Search Documents

  • SME
    Lead Time In Copper Mine Development ? Introduction

    By Lorraine B. Burgin

    The extensive lead time to develop most Arizona copper deposits commenced with initial production efforts before the turn of the century, when the first attempts were made to recover gold and silver a

    Jan 1, 1974

  • AUSIMM
    Remarks on the Brown Coal Beds and Associated Deposits of the Werribee Plains, Victoria

    The district specially referred to in this paper comprises the very gently sloping country extending from the western shores of Port Phillip from the mouth of the Yarra to Footscray along the Bacchus

    Jan 1, 1902

  • SME
    Case Histories of Rehabilitation of French Railway Tunnels

    By Verya Nasri

    This paper presents analysis of damages and rehabilitation design for three major French rail-way tunnels built in mid-19th century. The La Nerthe tunnel underwent ovalization deformation with excessi

    Jan 1, 2008

  • SME
    Industrial Minerals 2002

    Editor’s note: As usual, the June issue features an industrial minerals review. And some thanks are in order. Thank you to the industrial minerals annual-review editor, to the technical committees

    Jan 1, 2003

  • CIM
    Energy Consumption Patterns In 20th Century Canadian Cuni Smelters Torstein Utigard Symposium on Pyrometallurgy 54th Annual Conference of Metallurgists held in Conjunction with AMCAA-America’s Conference Onal

    By S. W. Marcuson, P. J. Mackey

    The 1973 Oil Embargo and succeeding disruptions in supply had a profound effect on energy costs and consumption patterns in the developed world. This was especially true in the USA where post World Wa

    Jan 1, 2015

  • SME
    A Comparative Study Of Several Explicit Finite Difference Schemes For The Solution Of Mass Transfer Problems In Mine Ventilation

    By Rajendra K. Devala, Sukumar Bandopadhyay

    In order to be able to design an adequate mine ventilation system it is necessary to understand how pollutant masses disperse into turbulent ventilation air streams. The mixing of gases and dusts with

    Jan 1, 1993

  • IOM3
    Basic aspects of nickel extraction from chromitiferous overburden

    By B. R. Reddy, Y. V. Swamy, B. V. R. Murthy, H. S. Ray

    The Ni oxide was reduced with a CO-CO2-N2 gas mixture and the effects were observed of process variables such as roasting temperature, time and CO partial pressure. Extraction of over 90% of Ni was ac

    Dec 1, 1995

  • AUSIMM
    A History of Mount Morgan

    To form a true picture of the early history of Queensland, we must think of white settlement advancing like an incoming tide, wave by wave; each wave lapping ahead a little further than the last. The

    Jan 1, 1939

  • AIME
    Extractive Metallurgy Division - Reverse Leaching of Zinc Calcine

    By H. J. Tschirner, L. P. Davidson, R. K. Carpenter

    HE electrolytic zinc plant of the American Zinc Co. of Illinois, at Monsanto, was expanded in 1943 to a capacity of 100 tons of slab zinc daily. This capacity was not attained because of inability of

    Jan 1, 1952

  • AIME
    Papers - Composition Limits of the Alpha-gamma Loop in the Iron-tungsten System (With Discussion)

    By W. P. Sykes

    In an earlier paper1 the composition-temperature limits of the gamma iron phase in the iron-tungsten system were reported as approximated by thermal analyses. At that time no attempt was made to de

    Jan 1, 1931

  • TMS
    Direct Smelting of Zinc Concentrate and Residues

    By Rui-Qing Li, John G. Peacey, Peter J. Hancock

    "Noranda has been investigating a pyrometallurgical process for the direct recovery of zinc from zinc concentrate and zinc and iron containing residues. The process consists of injecting dry zinc conc

    Jan 1, 1996

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009

  • SME
    An AFM Study of the Adsorption of Collector on Bornite

    By W. Zhang

    "The adsorption of collector on bornite has been studied in situ in aqueous solutions by applying an atomic force microscopy (AFM). The AFM images show that xanthate, such as potassium ethyl xanthate

    Jan 1, 2016

  • AUSIMM
    Challenges and Opportunities for Constructed Stream Diversions in the Bowen Basin, Central Queensland

    By K White, R Hardie, J Merritt, B Kirsch, R Lucas

    Constructed stream diversions are a common element of mine sites across Australia. A review of constructed stream diversion performance in the Bowen Basin funded by the Australian Coal Association Res

    Nov 26, 2013

  • AUSIMM
    Setting and Origin of Miocene Giant Ore Deposits in the Central Andes

    By C Mpodozis

    Central Andean (22¦S to 34¦S latitude) Miocene giant ore deposits share common features that reveal their origin. Tectonic and magmatic features include a relation to a shallow subduction zone, an ass

    Jan 1, 1999

  • AUSIMM
    The Thames-Hauraki Pumping Plant at Thames, New Zealand

    THIS paper proposes to give a general description of the pumping and other machinery in use at the Thames Hauraki Pumping Station, situated on the Thames goldfields of the North Island, New Zealand. A

    Jan 1, 1912

  • NIOSH
    OFR-47(8)-83 Ecological Studies On The Revegetation Process Of Surface Coal Mined Areas In North Dakota - 8. Soil Algae

    By Thomas L. Starks

    Surface soil/spoil Samples (0-10 cm) from experimental test sites in western North Dakota were aseptically collected during August 1975 and each month (May through September) during 1076 and 1977. Sel

    Jan 1, 1982

  • CIM
    Using Gas Monitoring and Personnel/Vehicle Tracking to Maximize the Benefits of Ventilation-On-Demand in Underground Mining Operations

    By Tanveer Jahir

    With increasing energy costs and mounting government pressure to adopt low emission, green sources of energy, it has become imperative to develop long-term sustainable underground infrastructures that

    May 1, 2011

  • AUSIMM
    The Development and Integration of a Carbon-In-Pulp Gold Circuit within the Kambalda Nickel Concentrator

    The reasons for and the methods of inte- gration of the gold treatment plant with the existing nickel concentrator are discussed. The integration was accomplished in three stages commencing in May 1

    Jan 1, 1984

  • TMS
    Lattice Parameter Determinations Of KNO3-NH4NO3 Solid Solutions By X-Ray Diffraction Method

    By Wen-Ming Chien

    Keywords: AN-KN Phase Transition, Lattice Parameters of AN-KN, X-ray Diffraction The lattice parameters of the low and high temperature phase of KNO3-rich (in NH4NO3) solid solutions have been dete

    Jan 1, 2005