bright water Conveyance System includes 21 km of tunnels mined by two earth pressure balance Tunnel Boring Machines (TBMs) and two slurry TBMs. The probabilistic baseline approach defined in the G

  • SAIMM
    Neural network performance versus network architecture for a quick stop training application

    The relationship between neural network (NN) performance and the parameters that form the architecture of the neural network is complicated. This paper studies an issue that is still controversial—the

    Jan 1, 2003

  • AUSIMM
    Macraes Gold Mine - Continuous Improvement of a Refractory Gold Treatment Plant

    By S R. La Brooy, T Giraudo, I C. Ritchie

    The treatment plant at the Macraes Gold Project in New Zealand processes a carbonaceous, refractory sulphide gold ore. Since its commissioning in 1990, there has been a programme of continuous improve

    Jan 1, 1998

  • SME
    Are Long TBM Tunnels Faster by TBM?

    By Nick Barton

    A recent analysis of 145 TBM tunnels of more than 1000km total length has helped to quantify the time dependence of utilization (U). In fact U = Tm, where T is time in hours and m is a negative gradie

    Jan 1, 2001

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003

  • SAIMM
    A Review Of Optimal Planning Of Level And Raise Spacing In Inclined Narrow Reefs

    By C. Musingwini

    The subject of optimal planning of level and raise spacing for inclined narrow reef deposits has received intermittent attention over the years because the subject matter is inherently complex. Previo

    Jan 1, 2010

  • CIM
    New Technology Provides Expanded Mine Design Options

    By Michael J. Kelly

    IAMGOLD?s Westwood project is the site for the largest, by volume, bored vent raise in North America. When completed, it will be the fifth largest bored worldwide in a single pass. This paper will re

    Oct 1, 2010

  • ISEE
    New Affordable, High-Sped, Solid State, PC Based Video Imaging Systems and Software

    By Don W. Lake

    Of all the blast monitor& instrumentation systems and techniques av&able today, highspeed photography and videography remain as the most valuable, stand alone, diagnostic techniques to evaluate full s

    Jan 1, 1992

  • SME
    Design Concepts For Tomorrow’s Optimized Solvent Extraction Mixer Settler

    By B. Gigas, M. Preston, M. Giralico

    Optimized mixer settler designs will now handle total flows of over 6,000 m3/hr.Computational Fluid Dynamics (CFD) is a timely and predictable tool for design development. Lightnin has the capability

    Jan 1, 2004

  • AUSIMM
    Prospects for Gold in New Zealand

    New Zealand has been a significant producer of gold for over a century. Total recorded production is over 850 tonnes. There were three major periods of production: the first and biggest was between 18

    Jan 1, 1988

  • DFI
    Deep Mixing in the United States: Milestones in Evolution

    By Donald A. Bruce

    "Abstract The Deep Mixing Methods (DMM), in their current forms, have been employed in the United States since 1986, although an earlier version had seen service from 1954. The earlier developments we

    Jan 1, 2014

  • NIOSH
    RI 6053 Effects Of Stress Relief And Other Changes In Stress On The Physical Properties Of Rock ? Introduction

    By Leonard Obert

    This report presents evidence indicating that when rock is stress-relieved during the course of mining or in drilling a core, it may be altered or damaged to the extent that the physical properties of

    Jan 1, 1962

  • SME
    Sulfate Reduction - Designing Systems For Long Term Treatment (238ad8d9-2dab-4d3c-a3f1-88274f1b5135)

    By J. Wagner, P. Eger

    Although lifetime estimates for sulfate reduction based on total substrate carbon typically range from 20 to 30 years, field and laboratory experiments showed that rates of sulfate reduction decreased

    Jan 1, 2001

  • CIM
    Atlas Copco drill rigs for mine automation and communication—A totally new technology platform for advanced mining systems

    By M. Ramström

    "In 2002, Atlas Copco Rock Drills AB released the new rig control system (RCS) technology for all of its drill rig types. RCS opened the way for a new generation of computerized drill rigs based on mo

    Jan 1, 2005

  • SME
    Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming

    By M. Kuchta, A. Newman

    LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use

    Jan 1, 2002