Search Documents

Search Again

Search Again

Sort by

  • NIOSH
    RI 3431 House Movement Caused By Ground Vibrations ? Introduction

    By J. R. Thoenen

    For several years the Bureau of mines has been investigating the characteristics of ground vibrations produced by quarry blasts. Considerable basic information has been obtained in the course of this

    Jan 1, 1938

  • NIOSH
    RI 3431 House Movement Caused By Ground Vibrations ? Introduction (f084d160-37aa-4764-86e3-1d24b7a3ece2)

    By J. R. Thoenen

    For several years the Bureau of mines has been investigating the characteristics of ground vibrations produced by quarry blasts. Considerable basic information has been obtained in the course of this

    Jan 1, 1938

  • NIOSH
    MLA 32-83 - Mineral Investigation Of The Butt Mountain (No. 5100), Ishi (No. B5098), Mill Creek (No. 5284), And Polk Springs (No. 5097) Rare II Areas, Tehama And Plumas Counties, California ? Summary

    By Eric E. Cather

    Approximately 270,000 cu yd (20[0],000 cu m) of inferred subeconomic auriferous gravel resources were estimated in three Tertiary deposits in the Polk Springs study area (fig. 1 and table 1). These re

    Jan 1, 1983

  • ISEE
    Blast Site Security - International Society of Explosive Engineers 29th Annual Conference Safety Workshop February 5, 2003 Nashville, Tennessee

    By Unknown

    Blast Site Security Involves: * Clearing the area * Controlling Access * Warning Signals

    Jan 1, 2003

  • NIOSH
    RI 3209 The Cleaning Of Fine Coal From The Mary Lee Bed At The Porter Mine ? Introduction

    By A. C. Richardson

    The mine of the Porter Coal Co. is located at the town of Porter in the northwestern part of Jefferson, County, Ala., about 20 miles west of Birmingham. The operations in this mine are confined to the

    Jan 1, 1933

  • NIOSH
    RI 8057 Thermomechanical Method for Secondary Breakage of Hard Rocks

    By K. Thirumalai

    The feasibility of breaking hard rock by thermal weakening and subsequent mechanical impacting was tested, Field tests at a basalt quarry in Dresser, Wis., demonstrated that large hard-rock blocks (5

    Jan 1, 1975

  • AIME
    Geology - Tectonic History of the Basin and Range Province in Utah and Nevada (Mining Engineering, Mar 1960, pg 251)

    By J. C. Osmond

    One of the least known geologic regions in the U.S. is the area now called the Basin and Range Province. It is paradoxical that so little geologic information has been compiled for a province that has

    Jan 1, 1961

  • CIM
    Geochemical and geophysical gold exploration in the Timmins area, Ontario: a case history

    By A. Philipp, A. S. Middleton, G. A. Harron, A. B. Durham

    "Basal till sampling techniques were used to search for gold mineralization in the Timmins, Ontario area. During 1978 and 1979, approximately 90 overburden sampling drill holes were completed in Murph

    Jan 1, 1987

  • CIM
    Stratigraphy and structural analysis of the North Gold Zone at Montauban-les-mines, Quebec

    By Jean-Marc Simard, Vincent Jourdain, Denis W. Roy

    "Seven lithologic units, informally characterized, were recognized in the vicinity of the Montauban orebody. The first five lie in stratigraphic order. From structural bottom to structural top these a

    Jan 1, 1987

  • NIOSH
    IC 8938 New Developments In Personal Lighting Systems For Miners

    By William H. Lewis

    Energy Research Corp., under contract to the Bureau of Mines, has developed a new miners' caplamp battery. The new battery is based on nickel-cadmium technology and offers significant improvement

    Jan 1, 1983

  • SME
    Stability Prediction And Performance Of Highwall Steepening In Weak Rock

    By D. R. Brox, J. Levell

    The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit

    Jan 1, 2001

  • AUSIMM
    Mining Methods and Costs at the Mount Isa Mines Ltd., Mount Isa, Queensland, Australia

    By Mann V. I

    The Mount Isa property has been in operation since June, 1931; during this period operations have changed from the production and treatment of carbonate ores to the mining, milling, and smelting of su

    Jan 1, 1938

  • SME
    GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?

    By Antonio De Biase

    In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t

  • SAIMM
    Process design of the Phola coal preparation plant - Synopsis

    By G. M. Cresswell

    The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing

    Jan 1, 2010

  • NIOSH
    Program Of Research - A Summary Of Research In Progress During Fiscal Years 98 - Introduction

    By Gregory R. Wagner

    The Program of Mine Safety and Health Research described in this document reflects the continuing commitment of the Spokane and Pittsburgh Research Laboratories to focus on the most important areas wh

  • IOM3
    High-temperature mine climate simulation model for predicting the effect of mine fire

    By P. Mousset-Jones, G. Danko

    Variations of the temperature and steam/moisture content of the air with distance and time are modelled for a single airway. The input for the simulation is an air temperature that varies with time, t

    May 1, 1991

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • SME-ICGCM
    Analysis Of Multiple-Seam Interaction In A Bump-Prone Western Coal Mine Using MULSIM/PC

    By D. A. Donato

    It is often necessary for a mining company to extract coal from a seam underlying a previously mined coal seam. The impact of the overlying mine workings on the stress distribution within the underlyi

    Jan 1, 1996

  • AUSIMM
    Micro Examination of Some Samples From the Lead Refining Process

    By Wesley, Worner H

    During the meeting of the Institute last year at Port Pirie, the opportunity was taken to sample the lead bullion coming from the blast furnace and various stages during the refining process. Also, in

    Jan 1, 1938

  • SAIMM
    Determining Settlement Rates and Surface Stability Using In Situ Density of Backfill as a Proxy for Displacement

    By D. Fenn, A. du Kanda, D. Dukhan

    "SynopsisGibb Consulting Services was contracted by Eskom Line Engineering Services to conduct an investigation to determine the absolute displacement to date and infer the current rate of displacemen

    Jan 1, 2015