    Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected Piles

    By A. Eslami

    In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;

    Jan 1, 2008

  • AIME
    Some Mechanical And Metallurgical Aspects Of Present-Day Oil-Production Equipment (ffb6f081-3077-40cf-98dc-f9654a00b342)

    By Albert Zima

    ACCORDING to recently published statistics, it is predicted that as much oil must be produced during the next 16 years as has been produced during the past 75, in order to satisfy the high rate of con

    Jan 1, 1935

  • AUSIMM
    Geology and Alteration Mineralogy of the Karangahake Adularia-Sericite Epithermal Deposit, Hauraki Goldfield, New Zealand

    By M Stevens, M P. Simpson, J L. Mauk

    The Karangahake deposit was the second largest producer of gold-silver bullion in the Hauraki Goldfield, New Zealand. New mapping of a 2 + 3 km (6 km2) area demonstrates that hydrothermal alteration s

    Jan 1, 2005

  • IIMP
    Proceso de producción metales preciosos en refinería de Ilo

    By Valentín Pamo

    El presente trabajo describe los procesos y equipos que permiten la extracción de metales preciosos de la refinería de Ilo en condiciones agresivas, obligando a investigar materiales resistentes a la

    Sep 9, 2007

  • AUSIMM
    Underground Mining at the Golden Cross Mine

    The modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye

    Jan 1, 1994

  • AUSIMM
    Microbes and their Metabolites - Potential Iron Ore Flotation Reagents

    By R Dwyer, S Rea, W J. Bruckard, N McSweeney, R Holmes

    "The innate ability of microorganisms to adapt to changing or inhospitable environments has often been exploited for industrial purposes and forms the basis of many current biotechnological processes.

    Aug 12, 2013

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • SME-ICGCM
    The Next Generation of Cable Bolts for Improved Ground Support

    By Stephen C. Tadolini

    PC-Strand tendons, commonly referred to as cable bolts, have become a major rock reinforcement device for underground mining and civil applications. The most common configuration is a 1+6 strand, whic

    Jan 1, 2012

  • TMS
    Preparation Of Fibrous Ni-Co Alloy Precursor Articles By Modified Coprecipitation Method

    By Zhang Chuanfu

    Keywords: modified coprecipitation method, Ni-Co alloy powders, solid-solution oxalate, growth mechanism Homogeneous solid-solution oxalates of Ni2+ and Co2+ ions were synthesized by modified copre

    Jan 1, 2005

  • AIME
    Producing – Equipment, Methods and Materials - The Skin Effect in Producing Wells

    By E. B. Brauer, W. Hurst, J. D. Clark

    Because of drilling, completion, and workover practices, the permeability around a wellbore generally is different from the permeability of the formation. The zone with the altered permeability is cal

    Jan 1, 1970

  • AUSIMM
    Presidential Address, 1957-The Place of the Iron and Steel Industry in the Australian Economy

    Six years ago it was my responsibility to give the presidential address, and now that privilege has come my way again. On that occasion we were gathered atWhyalla and I took the opportunity of putting

    Jan 1, 1957

  • AUSIMM
    Removal of Dilute Toxic Anions in Wastewater Using Aluminum Hydroxides Co-Precipitation Method

    Removal of Dilute Toxic Anions in Wastewater Using Aluminum Hydroxides Co-Precipitation Method

    Sep 13, 2010

  • CIM
    Unlocking Value through Flotation Equipment Maintenance

    By P. Tolvanen, A. Jalili

    "When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a

    Jan 1, 2015

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959

  • CIM
    Heterogeneity of Low-Grade Ores and Amenability to Sensor-Based Sorting

    By A. Mazhary

    "Although ore sorting in mining is not a new concept, sensor-based sorting has failed to gain broad acceptance due to perceived challenges with the technology. In order to gain wider applications, thi

    Jan 1, 2015

  • AUSIMM
    A novel sink-hole fluidisation method for dry separation of iron ore fines

    By S M. Iveson, K P. Galvin, D Kumar

    Dry separation of iron ore fines and other heavy minerals has previously been achieved using one of two main approaches. The first is an inclined table with an upward airflow via small holes to help f

    Jul 24, 2017

  • SME
    Rapporteur?s Report Session III: Exposure To Grunerite (Amosite) Asbestos: Historical Perspectives Of The Health Effects

    The development of information concerning mesothelioma in South Africa started with the 1959 finding of Dr. J. Christopher Wagner of cases of mesothelioma in persons living in the vicinity or working

    Jan 1, 2008

  • DFI
    Toward Understanding the Seismic Performance of Rigid Inclusions

    By J. Tanner Blackburn, James R. Gingery, Lisheng Shao

    Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.

    Jan 1, 2018

  • SAIMM
    The Rehabilitation Of Impala No. 1 A Ventilation Shaft - Introduction

    By A. Bothma

    The Impala No. 1A ventilation shaft is located approximately 15 kms north of Rustenburg and is accessed via the R510road from Rustenburg to Northam/Thabazimbi. This situation is shown on the location

    Jan 1, 2001

  • SME
    Horizontal Geotechnical Investigations for Tunneling

    By Nick Salisbury, Alan Howard, Scott Tunison

    INTRODUCTION Geotechnical investigations for tunneling projects typically use vertical test borings and, to a lesser extent, angled borings. Horizontal drilling applications were often limited to