Search Documents

Search Again

Search Again

Sort by

  • SAIMM
    An Integrated Limestone/Lime Process For Partial Sulphate Removal

    By A. J. Geldenhuys

    This paper will focus on two topics, namely (1) an innovative process for the neutralization and partial sulphate removal of acid streams produced during coal mining and processing and (2)optimization

    Jan 1, 2003

  • CIM
    Electric Furnace Off-Gas Cleaning Systems at PT Inco

    By Paykan Safe

    ?? Background ?? WorleyParsons Gas Cleaning ?? PT Inco Smelter ?? Process Design Considerations ?? Furnace Control and Combustion ?? Combustion Chamber ?? Spray Chamber ?? Draft Control ?? Bag

    May 1, 2008

  • AUSIMM
    Safety at the Broken Hill Proprietary Steelworks

    By McLennan R. G

    The principle of personal safety is as old as the human race. The application of this principle to industry is of much more recent origin, and may be said to be almost exclusively the product of the t

    Jan 1, 1957

  • AUSIMM
    Effectively linking mining geology with waste management – a case study from western Tasmania

    By A Parbhakar-Fox, B G. Lottermoser

    Management of solid mine wastes, particularly waste rock, requires careful planning to reduce the likelihood of sulfide oxidation, and generation of acid rock drainage (ARD). Waste management strategi

    Sep 20, 2017

  • SAIMM
    Development of weightometer soft sensor

    By K. Coleman, C. Visser, N. Selby, X. W. Pan, T. Letwaba

    A prototype weightometer soft sensor is under development at DebTech, De Beers in partnership with Venetia Mine. Its main function consists of an online data source; data validation; dynamic weightome

    Jan 1, 2003

  • AIME
    Extractive Metallurgy Division - A Thermodynamic Analysis of the Ta-C-O, Cb-C-O, and V-C-O Systems

    By John Chipman, Wayne L. Worrell

    Using recent thermodynamic data for the carbides and oxides of tantalum, columbium, and vanadium, the stable solid phases aboue 1300°K and at 1 atm CO(g) pressure in each M-C-O system have been determ

    Jan 1, 1964

  • SAIMM
    Simplification Of The Thabazimbi Dense Media Separation Plant Flow Line To Increase Capacity - Background

    By E de Villiers

    Several methods exist by which the capacity of a dense media separation (DMS) plant can be improved: 1) Increase the feed rate in spite of efficiency 2) Replace with bigger equipment 3) Add wh

    Jan 1, 2006

  • TMS
    Preparation of Iron Oxide Red Pigment Powders from Pyrite Cinders by Hydrothermal Method

    By Zhao-cheng Liu

    Iron oxide red pigment powders of high quality were synthesized from pyrite cinders. Iron ox-ide red pigment powders were synthesized by hydrothermal method from the precursor of Fe(OH)3 and Fe(OH)2 c

    Jan 1, 2009

  • IIMP
    Extracción de Arsénico, Antimonio y Obtención de Plata de Concentrados Complejos de Cobre (Tetraedrita - Tennantita)

    By Roberto Vargas

    "El presente Trabajo de Investigación, tiene por objeto describir la tecnología, la operación del Proceso en la Planta que implementa dicha tecnología así como los resultados obtenidos en dicho Proces

    Sep 1, 2017

  • SME
    Ground Improvements for CSO Connections to a Large Tunnel, Cleveland, Ohio

    By Narendra N. Khatri, Michael Deutscher, Jozef F. Zurawski

    Five sewer connections were required to divert Combined Sewer Overflow (CSO)from existing outfalls to an old underutilized large diameter brick sewer (the Easterly Interceptor). The connections were p

    Jan 1, 2005

  • AIME
    Coal - Coal Strip Mining-Is It Reaching a Peak?

    By Hubert E. Risser

    Although, for about a half-century the percentage of coal production provided through strip mining has steadily increased, recent trends indicate that a peak in percentage (not tonnage) is being appro

    Jan 1, 1970

  • SAIMM
    Geotechnical Considerations In The Design Of The MOCB Mining Method At Konkola No.3 Shaft.

    By M Lipalile, A B. Tunono, A W. Naismith

    Konkola No 3 shaft experienced severe mining induced stress and time related deterioration in ground conditions in an area where an over-cut and bench (OCB) mining method was used to extract a shallow

    Jan 1, 2005

  • AUSIMM
    The Oxidation of Aqueous Ferrous Sulphate Solutions by Molecular Oxygen

    The oxidation of ferrous sulphate to ferric sulphate with air and oxygen in a gas lift percolator was investigated with initial Fe2+ concentrations in the range 0·01 M to 1·0 M,temperatures

    Jan 1, 1972

  • SME
    Geologic study of gravels of the Agua Fria River, Phoenix, AZ

    By William H. Langer

    The annual consumption of sand and gravel aggregate in 2006 in the Phoenix, AZ metropolitan area was about 76 Mt (84 million st) (USGS, 2009), or about 18 t (20 st) per capita. Quaternary alluvial dep

    Jan 2, 2010

  • AUSIMM
    Structural Controls on Gold Deposition in the Hyde-Macraes Shear Zone at Round Hill, Otago, New Zealand

    The Hyde-Macraes Shear Zone (HMSZ) is low angle, duplex thrust system that has developed in a graphitic pelite schist within the Otago schist belt,

    Jan 1, 1993

  • SAIMM
    Keynote Address: 6th International Symposium For Rock Fragmentation By Blasting

    By D. Diering

    Having agreed to perform this task, I naturally started to wonder what on earth I was going to talk about, and on reviewing the literature I was surprised at how little I knew and how much I?d forgott

    Jan 1, 2000

  • AUSIMM
    Establishing Metal Levels in the Ohinemuri River

    By W Donovan

    Concern exists about the potential release of metals from the proposed mining operation at Martha Hill to the Ohinemuri River. Speculation on possible impacts is fuelled by the dearth of published dat

    Jan 1, 1986

  • SAIMM
    Masjed-e-Soleiman HEPP, Iran Rock Engineering Investigations, Analysis, Design and Construction

    By F. B. Samani, B. Stabel

    The 1,000 MW Hydro Power Station Masjed-e-Soleiman (formerly called Godar-e-Landar) in Iran is under construction since 1992. The rock engineering aspects of the major underground structure, i.e. the

    Jan 1, 2003

  • CIM
    Constrained Multivariable Control of a Pilot Flotation Column at the Laronde Concentrator

    By D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme

    "A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc

    Jan 1, 2012

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003