  • SME
    Preventing Injuries Caused By Unrecognized Stone Mine Roof Beam Failures With A Pro-Active Roof Control Plan (0c7b539f-811b-45a7-99b1-58337aa78aec)

    By A. T. Iannacchione

    Unrecognized roof beam failures resulted in 69% of the falls of ground injuries occurring in underground U.S. stone mines from 1990 to 1996. Field investigations at 45 underground stone mines suggest

    Jan 1, 1999

  • TMS
    Hydrometallurgy of Chlorides: A Review of Recent Developments

    By Dirk Verhulst, V. I. Lakshmanan

    Why Chloride Hydrometallurgy?The most available, cheapest and best known reagent for treating ores and other raw materials for the metallurgical industry is sulfuric acid. Hydrochloric acid is second

    Jan 1, 2011

  • CIM
    Large Single Line Grinding Circuits at the Highest Availability

    By C. Horstmann, D. Andreo, G. Barthold

    "The concept of large single line grinding circuits provides a valid answer in project feasibility studies by reducing capital investment requirements compared to parallel lines for the same plant thr

    Jan 1, 2016

  • IMPC
    Electrical Conductivity of Melter Type Slags

    By Rodney J. Hundermark, Sharif Jahanshahi, Shouyi Sun

    "The major platinum producers in South Africa make use of electric furnaces for the melting of PGM bearing nickel - copper concentrates. To gain better understanding of the furnace operation, research

    Jan 1, 2003

  • SME
    Applying Environmental Geology Concepts To Urban Development Planning An Example: Tippecanoe County, Indiana

    By T. R. West

    Planning for urban development in many locations is based largely on 0.10 factors, 1) soil conditions and 2) socio-political aspects of the region. A more widely based approach is necessary, however,

    Jan 1, 1972

  • SME
    Accelerating Plant Commissioning: Unlocking Early Profits Through Strategic Planning - SME Annual Meeting 2025

    By Daniel Roy, Danielle Bouffard, Antoine Berton, Simon Gariépy

    Commissioning a mineral processing plant has always been a challenging task. The process includes pre- operational verification, dry and wet commissioning, and a gradual ramp-up to full production, al

    Feb 1, 2025

  • AUSIMM
    Getting the Most out of Technology to Drive Mine Productivity Improvements

    By K Sommerville, J Parkinson

    "Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c

    Nov 15, 2016

  • SME
    Risk Modelling Techniques for Complex Tunnelling Projects from Deterministic to Probabilistic Methods: Have We Done Enough? - NAT2022

    By P. Sander, M. Spiegl, J. Reilly, A. Van Droogenbroeck

    Although the outdated idea of calculating risk as the deterministic product of its likelihood and impact is not entirely a thing of the past, a multitude of organizations have adopted the usage of pro

    Dec 1, 2022

  • CIM
    Distribution of the Saskatchewan Potash Beds

    By H. A. Gorrell, S. R. L. Harding

    "The potash beds in the Saskatchewan portion of the Williston Basin occur in the upper portion of the Prairie Evaporite formation of the Devonian Elk Point Group. They represent the late stage of a ma

    Jan 1, 1967

  • SME
    Direct Geostatistical Estimation Of Irregular 3D Volumes

    Those who have had an occasion to apply geostatistics to the estimation of ore reserves are familiar with the conventional approaches of estimating average grade of quality values for arrays of regula

    Jan 1, 1991

  • SME
    Kickstarting Culture Change - SME Annual Meeting 2024

    By Andrew McGrath, Geraldine Lyons, Sarah Barcelona

    In the dynamic and challenging modern industry landscape, understanding and unleashing the true role and contribution of technical teams is crucial to business success. The cyclical nature of industri

    Feb 1, 2024

  • SME
    A Discussion on CSM and NTNU Penetration Rate Models

    By E. Farrokh

    CSM and NTNU models are among the most commonly used models in TBM performance evaluation. Due to increasing application of TBM in different tunneling conditions, modification became necessary for the

    Feb 23, 2014

  • NIOSH
    OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

    By K. B. Bengtson

    This task report provides the process technology, preliminary design, capital and operating costs for a 25 TPD pilot plant to produce cell-grade alumina using a clay/hydrochloric acid extraction - HCI

    Jan 1, 1979

  • SAIMM
    South Africa’s Options for Mine-Impacted Water re-use: A Review

    By T. Grewar

    "South Africa is a water-scarce country, rated as one of the 30 driest countries in the world. Worryingly, government expects water demand to outstrip supply as early as 2025. The South African govern

    Mar 1, 2019

  • DFI
    Safety And Economics Of Working Platforms – A Uk Perspective

    By David Corke

    The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra

    May 1, 2022

  • CIM
    A Visit to the Gem Districts of Ceylon and Burma

    By Frank D. Adams

    The Island of Ceylon, which is one of the most beautiful possessions of the British Empire, has been an abode of man from the very earliest times. The Veddhas, a wild tribe of some 4500 people still l

    Jan 1, 1926

  • AIME
    Reservoir Engineering- Laboratory Research - Prediction of Tracer Performance in a Five-Spot Pattern

    By D. E. Baldwin

    A method has been devetoped for predicting the produced concentration profile for a miscible slug in a five-spot pattern. The technique consists of dividing the five-spot into radial etements and appl

    Jan 1, 1967

  • IOM3
    Broken Hill area, Australia, as a Proterozoic fold-and-thrust belt: implications for the Broken Hill base-metal deposit: contributed remarks; authors' reply

    By A. L. W. Lips, B. P. J. Stevens, T. J. R. Barclay, E. Rothery, S. H. White

    Discussion by B.P.J. Stevens of the paper, published in Trans. IMMA, vol.104, 1995, p.B1-B17, is presented together with the authors' response. Stevens questions the authors' radically different inter

    Apr 1, 1996

  • DFI
    Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) Wall

    By Pancho J. Garza, Keith H. Dahlen, Chris A. Labye

    "Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta

    Jan 1, 2015

  • CIM
    Constraint Model: A Continuous Improvement Tool to Debottleneck Vertically Integrated Mining and Metallurgical Operations

    By A. Khan

    The purpose of this paper is to demonstrate the value of identifying and optimizing throughput constraints by utilizing a Constraint Model. This will be achieved by first understanding the overall con

    Aug 1, 2013