Search Documents

Sort by

  • CIM
    Removal Properties of Boron from Wastewater Using Low-Crystalline Magnesium Oxide Synthesized by Low-Temperature Calcination

    By Masahiro Eguchi, Giuseppe Granata, Chiharu Tokoro, Hiroki Fukuda, Yuichiro Toba, Shungo Hobo

    "Currently, large amounts of wastewater containing boron are discharged from industries like coal-fired power plants. Although coagulation-sedimentation is widely employed for their treatment, only a

    Jan 1, 2017

  • AIME
    Summary (76e9633f-1bc4-4c53-8c7c-235824e9e8bb)

    By Thomas T., Read

    DESIRABLE as it is to summarize what has been set forth in preceding chapters, the task can only be approached with great hesitation. What follows represents the personal views of the author at the mo

    Jan 1, 1941

  • SME
    Managing Safety In The Mining Industry

    By F. Nelson

    RJB Mining is the largest coal producer in the UK. In January 1995 the Company acquired the Central North and Central South Regions of British Coal consisting of: ? 15 operating collieries -includin

    Jan 1, 1998

  • SME
    Roof Supports - What Remains To Be Done

    By Paul C. Lingo

    The title of my talk today might lead you to two logical conclusions: The industry is faced with a problem that requires a solution and after discussing the problem I will offer a solution. The first

    Jan 1, 1964

  • TMS
    On the Progress of the HDDR Process as the Microstructure Control Method

    By Takeshita. Takuo

    "In this work, the progress of the HDDR process is discussed mainly on the Nd-Fe-B magnet system. There are three technologies being used for the Nd-Fe-B permanent magnet production; the sintering tec

    Jan 1, 2000

  • TMS
    Safe Practices in Gas Handling at Magma Copper Company (3f972de0-117d-4ec3-b10d-0efd5a84064d)

    By Art Johnston

    Gas handling at Magma Copper Company's, San Manuel smelter receives process gas from a flash smelting furnace and four copper converters. The major gas handling equipment consists of four electro

    Jan 1, 1992

  • IMPC
    Optimizing Knelson Concentrator Performance in Gravity Gold Circuits

    By G. K. Nimal Subasinghe

    The performance of Knelson Concentrators (KC) used in gravity gold circuits often rely on manufacturers recommendations for selecting operating parameters such as, fluidising water flow rate and cycle

    Jan 1, 2014

  • TMS
    Smelting Mechanism in the Reaction Shaft of a Commercial Copper Flash Furnace

    By Zhou Jun

    Water-quenched samples were taken from a commercial flash furnace at three levels along its reaction shaft during operation at high feed rate. The samples were subjected to a series of analysis and ob

  • AUSIMM
    Who does the Marketing in the Race for Space?

    This paper has been developed for æThe Race for SpaceÆ conference. It ranges over various aspects, all of which are within the umbrella of marketing. The question is posed because many engineers, tunn

    Jan 1, 1999

  • SME-ICGCM
    The Use of the Area of Main Influence to Fix a Relevant Boundary for Mining Damages in Germany

    By Denise Mueller, Axel Preusse

    "In 2010, the fracking discussion in Germany caused a number of changes in German law, which came into force in 2016. Especially the production of gas had to be regulated. With the legislation amendme

    Jan 1, 2017

  • SME
    Utility of Mass-Balanced EH-PH Diagrams II: Stoichiometry of Cu-As-S-H2O System

    By H. Huang, R. N. Gow

    "Previously, Gibbs’ phase rule was applied to mass-balanced EH-pH diagrams for the Cu-As-S-H2O system. Diagrams were generated using the stoichiometry of enargite as a basis. In this study, the calcul

    Jan 1, 2015

  • SME-ICGCM
    Assessment of Rockburst Hazard by Quantifying the Consequence with Plastic Strain Work and Released Energy in Numerical Models

    By R. Kaund

    "Quantifying the rockburst consequence is of critical importance to reduce the hazards with preventative measures in underground mines and deep tunnels. Contours of energy components within a pillar m

    Jan 1, 2018

  • CIM
    Knowledge-Based Approach for 3D Reconstruction of as-Built Industrial Plant Models from Laser-Scan Data

    By H. Son

    The three-dimensional (3D) reconstruction of as-built industrial plant models plays an important role in revamping planning, maintenance planning, and preparation for dismantling during the lifecycle

    Aug 1, 2013

  • CIM
    The Cost and Effect of Labour and Equipment in The Modern-Day Coal Mine

    By A. Roy MacLean

    This paper outlines the changes in modern-day coal mining that have been brought about by the increased cost of labour and the use of new and highly efficient equipment. In the latter category are men

    Jan 1, 1969

  • TMS
    Treatment of Arsenic Sulfide Sludge for Arsenic Stabilization and Copper Extraction

    By Jianxin Zhang

    A process, in which arsenic in the residue is transformed directly into scorodite and copper dissolves into the solution simultaneously, was studied. The process was carried out in acidic ferrous sulf

  • AUSIMM
    Introducing and Sustaining a Continuous Improvement Program in Mines and Smelters

    By M Costa, L Polizzi

    Process optimisation and continuous improvement are usually acknowledged when making a process more effective, efficient and transparent. During the last few decades, thousands of companies around the

    Sep 1, 2014

  • CIM
    Evolution in Exploration Geology

    By P. A. Peach, W. H. Gross

    The modern economic geologist in Canada is well equipped to apply geological, geochemical or geophysical techniques in the exploration for ore. Recently, great advances have been made in geophysics an

    Jan 1, 1967

  • TMS
    Computer Simulation of the Structure-Energetical Transformations at the Combustion Synthesis in the Systems Ni-AI and Ti-AI

    By Gennadiy M. Poletayev, Mikhail D. Starostenkov, Alexandra S. Starostenkova

    "The process of the combustion synthesis was modeled by computer simulation using the molecular dynamics method. The set of the critical parameters regulating the velocity of the reaction was found fr

    Jan 1, 2001

  • CIM
    Prospects for Industrial Development in Cape Breton

    By John A. Teeter

    "A SHORT WHILE AGO I enquired about The Mining Society of Nova Scotia. In all honesty I was apprehensive about addressing such a body if it was highly geared to the technical aspects of discovering an

    Jan 1, 1972

  • Problems in Designing Stable Open-Pit Mine Slopes

    The general significance and possible effects of the ~ttit ud e of rock joints and faults, groundwater, overblastmg, and the geometry and character of stresses created by previous mining, gravity or t

    Jan 1, 1964