Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Experimental and Thermodynamic Modelling Study of the Effects of Al2O3, CaO and MgO Impurities on Gas/Slag/Matte/Spinel Equilibria In The “Cu2O”-“FeO”-SiO2-S-Al2O3-CaO-MgO SystemBy T. Hidayat, D. Shishin, S. Sineva, M. Shevchenko
The effects of the slagging components Al2O3, CaO and MgO on the thermodynamics and phase equilibria of the gas/slag/matte system with major elements “Cu2O”-“FeO”-SiO2-S are characterised using an int
Jan 1, 2019
-
Post Taphole Practices Adding ValueBy H. Hearnden
Whereas in the past, ladles were simply a means of transferring molten products from furnace tapholes to points of discharge be they casting pans or waste dumps, the ladle is now becoming a more integ
Jan 1, 2004
-
Epithermal Deposits and Analogous Geothermal Systems - A Physical Size Comparison with Implications for ExplorationBy J L. Mauk
Low sulfidation epithermal deposits are important sources of gold and silver, and are considered the extinct analogues of modern geothermal systems. The aerial extents of alteration halos that surroun
Jan 1, 2004
-
The Effect Of Laboratory Cell Design On Flotation Machine Hydrodynamics, Solids Suspension And Particle RecoveryA large lab apparatus was designed using a scale-down methodology based on the design legacy of the current FLSmidth commercial forced air flotation machines. This new apparatus, along with a new test
Jan 1, 2012
-
A Process for the Recovery of Cobalt from SpeissBy Fennell B
A process for the recovery of cobalt from a speiss produced at Sulphide Corporation is presented. The speiss is leached in oxygenated sulphuric acid to dissolve the metallic iron at a pH of around 4.
Jan 1, 1983
-
Critical Blast Design Parameters for Construction BlastingBy Tom Short
"Construction blasting covers a very extensive variety of explosive applications. I will discussseveral of these with you and then show slides from my collection, starting in 1956, which will betteril
Jan 1, 1991
-
Continuous Miner And Roof Bolter Dust ControlBy Gerrit V. R. Goodman
In This Chapter [Design and operation of machine-mounted scrubbers Dust control with scrubbers and blowing ventilation Dust control with scrubbers and exhaust ventilation Dust control w
Jan 6, 2003
-
A Snapshot Of Noise And Worker Exposures In Sand & Gravel OperationsBy E. R. Bauer
Previous studies and research efforts have shown that noise-induced hearing loss (NIHL) is a problem in the U.S. mining industry. This is especially true in surface and underground coal and stone min
Jan 1, 2008
-
Modelling And Control Of Copper Isasmelt FurnaceBy Pengfu Tan
One copper Isasmelt furnace has been operated in Xstrata Copper at Mount Isa in Australia since 1992. A thermodynamic model and computer program, CuModel, has been developed to model the distribution
Jan 1, 2006
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile DesignBy Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
Journal: The Kingdom ImplosionBy Douglas Anderson
Even though there is always a feeling of anticipation before a blast is detonated, most blasts are part of a day’s work. Once in a while there is an event that impresses even the most jaded blaster. F
Jan 1, 2001
-
Monitoring of Highwall Stability at the Dome Open PitBy John G. Henning
The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce
May 1, 2004
-
Mining - Drilling Practice in Swedish MiningBy Ingvar Janelid
DURING the last ten years, in the effort to save manpower and costs, methods of drilling and blasting in Sweden have changed and developed in a revolutionary manner. These developments have been accom
Jan 1, 1955
-
Innovative features of the Bridger Coal Company supply air fans and systemBy G. S. Takenaka
When Bridger Coal Company transformed their operations from surface mining to an underground longwall operation their plans included not only the addition of new mining equipment but also surface fans
Jan 1, 2009
-
Dust control in room-and pillar coal mining using continuous miners: Additional field evaluationsBy Y. P. Chugh
Additional field evaluations of a modified continuous miner using a new spray system and modified scrubbers have been conducted by the authors. In this demonstration, a comprehensive package for dust
Jan 1, 2009
-
Preliminary Research on Preparation Al-Si-Ti Alloy With Aluminum Ash as Electrolysis MaterialsBy Qingsheng Liu
A new method of recycling aluminum dross for preparation Al-Si-Ti alloy was studied in this paper. This was carried out in two processes. first the aluminum doss was pretreated by leaching and calcini
Jan 1, 2010
-
Geology and the Search for Mineral DepositsFor the purposes of this discussion it is assumed that contributors should express the thoughts that arise from their personal experience. So wide is the range of mineral deposits, and so varied the m
Jan 1, 1950
-
Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan OperationsBy A. Koski
A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U
Jan 1, 2007
-
Quantification and Controls on as Distribution in Westland, NZBy D Craw, J Pope
The Greenland Group, Westland, can be characterised with respect to environmental issues by the application of a GIS database (DAME), and specific sampling campaigns. Waters draining gold mineralised
Jan 1, 2006
-
Times Square Connection: ?Supporting The Cross Roads Of The World?By Victor F. Paterno
In December of 2007, a joint venture of J.F Shea, Skanska and Schiavone referred to as S-3II, was awarded a $1.15 billion (? 886,880,000) contract to construct the run-ning tunnels and station structu