  • CIM
    Water treatment

    By P. M. Shibley

    "IntroductionMine drainage, surface. drainage and process liquors are the principal mine and mill effluents. The quantity and quality of these flows varies according to mineralogy, type and scale of m

    Jan 1, 1989

  • NIOSH
    Concentration Experiments With The Siliceous Red Hematite Of The Birmingham District, Ala. ? Introduction.

    By Joseph T. Singewald

    The possible value of the red hematite iron ore of the southern Appalachian States, if some practicable method of concentrating it could be devised, has long been recognized. The ore is very low grade

    Jan 1, 1917

  • IMPC
    An Investigation into Hydrocyclone-Thickener Dewatering Circuit: A Pilot Scale Study

    By M. Unesi, S. Haj Mohammadi, M. R. Abdoli, M. R. Garmsiri

    "Hydrocyclone-thickener circuit is a promising solution to enhance the dewatering efficiency in mineral industries. The challenges in the circuit is reducing particle size in the thickener feed and th

    Jan 1, 2018

  • SME
    Open Circuit In Flotation

    By Unto Paakkinen

    The testing of different kinds of process flow configurations and cell volumes in industrial scale flotation processes is in general difficult to accomplish and even expensive to perform.1 Also the la

    Jan 1, 1977

  • TMS
    The Application of Light-Optical and Electron-Optical Techniques to the Processing of Complex Pyritic Ores from Meggen, West Germany

    By H. J. Roorda

    With an increasing need to obtain metals by processing complex fine intergrown ores, the use of electron-optical techniques will become more important as a tool for mineralogical studies. Electron ima

    Jan 1, 1987

  • SME
    Magnetic conditioning of sulfide minerals to improve recovery of fines in flotation – a plant practice - Mining, Metallurgy & Exploration (2018)

    By H. R. Manouchehri

    In flotation practices, as particles become finer, such as smaller than 20 μm, process efficiency declines markedly. Selective agglomeration of fine particles is a technique to enhance the recovery of

  • NIOSH
    OFR-97-78 Design, Fabrication And Field Testing Of Remotely Operated Longwall Head/Tail Supports

    By Alfred Bellows

    The objective of this contract is to design, build and demonstrate a support system to improve roof control in the entries of longwall mines. The objective of this phase has been the detailed design o

    Jan 1, 1978

  • NIOSH
    RI 6719 Pilot Plant Flotation Of Non-Magnetic Taconite And Semitaconite

    By R. T. Sorensen

    Research and testing in a small scale equivalent of a commercial flota-tion plant was completed on four low-grade, iron-bearing materials from the western Mesabi range. Closed circuit-flotation of cal

    Jan 1, 1966

  • AUSIMM
    Case Studies Using Slurries and Stable Slurries with Unconventional Binders as Backfill Materials in Deep Hard Rock Tabular Mines

    By R M. Smart, A T. Harrison

    Backfill systems using unconventional cementitious binders have been successfully used in relatively deep and hard rock tabular mines for longwall, scattered stoping and shaft pillar removals. Two unc

    Jan 1, 1998

  • NIOSH
    RI 5312 Beneficiation Of Iron-Copper Ores From Kasaan Peninsula, Prince Of Wales Island, Alaska ? Summary

    By R. R. Wells

    This report summarizes the results of laboratory testing of copper-bearing magnetite ore from the Poorman, Bush & Brown, and Copper Center deposits, Kasaan Peninsula, Prince of Wales Island, southeast

    Jan 1, 1957

  • AUSIMM
    The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint

    By J-P Franzidis, M Esvelt, E V. Manla

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart

    Jan 1, 2003

  • AUSIMM
    Modelling of an Integrated Waste Storage Facility

    By P Edmondson, S Narendranathan, S Setchell

    The complexities of mining in current economic conditions, where ore extraction schedules are varied on a weekly basis so as to ensure constant supply to the process plant, can result in a number of s

    Jul 27, 2015

  • CIM
    Towards Sustainable Mining: Crisis Communications and External Outreach Indicators: Measuring Performance and Setting Targets

    The Beginning ! The status quo simply isn?t sustainable ! Our social license is at risk ! The bar keeps rising ? We must improve our performance, both operational and social ? We must improve st

    May 1, 2004

  • CIM
    Reducing Water Usage in Gold Treatment—What is Possible

    By Erik Spiller

    "Water and cyanide are highly contentious and conflict issues that many gold mining companies encounter worldwide when dealing with local farming communities, industries and cities competing for water

    Jan 1, 2017

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)

    By D Audeyev

    The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the op

    Oct 5, 2011

  • CIM
    Limestone Drain Design Criteria in AMD Passive Treatment : Theory, Practice and Hydrogeochemistry Monitoring at Lorraine Mine Site, Temiscamingue

    By Louis R. Bernier

    Since 1978, most systematic studies of AMD passive treatment with limestone drains (LD) have dealt with coal mines in the United States. The authors present in this paper the first results of a trienn

    May 1, 2001

  • NIOSH
    IC 8894 How To Evaluate Longwall Dust Sources With Gravimetric Personal Samplers

    By Steven J. Page

    Longwall double-drum shearers frequently have difficulty complying with the 2.0 mg/m3 dust standard and, therefore, require the use of effective dust controls. However, before dust controls can be imp

    Jan 1, 1982

  • TMS
    Atmospheric Leaching of Laterites with Iron Precipitation as Goethite

    By Houyuan Liu

    A new process was developed to recover nickel and cobalt by leaching laterite ore at atmospheric pressure and.95"-105" C. The nickel-containing goethite in limonite was first leached with sulphuric ac

    Jan 1, 2004

  • NIOSH
    IC 9040 Environmental Issues Related To Mineral Development In The Stillwater Complex, MT

    By Michael T. Nigbor

    This Bureau of Mines publication identifies the significant environmental issues associated with the potential development of strategic and critical minerals in the Stillwater Complex, MT. The Stillwa

    Jan 1, 1985