Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Stream Sediment Geochemical Surveys: A Pilot Multielement Project Near Thames, Hauraki Goldfield, and Further Developments of the Regchem DatabaseBy J R. Goff, R Carver, D S. Sheppard
The REGCHEM (Regional Exploration Geochemistry) stream sediment geochemistry database of open file mining company data, managed by GNS Science, was recently made accessible via the internet (http://ma
Jan 1, 2006
-
Industrial Minerals - Application of Electrostatics to Concentration of Coarse Pebble PhosphateBy E. Northcott, F. N. Oberg
By electrostatic separation, course Florida pebble phosphate, too lou-grade to find a ready market, can be upgraded to a satisfactory saleable product. Pebble running from 60 pct bone phosphate of tim
Jan 1, 1959
-
Strengthening Of A Cold Worked 17% Cr Ferritic Stainless Steel (Type 430) By Heat TreatmentBy M. Sephton
Slat-band chains, currently manufactured from Type 430 ferritic stainless steel, are used as conveyors in various industries. A process to strengthen these chains?with the aim of prolonging the lifeti
Jan 1, 1997
-
Sistema de gestión operativaBy Marco Muñoz
La mina Porvenir, perteneciente al Grupo Milpo, está ubicada en Cerro de Pasco, destacándose por la corporación de equipos de alta tecnología minera adecuada a sus operaciones. En ese sentido, el pre
Jul 17, 2000
-
The Geological Strength Index (GSI): A Characterization Tool For Assessing Engineering Properties For Rock MassesBy Paul G. Marinos, Vassilis Marinos, Evert Hoek
The Geological Strength Index (GSI) is a system of rock mass characterization that has been developed in engineering rock mechanics to meet the need for reliable input data related to rock mass proper
Jan 5, 2007
-
3D Computer Simulation of Bench Blasting with Precise Delay TimingBy Dale S. Preece
"Detonation delay timing has been an important aspect of quality rock blasting for decades. Detonators that enable delay timing have improved over the years especially with the recent advent of precis
Jan 1, 2009
-
An evaluation of the effectiveness of teamwork, with an emphasis on peer assessment and peer review, in an introductory engineering courseBy C. Daly
"The Faculty of Engineering at the University of New South Wales (UNSW) offers a core first-year engineering design and innovation course,ENGG1000, undertaken during the first and second semesters. Th
Jan 1, 2014
-
Effects of blasting on damage and grindability of impacted rockBy C. Pelley, S. Kelebek, G. Kunzel, S. Gregersen, M. Pollanen
A series of small-scale tests was conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the material properties of the rock as well as its resistance to crushing and
Jan 1, 2006
-
Drill Monitoring and GPS Developments and their Impact on the Drill to Mill ProcessBy John Vynne
Too often, a mine’s operations, including drilling, blasting, loading, hauling, crushing, processing, etc., are considered independent steps, rather then a continuous process. In fact, these are inter
Jan 1, 2000
-
Common-Sense Improvements To Electric Smelting At Impala Platinum (J o u r n a l P a p e r)By V. Coetzee
In 1992, a paper was compiled highlighting a common-sense approach to electric smelting at Impala Platinum. Since then, the smelter complex has undergone considerable changes. Mineral economics, UG2 e
Jan 1, 2006
-
OFR-114-93 Ecosystem Management And Mine Permitting In AlaskaBy Patrick D. Plumb
The Juneau Office of the U.S. Bureau of Mines has undertaken a study of the environmental permitting process for major mines in Alaska to identify the effects ecosystem management has had or could hav
Jan 1, 1993
-
Small footprint, big challenges: Design and construction of the Allen Park storage tunnelBy Brain E. Gombos
The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary
Jan 1, 2013
-
OFR-58-84 Development And Analysis Of Slurry Transport Systems In Longwall Mining Of CoalBy Tuncel M. Yegulalp
This final report contains the results of all work performed under BOM Grant J0333905. A preliminary systems analysis of coarse-particle coal slurry pipelines as a haulage method for longwall mining s
Jan 1, 1982
-
Highwall and Spoils Design and MonitoringBy Tim Peterson
Factors Controlling Stability Stability of slopes in soft rock, waste dumps or soils is governed by three factors: ?Slope configuration ?Groundwater ?Shear strength
Jan 1, 2004
-
Observation Methods Using Real-Time Surface Settlement Monitoring On The South Toulon Tunnel ProjectBy B. Caro Vargas
The Toulon Tunnel project is a key component of the highway corridor on the French Riviera between Marseille and Nice and is a fundamental transportation infrastructure for the region. The first desig
Jan 1, 2012
-
RI 9333 - Evaluation of the Safety of the CSE SR-100 Self-Contained Self-RescuerBy R. W. Watson
A belt-wearable self-contained self-rescuer (SCSR) manufactured by the CSE Corp. and designated the "SR-1OO" was evaluated for safety in the underground mine environment by the U.S. Bureau of Mines. T
Jan 1, 1991
-
Continuous Improvement And Teamwork Are The Keys To Success At Phoenix MineBy Scott Ellenbecker
The formation in Newmont Mining?s Phoenix Mine near Battle Mountain, NV contains high levels of abrasive quartzite as well as gold, copper and silver. Newmont started mining operations at Phoenix (for
Jan 1, 2009
-
IC 7741 Drill-Dust Collectors Approved By The Bureau Of Mines As Of January 31, 1956 ? IntroductionBy C. W. Owings
One phase of Bureau of Mines health and safety work is promotion of the use of safe and effective dust-collecting devices in connection with rock drilling in coal mines. To insure that adequate equipm
Jan 1, 1956
-
IC 8032 Pulverizing Lignite In A North Dakota Powerplant ? Introduction And SummaryBy R. C. Ellman
Since successful industrial lignite-burning equipment was developed in 1925, the commercial use of lignite as a fuel for power plants has increased. It has proved an entirely satisfactory fuel for gen
Jan 1, 1961
-
IC 9217 Practical Considerations In Longwall Face And Gate Road Support Selection And UtilizationBy Thomas M. Barczak
The U.S. Bureau of Mines has been conducting research to optimize the design and utilization of mine roof support systems. An objective of these efforts is to evaluate the mechanical and structural re
Jan 1, 1989