Search Documents

Search Again

Search Again

Sort by

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002

  • SAIMM
    Computational fluid dynamic modelling of two phase flow in a hydrocyclone - Synopsis

    By M. J. Leeuwner

    Computational fluid dynamic (CFD) modelling is used to research the complex flow structures that exist in a hydrocyclone. By simulation of a two phase (water and air) flow system, the internal flow an

    Jan 1, 2008

  • AUSIMM
    Geochemical Mining Impact and Possibilities of its Reduction

    By V P. Elpatyevskaya, V S. Arzhanova

    Main geochemical problems concerning the environment and mining industry interrelation are connected with the transformation of natural water chemistry by mining wastes. The investigation of many mine

    Jan 1, 1995

  • SME
    Evaluation Of Design And Performance - Porter Square Transit Station Chamber Lining

    By David E. Thompson, Andrew F. McKown, Herbert H. Einstein, Amr S. Azzouz

    INTRODUCTION Design of supports for underground chambers in rock has undergone considerable development. This becomes evident when comparing support dimensions of subway station caverns built in th

    Jan 1, 1983

  • SME
    Manhattan Mine: Linking Reclamation and Sustainable Development

    By Mark Ioli, Debra Struhsacker

    In September 2004, Gale Norton, U.S. Secretary of the Interior, presented the Manhattan Mine with a U.S. Bureau of Land Management’s 2004 Hardrock Mineral Environmental Award. The Manhattan Mine is a

    Jan 1, 2005

  • AUSIMM
    WhatÆs Driving Natural Revegetation Patterns on Overburden at Wangaloa Coal Mine?

    By D Craw, S Clearwater, S Hammit, C Smith

    Prior to rehabilitation, plant cover on quartz gravel overburden at Wangaloa coal mine was highly patchy. Stabilisation techniques have since considerably altered the condition of the main overburden

    Jan 1, 2004

  • AUSIMM
    Problems With Acid Rock Drainage Predictions at the Ekati Diamond Mine, Northwest Territories, Canada

    The Ekati Diamond Mine is located on permafrost terrain in CanadaÆs Northwest Territories. The mine rock consists of: diamond-bearing and barren kimberlite; and surrounding waste rock such as granit

    Jan 1, 2003

  • SME
    Cincinnati Features Aggregates and Industrial Minerals Programming

    The 2003 SME Annual Meeting and Exhibit will take place Feb. 24-26 in Cincinnati, OH. The meeting will feature a host of special symposia and programming geared toward the industrial minerals and agg

    Jan 1, 2003

  • SME
    Unitized, Portable Flotation-Leach Plants For Treating Partially Oxidized Gold And Silver Ores

    By Paul H. Johnson

    Resource Engineering and Development, Inc. is desigining and building a portable 150 to 225 tpd, flotation-cyanide leach plant with unitized, skid-mounted components. This plant design, with its porta

    Jan 1, 1981

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014

  • SAIMM
    Evaluation Of The Behaviour Of High-Density Tailings Deposition - CODELCO Pilot Plant - Synopsis

    By J. Engels

    CODELCO is considering the implementation of high-density tailings management at the Chuquicamata mine in northern Chile for its long term disposal plan. To achieve this, CODELCO commissioned the desi

    Jan 1, 2012

  • AIME
    Institute of Metals Division - The Ta-W-Re System

    By J. H. Brophy, M. H. Kamdar, J. Wulff

    A constitutional diagram for the Ta-W-Re alloy system is presented. Rhenium dissolves in the complete range of solid solutions between tungsten and tantalum up to 48 wt pct in tantalum 'to about

    Jan 1, 1962

  • SAIMM
    Backfilling Waste Material Composites Environmental Impact Assessment (95dd6eef-7bf4-4fa8-be57-02effe87a6a7)

    By J. Kortnik

    Mining has always been, and still is, an activity which is vital for the development of mankind. This is because a predominant proportion of industrial products and energy is produced from raw materia

    Jan 1, 2003

  • AUSIMM
    Performance of Electrodes Containing Brown Coal Char in Alumina Reduction (76ee41ec-7c9b-4d9b-9404-4c3cd7756bf3)

    A predicted increase in aluminium production and the possibility of a diminishing supply of petroleum coke for anode electrodes in alumina reduction cells makes it desirable to find alternative electr

    Jan 1, 1971

  • AIME
    Geophysics - Resistivity Method in Groundwater Exploration, City of Gunnison, Colo

    By C. E. Melbye

    A serious problem confronted the city of Gunnison early in 1958 in that, for a few months during each spring runoff, the water supply derived from the Gunnison River became polluted to an unsafe point

    Jan 1, 1961

  • AUSIMM
    Structural Permeability and Fluid Flow in Fault-Fracture Meshes

    Low displacement fault zones often comprise a mesh of interlinked faults, extensional-shear and purely extensional vein fractures. Hydrothermal mineralisation localised around such structures testifie

    Jan 1, 1995

  • NIOSH
    Water Resistant Enclosure For Extensometer - Objective

    Provide long-term measurement of mine sidewall closure in backfilled stapes subject to flooding. Approach A water resistant extensometer is made by enclosing a rod-actuated transducer in a tel

    Jan 1, 1978

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zealand

    By P E. H Gregg, D Horne, R B. Stewart, N Bolan

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on sit

    Jan 1, 1995

  • CIM
    Classification System Upgrades in HVC Primary Mill Grinding Circuits – Hybrid Cavex Cyclone Testing and Installation

    By Rob Sloan, Simon Yu, Rob Robison, Mark Schmidt

    "In 2000-2009, Highland Valley Copper (HVC) tested new generation 660 mm cyclones supplied by various manufacturers in an aim to replace existing first generation 762 mm cyclones without success. Due

    Jan 1, 2013

  • CIM
    On-Site Daily Mineralogy - SIDMIN Program

    By Fuzail Siddiqui

    "The SIDMIN program aims at filling the mineral processor’s need to know the deportment of ‘minerals of interest’ not just ‘elements of interest’ that pass through the processing plants. Generally, ch

    Jan 1, 2000