Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Why Accounting for Uncertainty and Risk can Improve Final Decision-Making in Strategic Open Pit Mine Evaluation

    The objectives of this paper are two-fold. First, it will show what problems can arise when single estimated values are substituted for a distribution of values when evaluating an open pit mine projec

    Jan 1, 2009

  • SAIMM
    The Effect of Solids Suspended in a Nickel Electrolyte on Deposit Morphology

    By K. G. Matshika

    "Nickel electroplating from sulphate electrolyte is an efficient process. To achieve good quality cathode, however, parameters such as temperature, nickel concentration, pH, electrode alignment, elect

    Jan 1, 2015

  • SME
    "SAFETY FIRST" in the development of underground mining machines

    By E. Lammer

    "Underground mining processes are dangerous. The design of mining equipment, which is able to cope with the hostile underground environment, is a challenge for all machine manufacturers. Presuppositio

    Jan 1, 2011

  • NIOSH
    Minor Metals - Cesium And Rubidium (096d63f4-744b-4c6a-8d0f-985747cf8613)

    By Charles T. Baroch

    RESEARCH strengthened the position of cesium as the preferred material (commonly but erroneously called "fuel") for ionic propulsion engines. Its use as an element of the plasma thermocouple for gener

    Jan 1, 1960

  • SAIMM
    Tiger?s Eye in the Northern Cape Province ? Potential for Employment Creation and Poverty Alleviation

    By P. F. Ledwaba

    South Africa?s Northern Cape Province houses a variety of gemstone minerals. Diamonds remain the primary gemstone in the province, but there are also tiger?s eye, sugilite, rose quartz, jasper, amethy

    Jan 1, 2014

  • CIM
    The integration of condition monitoring into the maintenance process (16e8fde4-e738-4229-a500-8c29dcc904ed)

    By M. W. Lewis, J. Werner

    Fluctuating metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to r

    Jan 1, 2005

  • AUSIMM
    Correlations among CO2, Cl, 3He and Heat Discharged from Geothermal Systems of the Taupo Volcanic Zone, New Zealand

    Based on relative CO2, N2, and 3He contents, geothermal systems of the Taupo Volcanic Zone, TVZ, can be subdivided into two major groups: arc-type systems, associated with andesitic magmatism along th

    Jan 1, 1995

  • ISEE
    Production Blasting with Electronic Delay Detonators at Peak Quarry

    By H G. Bosmare, G Bedser, C V. B Cunningham

    Peak Quany has achieved substantial improvements to its bottom lie by giving close attention to blasting practice, and in pr@icnlar by introducing electronic delay detonators for routine production bl

    Jan 1, 1998

  • SME
    Impact of deformable materials and convergence on the transverse load capacity of mine ventilation stoppings

    By T. J. Batchler

    Deformable materials are sometimes added to ventilation stopping constructions to prevent damage caused by convergence in coal mines. However, adding deformable materials can significantly reduce the

    Jan 1, 2009

  • AUSIMM
    Composition of Fluid Inclusions from the Hellyer and Mt. Chalmers VHMS Deposits, Australia: Implications for Source of Ore-Forming Fluids

    By C G. Ryan, T P. Mernagh, S R. Hunns, R A. Both, R R. Large, J B. Gemmell

     The Hellyer and Mt. Chalmers deposits are mound-style volcanic-hosted massive sulphide (VHMS) deposits in Australia. Textural, petrographic and microthennometric investigations of fluid inclusio

    Jan 1, 1995

  • SME-ICGCM
    Roof Bolter Rocker Pad Deflector Systems (6ff5d1f9-2211-4169-8a90-2ad9493ee24a)

    By Arnold Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby

    Jan 1, 2009

  • SAIMM
    Metallurgy Of High-Carbon Steels For Railroad Applications - Synopsis

    By R. Ordóñez Olivares

    This manuscript focuses on the design and development of steels for the railroad industry and methods of testing them. Here are summarized the results of research focusing on alloy development and des

    Jan 1, 2013

  • AUSIMM
    A Non-Linear Programming Model for Open Pit Mine Equipment Selection

    In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen

    Dec 6, 2010

  • SME
    Recovery Of Metal Values From Copper Slags By Flotation And Roasting With Pyrite

    By G. Bulut

    The recovery of copper and cobalt from ancient copper slags from the Küre region of Turkey was investigated. A fayalitic-type of ancient copper slag containing 1.24% Cu, 0.53% Co and 53.16% Fe were su

    Jan 1, 2007

  • AUSIMM
    Sulphur Deposits of New Zealand

    Owing to the increased consumption of sulphuric acid; Australian manufacturers have, from time to time, been seeking for a satisfactory source of sulphur that would make them independent of foreign su

    Jan 1, 1925

  • SAIMM
    Time-Dependent Tunnel Deformation At Hartebeestfontein Mine

    By J. D. Bosman

    The problems associated with squeezing rock conditions in tunnels are well known and have been extensively investigated in the past. Although squeezing conditions are predominantly found in tunnels de

    Jan 1, 2000

  • AUSIMM
    Modelling Channel Scale Flow in Heap Leaching Using Smooth Particle Hydrodynamics (SPH)

    Modelling Channel Scale Flow in Heap Leaching Using Smooth Particle Hydrodynamics (SPH)

    Sep 13, 2010

  • AUSIMM
    Erosion Driven Isostatic Flexure: A Structural Model for Gold Mineralisation in the Otago Schist, New Zealand

    By R H. Sibson

    The gold

    Jan 1, 1995

  • SME
    The Coronado Traffic Diversion Tunnel

    By Jon Y. Kaneshiro, Ed Walton, Stephen J. Navin, Robert M. Sergeant, Storer J. Boone

    The Coronado Traffic Tunnel is a proposed two-lane, reversible, road tunnel, which will relieve severe peak hour congestion problems on surface streets. The tunnel will take traffic from the Coronado

    Jan 1, 2001

  • AUSIMM
    Mine Planning Information from Photogrammetry Sources at the El Teniente Mine

    By P González, E Córdova, E Faundez

    An integrated mine system must be capable of displaying and reporting valuable information that can be used to easily understand, manage and take action on the key parameters being reported.One of the

    May 9, 2016