Search Documents

Search Again

Search Again

Sort by

  • AUSIMM
    Stream Sediment Geochemical Surveys: A Pilot Multielement Project Near Thames, Hauraki Goldfield, and Further Developments of the Regchem Database

    By J R. Goff, R Carver, D S. Sheppard

    The REGCHEM (Regional Exploration Geochemistry) stream sediment geochemistry database of open file mining company data, managed by GNS Science, was recently made accessible via the internet (http://ma

    Jan 1, 2006

  • AIME
    Industrial Minerals - Application of Electrostatics to Concentration of Coarse Pebble Phosphate

    By E. Northcott, F. N. Oberg

    By electrostatic separation, course Florida pebble phosphate, too lou-grade to find a ready market, can be upgraded to a satisfactory saleable product. Pebble running from 60 pct bone phosphate of tim

    Jan 1, 1959

  • SAIMM
    Strengthening Of A Cold Worked 17% Cr Ferritic Stainless Steel (Type 430) By Heat Treatment

    By M. Sephton

    Slat-band chains, currently manufactured from Type 430 ferritic stainless steel, are used as conveyors in various industries. A process to strengthen these chains?with the aim of prolonging the lifeti

    Jan 1, 1997

  • IIMP
    Sistema de gestión operativa

    By Marco Muñoz

    La mina Porvenir, perteneciente al Grupo Milpo, está ubicada en Cerro de Pasco, destacándose por la corporación de equipos de alta tecnología minera adecuada a sus operaciones. En ese sentido, el pre

    Jul 17, 2000

  • NIOSH
    The Geological Strength Index (GSI): A Characterization Tool For Assessing Engineering Properties For Rock Masses

    By Paul G. Marinos, Vassilis Marinos, Evert Hoek

    The Geological Strength Index (GSI) is a system of rock mass characterization that has been developed in engineering rock mechanics to meet the need for reliable input data related to rock mass proper

    Jan 5, 2007

  • ISEE
    3D Computer Simulation of Bench Blasting with Precise Delay Timing

    By Dale S. Preece

    "Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precis

    Jan 1, 2009

  • SAIMM
    An evaluation of the effectiveness of teamwork, with an emphasis on peer assessment and peer review, in an introductory engineering course

    By C. Daly

    "The Faculty of Engineering at the University of New South Wales (UNSW) offers a core first-year engineering design and innovation course,ENGG1000, undertaken during the first and second semesters. Th

    Jan 1, 2014

  • CIM
    Effects of blasting on damage and grindability of impacted rock

    By C. Pelley, S. Kelebek, G. Kunzel, S. Gregersen, M. Pollanen

    A series of small-scale tests was conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the material properties of the rock as well as its resistance to crushing and

    Jan 1, 2006

  • ISEE
    Drill Monitoring and GPS Developments and their Impact on the Drill to Mill Process

    By John Vynne

    Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter

    Jan 1, 2000

  • SAIMM
    Common-Sense Improvements To Electric Smelting At Impala Platinum (J o u r n a l P a p e r)

    By V. Coetzee

    In 1992, a paper was compiled highlighting a common-sense approach to electric smelting at Impala Platinum. Since then, the smelter complex has undergone considerable changes. Mineral economics, UG2 e

    Jan 1, 2006

  • NIOSH
    OFR-114-93 Ecosystem Management And Mine Permitting In Alaska

    By Patrick D. Plumb

    The Juneau Office of the U.S. Bureau of Mines has undertaken a study of the environmental permitting process for major mines in Alaska to identify the effects ecosystem management has had or could hav

    Jan 1, 1993

  • SME
    Small footprint, big challenges: Design and construction of the Allen Park storage tunnel

    By Brain E. Gombos

    The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary

    Jan 1, 2013

  • NIOSH
    OFR-58-84 Development And Analysis Of Slurry Transport Systems In Longwall Mining Of Coal

    By Tuncel M. Yegulalp

    This final report contains the results of all work performed under BOM Grant J0333905. A preliminary systems analysis of coarse-particle coal slurry pipelines as a haulage method for longwall mining s

    Jan 1, 1982

  • RMCMI
    Highwall and Spoils Design and Monitoring

    By Tim Peterson

    Factors Controlling Stability Stability of slopes in soft rock, waste dumps or soils is governed by three factors: ?Slope configuration ?Groundwater ?Shear strength

    Jan 1, 2004

  • SME
    Observation Methods Using Real-Time Surface Settlement Monitoring On The South Toulon Tunnel Project

    By B. Caro Vargas

    The Toulon Tunnel project is a key component of the highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig

    Jan 1, 2012

  • NIOSH
    RI 9333 - Evaluation of the Safety of the CSE SR-100 Self-Contained Self-Rescuer

    By R. W. Watson

    A belt-wearable self-contained self-rescuer (SCSR) manufactured by the CSE Corp. and designated the "SR-1OO" was evaluated for safety in the underground mine environment by the U.S. Bureau of Mines. T

    Jan 1, 1991

  • SME
    Continuous Improvement And Teamwork Are The Keys To Success At Phoenix Mine

    By Scott Ellenbecker

    The formation in Newmont Mining?s Phoenix Mine near Battle Mountain, NV contains high levels of abrasive quartzite as well as gold, copper and silver. Newmont started mining operations at Phoenix (for

    Jan 1, 2009

  • NIOSH
    IC 7741 Drill-Dust Collectors Approved By The Bureau Of Mines As Of January 31, 1956 ? Introduction

    By C. W. Owings

    One phase of Bureau of Mines health and safety work is promotion of the use of safe and effective dust-collecting devices in connection with rock drilling in coal mines. To insure that adequate equipm

    Jan 1, 1956

  • NIOSH
    IC 8032 Pulverizing Lignite In A North Dakota Powerplant ? Introduction And Summary

    By R. C. Ellman

    Since successful industrial lignite-burning equipment was developed in 1925, the commercial use of lignite as a fuel for power plants has increased. It has proved an entirely satisfactory fuel for gen

    Jan 1, 1961

  • NIOSH
    IC 9217 Practical Considerations In Longwall Face And Gate Road Support Selection And Utilization

    By Thomas M. Barczak

    The U.S. Bureau of Mines has been conducting research to optimize the design and utilization of mine roof support systems. An objective of these efforts is to evaluate the mechanical and structural re

    Jan 1, 1989