Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Alkaline Leaching - OtherUS 4,190,436 - In the cyanide leaching of gold ore in tailing or ore dump piles, or gold ore in vats or on pads, the ore is agitated and oxygenated by introducing timed bursts of air, along with cyani
Jan 1, 1982
-
Emerging Technologies in Mine Waste ManagementBy J. Zinck
The management of mine wastes generated by both active and inactive mining is an ever more challenging issue. The cost to manage and treat mine wastes, including tailings, waste rock, treatment sludge
Jan 1, 2004
-
Evaluation Of A New XRF On-Stream AnalyzerBy J. E. Gebhardt, D. King
Field-testing of a new on-stream X-ray fluorescence analyzer was conducted in a copper concentrator. The evaluation of copper tailings and concentrate streams indicated a statistically acceptable co
Jan 1, 2003
-
Pressure Leaching and Reduction at the Garfield RefineryBy J. S. Mitchell
Cobalt recovery from arsenical concentrates by pressure leaching and reduction involves special methods and operating problems. Principal steps in the process are auto-oxidation acid leaching under pr
Nov 1, 1956
-
ExoticaStripping of the Exotica open-pit mine, which is proceeding at about 120,000 tpd, is dwarfed by its proximity to the 500-million-ton Chuquicamata tailing pile. The excavating work is being carried on
Jan 11, 1969
-
Pyrite As A Stockpile Leach-AidBy John L. Uhrie
Oxide stockpile leaching operations can realize increased copper recovery and decreased acid consumption from in-situ generated acid resulting from the oxidation of intentionally introduced pyrite rec
Jan 1, 1999
-
Operation and Optimisation of the Argyle HMS PlantBy Hutton W
The Argyle Diamond Mine is the first significant diamond producer in Australia. The project has been developed with new concepts in circuit design, process control technology, organisational deve
Jan 1, 1987
-
Restoring the Site - L&M Mining Limited - Waikaka Alluvial Gold Mining Project, SouthlandBy D Manhire, G Hogan, M Ryan, S Whiteley
Site restoration at the L&M Mining Limited alluvial gold mining project at Waikaka near Gore, Southland is described. In 2000 mining operations started to recover alluvial gold beneath historical
Jan 1, 2003
-
Geochemical Studies to Characterise the Complex Sulfur Mineralogy at Red Dog Pb-Zn MineBy Stephen Day, Maria Falutsu, Gary Coulter
Open-pit mining began at Red Dog in 1989. Mining is expected to continue past 2030 but closure planning is an ongoing process. Geochemical studies of rock and tailings were begun in 1996 as part of de
Jan 1, 2000
-
Hydraulic Stope Filling on the Golden MileCut and fillstoping using hydraulically placed mill tailings has become an essential feature of stoping operations in Kalgoorlie. ' Approximately 30 per cent of the total production is current
Jan 1, 1964
-
Development of the Primary Ventilation System at Mount Isa: II. Aerodynamic Design of New FansFull aerodynamic design development of the proposed fans for the enlarged primary ventilation system at Mount Isa Mines Limited was initiated before tender specifications were prepared. Theoretical an
Jan 1, 1967
-
Beneficiation Technique Provides A Means For Capitalizing On Domestic Sources Of Cobalt ? ObjectiveDevelop new technolgies and techniques which enable recovery of strategic and critical minerals such as cobalt from domestic resources, thereby easing the U.S. dependence upon foreign producers for th
Jan 1, 1989
-
A Technical And Operational Audit Of The First 10 Years Of The Teniente Converter Operations At Nkana Smelter.By Milton Syamujulu
In 1994, Nkana smelter commissioned a Multimillion US$ Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce th
Jan 1, 2005
-
The Rise And Fall Of Mt Keast-Locating Feed For Current Retreatment Operations From A Study Of Processing History At The Zinc Corporation, LimitedIn 1976, The Zinc Corporation Limited Broken Hill set up a plant to re-process a hill of tailing (Mt. Keast) from the original treatment operations. With the likely disappearance of this source of
Jan 1, 1983
-
Some Practical Uses of Non-Linear Programming in Mine PlanningBy Beeforth C. G
The use of Non-Linear Programming to obtain improved schedules of future activity in two specific cases of mining and treatment of minerals is described. The two cases were (i) reclamation of gold,
Jan 1, 1977
-
The Anaconda C. E. Weed ConcentratorBy C. G. Palagi, S. S. Stillar
The C. E. Weed concentrator treats 51,000 tons per day of 0.5% to 0.7% copper ore received from the Berkeley Pit, the Continental East Pit and the Butte underground mines. Improved operating technique
Jan 1, 1976
-
The Anaconda C. E. Weed Concentrator (92de40b5-73a5-4107-9616-efee3d9637db)By N. Finkelstein, C. G. Palagi, S. S. Stillar
The C. E. Weed concentrator treats 51,000 tons per day of 0.5% to 0.7% copper ore received from the Berkeley Pit, the Continental East Pit and the Butte underground mines. Improved operating technique
Jan 1, 1976
-
CaroÆs Acid Queensland Mines Plant TrialsBy Fulton E, Ring RJ, Waters DJ
Laboratory leach tests of Nabarlek uranium ore carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's Acid1 (permonosulphuric acid) as an alternative oxi
Jan 1, 1978
-
IC 8945 Agglomeration-Heap Leaching Operations In The Precious Metals IndustryBy G. E. McClelland
During the 1970?s, the Bureau of Mines investigated a particle agglomeration technique for improving the flow of leaching solution through heaps of clayey or crushed, low-grade gold-silver ores, waste
Jan 1, 1983
-
Applications Of Time Domain Reflectometry In The Mining IndustryBy K. M. O’Connor
Time Domain Reflectometry (TDR) is a pulse testing technique developed by the telecommunications and power industry for use in locating breaks in cables. Variations of this principle have been utilize
Jan 1, 2003