Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Field-Scale Investigation Of Pulverized Coal Mill Power ConsumptionTwenty field-scale tests were conducted in a 28 MW pulverized coal power plant in Healy, Alaska, to examine mill power consumption in relation to coal grind size. The intent in this field-scale study
Jan 1, 2008
-
Pushback 8 South ? A Case Study In Pit Slope ManagementBy P Knight, P A. Walker, H E. Speight
Pushback 8 South is the final cut back on the south wall of the East Pit at BHPBilliton?s Mt Whaleback iron ore mine in the Pilbara region of Western Australia. Development of the cutback commenced i
Jan 1, 2006
-
Concentration of Igneous Phosphate Ores via Froth Flotation - Challenges and DevelopmentsIgneous phosphate deposits located in tropical and subtropical regions of the world are characterised by low P2O5 grades, very diversified mineralogy and intensive lateral plus vertical variations in
Sep 13, 2010
-
A New Method To Clean Dust From Soiled Work ClothesBy J. L. Howell, D. E. Pollock, A. B. Cecala, A. D. O’Brien
Dust from worker,s clothes has been shown to be a problematic source of personal dust exposure. A recently completed effort between NIOSH and the Unimin Corporation has resulted in a quick and effecti
-
Movements Due to Freezing, Thawing and Tunneling Beneath Two BuildingsBy K. E. Wood, K. J. DiRocco, L. A. Becker
The Russia Wharf segment of the Silver Line Phase II Project for the MBTA incorporated ground freezing and underpinning during New Austrian Tunneling Method(NATM) tunneling through timber pile foundat
Jan 1, 2005
-
Peak And Post-Peak Shear Strength Of Cement-BentoniteBy Paul J. Axtell
Self-hardening cement-bentontie (c-b) slurry walls were constructed as shear walls to stabilize the downstream slope of Tuttle Creek Dam near Manhattan, Kansas. The slope stabilization was required t
Jan 1, 2010
-
U.S. Bureau Of Mines Training Workshop On The "MFIRE" Mine Fire And Ventilation Simulator ? 1.0 IntroductionBy Linneas W. Laage
MFIRE is a computer simulation program that performs normal ventilation network planning calculations, and dynamic transient state simulation of ventilation networks under a variety of conditions. The
Jan 1, 1995
-
-
Application Of Hydrofracture Principles To Grouting In Deep Foundation ? SynopsisBy Z. M. Zhang
Fracture grouting is a particular technique which can be used in soils and rocks with low permeability to increase groutability and penetration rates and to solve some special foundation problems by i
Jan 1, 2010
-
Fluidized Bed Roasting Of Micro-Pelletized Zinc Concentrate: Part I?Pellet Strength And Roasting Kinetics - SynopsisBy S. Heukelman
Zinc or, a zinc refinery in South Africa, uses oxygen enrichment of up to 26% O2 in its fluidizing air to increase concentrate-throughput in its fluidized bed roasters. The aim of the study is to dete
Jan 1, 2011
-
Iron and Steel Division - The Influence of Carbon on the Activity Coefficient of Silicon in Liquid Iron-Carbon-SiliconBy David Schroeder, John Chipman
Jan 1, 1964
-
LIMPEZA DE GÁS EFICIENTE ENERGÉTICA - Design ótimo do sistema de ExaustãoBy Herrmann Flor
In steelmaking process, where up to 70% of variable cost of finished product is already incurred, energy and refractory costs account for 45-50% of the cost of production of crude steel and contribute
Oct 30, 2017
-
External L5?S1 joint moments when lifting wire mesh screen used to prevent rock falls in underground minesBy Sean Gallagher
Bolting large sheets of wire mesh screen (WMS) to the roof of underground mines prevents injuries due to rock falls. However, WMS can be heavy and awkward to lift and transport, and may result in sign
Jan 1, 2009
-
On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’By Phillip Cancilla, Daniel Roy, Frank Rosenblum
"The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti
Jan 1, 2001
-
Continuous Blasting Improvements At Landau Colliery ? SynopsisBy M. Rakoma
Following the blasting fatality on 17 December 2009, Landau Colliery was forced to change from the blasting practices that had been utilized since the start-up of the mine. Since then, attempts have b
Jan 1, 2013
-
The Balancing Act Of Size Vs. Cost Vs. PracticalityBy Org de Wet
This paper summarises the strategy for selection between a two module coal plant incorporating large, but less equipment, and a three module coal plant with more but smaller equipment. The two options
Jan 1, 2006
-
Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving DataBy Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami
For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve
Jan 1, 2007
-
Secant Pile Shoring - Developments In Design And ConstructionBy Eric S. Lindquist
High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t
Jan 1, 2011
-
Automatic Fire Protection For Surface Coal Augers - Objective:Reduce the danger to personnel and destruction of equipment caused by fires on surface coal augers. Approach: A reasonably priced reliable system which automatically senses a fire and activates
Jan 1, 1976