Search Documents

Sort by

  • SME
    Assessment Of Stable And Failed Pillars In Underground Limestone Mines

    Pillars in underground limestone mines are required to support the overburden and provide a safe, stable working environment for mining personnel and equipment. Pillar stability was assessed by the Na

    Jan 1, 2008

  • SME
    Overview Of The Mineralogy Of The Biwabik Iron Formation, Mesabi Iron Range, Northern Minnesota

    By Peter L. McSwiggen

    The mineralogy of the Biwabik Iron Formation changes dramatically from west to east as the formation nears the basal contact of the Duluth Complex. This reflects a contact metamorphism that took place

    Jan 1, 2007

  • SME
    Overview Of The Mineralogy Of The Biwabik Iron Formation, Mesabi Iron Range, Northern Minnesota (920373f1-b6c7-4867-b2db-6fdc7d83ab71)

    By Peter L. McSwiggen

    The mineralogy of the Biwabik Iron Formation changes dramatically from west to east as the formation nears the basal contact of the Duluth Complex. This reflects a contact metamorphism that took place

    Jan 1, 2007

  • AUSIMM
    The Importance of Sampling in the Mineral Industry

    By R J. Holmes

    An accurate knowledge of the chemical, mineralogical and physical characteristics of ores and mineral products that are mined, processed and traded is crucial to effective resource utilisation, plant

    Jul 15, 2013

  • SME
    Industrial Minerals 2008 - Ball Clay

    By R. L. Virta

    Editor?s note: Each year, the June issue of Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue. Thank y

    Jan 1, 2009

  • SME
    Boddington Gold Mine Moves Closer To Production

    Construction of the Boddington Mine 130 km (81 miles) southeast of Perth, is about 89 percent complete. When the $2.9-billion development is finished, it will be the largest gold mine in Australia, pr

    Jan 1, 2009

  • SME
    Design and Construction Performance of a Large Diameter Tunnel Constructed in Soft-Ground by the Stacked Drift Method

    By Paul H. Madsen, Victor S. Romero

    The Tren Urbano project in Puerto Rico includes a 19 m diameter tunnel constructed by the stacked drift method, which involves installation of a pre-supported concrete arch using multiple tunnels. Geo

    Jan 1, 2001

  • SME
    Doe Run?s Sustainable Mining Operations Focused On Managing Lifecycle Of Lead

    By Jerry Pyatt

    Lead has been used by mankind since before the Egyptian pyramids were built. Its durability provides for a continuum of innovation. As the largest integrated lead producer in the Western Hemisphere, T

    Jan 1, 2008

  • SAIMM
    Pit Wall Failures On ?Unknown? Structures

    By Phillip M. Dight

    A number of impending and actual pit wall failures have been observed and documented which have been interpreted to initiate on newly generated structural features. This infers failure through intact

    Jan 1, 2006

  • NIOSH
    RI 5499 Zirconium-Hafnium Separation- Summary

    By William A. Stickney

    The zirconium-hafnium separation plant at Albany, Oreg., was the result of a chain of events that started with studies by A. R. Kaufmann at the Massachusetts Institute of Technology. Variations in the

    Jan 1, 1959

  • SAIMM
    Integration of imprecise and biased data into mineral resource estimates

    By E. Machaka, A. Cornah

    "Mineral resources are typically informed by multiple data sources of varying reliability throughout a mining project life cycle. Abundant data which are imprecise or biased or both (‘secondary data’)

    Jan 1, 2015

  • NIOSH
    IC 7000 Treatment And Sale Of Black Sands

    By M. W. Von Bernewitz

    Fay's glossary3/ of terms contains the following definition of "black sand": Heavy grains of various minerals which have a dark color and. are usually found accompanying gold in alluvial depos

    Jan 1, 1938

  • AUSIMM
    Palynofacies of the Eastern Margin of the Gippsland Basin

    An integrated palynological and sedimentological investigation of four wells from the eastern margin of the Gippsland Basin has resulted in a scheme for classification of palynofacies in this area.

    Jan 1, 1992

  • NIOSH
    RI 8297 Mechanical Properties of Cores Obtained From the Unleached Saline Zone, Piceance Creek Basin, Rio Blanco County, Colo.

    By Frank G. Horino

    Drill cores from 18 exploratory holes that were drilled into the unleached saline beds were tested for mechanical properties by the Bureau of Mines. Test cores were primarily selected from zones L4B,

    Jan 1, 1978

  • NIOSH
    RI 3610 Beneficiation Of Alunite ? Introduction (0bc4c843-f77c-4802-a3e8-7e9cfe26205c)

    By Alton Gabriel

    During the fall of 1940, J. R. Thoenen of the Mining Division, Bureau of Mines, accompanied by the senior author, surveyed the more important domestic alunite deposits. Although the study was designed

    Jan 1, 1942

  • NIOSH
    RI 3610 Beneficiation Of Alunite ? Introduction

    By Alton Gabriel

    During the fall of 1940, J. R. Thoenen of the Mining Division, Bureau of Mines, accompanied by the senior author, surveyed the more important domestic alunite deposits. Although the study was designed

    Jan 1, 1942

  • AUSIMM
    Several Approaches to Enhance the Bioleaching of Enargite

    Several Approaches to Enhance the Bioleaching of Enargite Some approaches were investigated to enhance the recovery of Cu from enargite by bioleaching with Acidithiobacillus ferrooxidans using the ga

    Sep 13, 2010

  • SAIMM
    The Application Of Cyclic Voltammetry Coupled With Surface Plasmon Resonance Measurements To Thiol-Collector Interactions With Gold Surfaces (4ab15224-caa7-44d5-8efa-b1cd96e7beac)

    Surface Plasmon Resonance (SPR) spectroscopy, combined with cyclovoltammetry, has been successfully used to study the interactions between ethyl xanthate, heptyl xanthate, dithio-phosphate and propyl

    Jan 1, 2005

  • TMS
    Metals Recover of Obsolete Mobile Electronics

    By Viviane Tavares

    The technology advance of mobile devices makes consumers of these equipment do more constant exchanges, with this the obsolete devices discarding becomes an environmental problem, due its landfill acc

    Jan 1, 2009

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991