Search Documents

Sort by

  • CIM
    Pre-Reduction of Blast Furnace Burdens Using the S-L Process

    By F J. Pearce

    The Steel Company of Canada, utilizing the S-L process, has produced partially and highly reduced pellets for use in the blast furnace. Experimental blast furnace tests, using reduced pellet burdens,

    Jan 1, 1964

  • SME
    Visibility Of Surface Excavation And Impact Assessment

    By V. Dentoni

    The paper deals with the assessment of the visual impact generated by surface mining and quarrying. Previous research works proved the applicability of an indirect method based on the elaboration of d

    Jan 1, 2008

  • ISEE
    Flyrock Elimination Program Part 3: 3D Bench Photogrammetry

    By Brian Sandhuas, Robert McClure

    All flyrock incidents have the potential to result in injuries or fatalities that can result in loss of company reputation, license to operate with clients, and bear the exposure to high cost liabilit

    Jan 1, 2012

  • AUSIMM
    Mine Environment Monitoring - So what has Changed Since Moura No 2?

    By D Cliff

    "It has been 17 years since the mine disaster at Moura No 2 Mine in Queensland. Recent disasters in the USA and New Zealand prompt the question what has changed since 1994. This paper att emptsto answ

    Jun 1, 2012

  • IMPC
    Screens and cyclones in closed grinding circuits

    By Alban Lynch, Benigno Aquino, Hakan Dündar, Alexander Kalugin, Marco Delgado, Alberto Palomino, Ali Türkistanli

    Dynamic separators are efficient dry classifiers because new designs during the last 50 years have reduced the by-pass and improved the partition curve. By contrast cyclones have been used as classifi

    Jan 1, 2014

  • CIM
    Research on Asbestos Fibres

    By M. S. Badollet

    Introduction Very little fundamental research has been done on asbestos fibre to cake maximum advantage of its properties and to determine in what commercial products it can best be utilized. Fo

    Jan 1, 1948

  • SME
    The Next Generation of Mixed Ground Tunnel Boring Machines - NAT2022

    By Brad Grothen

    What is the most economical way of tunneling in mixed ground that may experience high pressures? Non-continuously pressurized, mixed ground Tunnel Boring Machines (TBMs) are being utilized to deal wit

    Dec 1, 2022

  • AIME
    Concentrating Lead-Zinc Ore at the Bayard Mill

    By P. V. Brough, K. B. Gillaspie

    DECISION to build a mill at the Bayard property was made in May 1942. Western-Knapp Engineering Co., of San Francisco, assisted by engineers of U. S. Smelting, handled the design and construction. Muc

    Jan 1, 1948

  • AUSIMM
    30 years of seismic system design, implementation and interpretation

    By J Player, G Sweby, S Webber, E Jones

    Seismic systems are a tool for the monitoring and forecasting the rock mass response to excavation. Common issues encountered at mine site audits and reviews are: how to design an effective seismic sy

    Nov 29, 2022

  • NIOSH
    IC 7392 A Mine Sewage-Disposal Study

    By R. T. Artz

    Disposal of sewage is an important part of mine sanitation. Improper... handling and.disposing of sewagerare conducive to the spread of disease and often add foul and nauseating odors to the mine air.

    Dec 1, 1946

  • TMS
    Recovery of Gallium and Arsenic from Gallium Arsenide Semiconductor Scraps

    By Dachun Liu, Wenlong Jiang, Guozheng Zha, Liang Hu

    In this paper, a novel technique for recovery of gallium and arsenic by thermal decomposition under vacuum is presented. The effects of distillation tem- perature on the volatilization behavior of eac

    Mar 1, 2018

  • CIM
    The Integration of Condition Monitoring into the Maintenance Process

    By Joel Werner

    Weak metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to remain c

    May 1, 2003

  • CIM
    Critical Aspects of Low Grade Ore Beneficiation

    "Beneficiation of low grade ores is the process of increasing the grade of a mineral through unit operations that remove and separate the waste (or gangue) material from the valuable mineral that can

    Jan 1, 2012

  • CIM
    Narrow Vein Stoping at No. 2 Mine, Central Patricia Gold Mines, Limited

    By J. R. MacDonald

    MINING literature contains very few descriptions of operations producing as little as 25 to 30 tons of ore per day. The purpose of this paper is to discuss the gradual development of a mining method f

    Jan 1, 1941

  • SME
    Winter field test for heap leaching Carmacks copper ore in Canada's Yukon Territory

    By W. J. Schlitt, K. McNaughton

    A heap-leach field test was conducted during the 1993-1994 winter season at Carmacks, Yukon Territory, Canada. The purpose of the test was to demonstrate the viability of heap leaching Carmacks oxide

    Jan 1, 2000

  • NIOSH
    IC 9513 - Proceedings Of The Second American Conference On Human Vibration

    There is a saying, ?If it moves, it vibrates.? This is especially true in our modern industrial environments, where workers use powered tools, machinery, vehicles, and heavy equipment. How workers are

    Jun 1, 2009

  • NIOSH
    OFR-3(1)-85 Caving Mine Rock Mass Classification And Support Estimation - Volume I - Final Report

    By Robert A. Cummings

    A rock mass classification system has been developed for recommending drift support requirements in block caving mines. This development follows a two-year program incorporating field observations of

    Jan 1, 1984

  • NIOSH
    OFR-186(1)-83 Development Of A Continuous Shaft Lining System - Volume I

    By Robert Torbin

    The objectives of the Continuous Shaft Lining (CSL) System are to reduce the costs, safety hazards, and time currently required in lining mine shafts with concrete. The CSL will line machine bored sha

    Jan 1, 1983

  • NIOSH
    OFR-82(2)-75 Probe Drill Guidance System - Volume 2 - Appendix A - Computer Program

    By Llewellyn A. Rubin

    ROUTINES AND SUBROUTINES A- 1 Wait Loop (Wait) A- 2 Receiver Processing (RCVP) A- 3 Control Panel Sequence (CPNL) A-4 Interrupt Routine (INTRP) A- 5 Math Processing Routine (PROC) A-6 Input

    Jan 1, 1973

  • NIOSH
    IC 7659 Petroleum And Natural Gas Research Program Bureau Of Mines, Fiscal Year 1952 ? Summary And Introduction

    By R. A. Cattell

    The conditions under which the researches of the Bureau of Mines on petroleum and natural gas were conducted in 1952 were little changed from those indicated in the last report,2/ which dealt with act

    Jan 1, 1953