Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Quantifying the Effects That Changes in Transmitter-Receiver Geometry Have on the Capability of an Airborne Electromagnetic Survey System to Detect Good ConductorsBy C. Samson, R. S. Smith, S. W. Hefford
"Abstract - Time-domain electromagnetic systems are most sensitive to highly conductive targets during the transmitter on-time. Data collected during the on-time is highly influenced by the geometric
Jan 1, 2006
-
Dimensioning and Construction of a Sealing Layer Made of Green Liquor Dregs Amended Till—Remediation of Sulfidic Mine Waste - Mining, Metallurgy & Exploration (2023)By J. Mácsik, J. Lindblom, C. Maurice, Susanne Nigéus
Using non-hazardous industrial residues in mine waste remediation is beneficial not only for the mining industry where substantial amounts of the waste generated have potential to produce acid rock dr
Dec 7, 2023
-
Update on Kamyr Tower Counter-Current Leaching ResultsBy James McMaster
The Kamyr Countercurrent Tower Leaching Process is intended to combine, in a single tower, thickening, leaching, separation and clarification of pregnant solution, and washing of leaching chemicals fr
Jan 1, 1990
-
Roasting at Golden BearBy J. S. McAlpine, J. Matousek, W. Muir, P. Downey, K. Major
The Golden Bear refractory gold ore roasting operation is located at Huddy Lake, in northwestern British Columbia, about BO km northwest of Telegraph Creek (see Figure 1). The mine access road, used f
Jan 1, 1992
-
Cyanide Recovery Pilot Testing And Process DesignBy Michael Botz, Craig McKenzie
Recovery of cyanide from mill tailings can be conducted to lower the overall cost of precious metals extraction, while lowering cyanide concentrations in mill discharges and potentially eliminating th
Jan 1, 1997
-
Geo Data Integration for Offshore Wind Farm ProjectsBy Paul Doherty
The offshore wind sector is booming on a global scale, with the U.S. becoming a front runner in this highly progressive market. The Global Wind Energy Council has highlighted the exponential growth i
Oct 1, 2022
-
A rock-engineering monitoring programme at West Driefontein gold mineBy D. J. Adams, R. G. Gürtunca
This paper describes the results obtained from a rock-engineering monitoring programme carried out at West Driefontein gold mine, where dewatered and classified tailings have been used as backfils for
Jan 1, 1991
-
Alkaline Leaching - OtherUS 4,190,436 - In the cyanide leaching of gold ore in tailing or ore dump piles, or gold ore in vats or on pads, the ore is agitated and oxygenated by introducing timed bursts of air, along with cyani
Jan 1, 1982
-
Emerging Technologies in Mine Waste ManagementBy J. Zinck
The management of mine wastes generated by both active and inactive mining is an ever more challenging issue. The cost to manage and treat mine wastes, including tailings, waste rock, treatment sludge
Jan 1, 2004
-
Evaluation Of A New XRF On-Stream AnalyzerBy J. E. Gebhardt, D. King
Field-testing of a new on-stream X-ray fluorescence analyzer was conducted in a copper concentrator. The evaluation of copper tailings and concentrate streams indicated a statistically acceptable co
Jan 1, 2003
-
Pressure Leaching and Reduction at the Garfield RefineryBy J. S. Mitchell
Cobalt recovery from arsenical concentrates by pressure leaching and reduction involves special methods and operating problems. Principal steps in the process are auto-oxidation acid leaching under pr
Nov 1, 1956
-
ExoticaStripping of the Exotica open-pit mine, which is proceeding at about 120,000 tpd, is dwarfed by its proximity to the 500-million-ton Chuquicamata tailing pile. The excavating work is being carried on
Jan 11, 1969
-
Pyrite As A Stockpile Leach-AidBy John L. Uhrie
Oxide stockpile leaching operations can realize increased copper recovery and decreased acid consumption from in-situ generated acid resulting from the oxidation of intentionally introduced pyrite rec
Jan 1, 1999
-
Operation and Optimisation of the Argyle HMS PlantBy Hutton W
The Argyle Diamond Mine is the first significant diamond producer in Australia. The project has been developed with new concepts in circuit design, process control technology, organisational deve
Jan 1, 1987
-
Restoring the Site - L&M Mining Limited - Waikaka Alluvial Gold Mining Project, SouthlandBy D Manhire, G Hogan, M Ryan, S Whiteley
Site restoration at the L&M Mining Limited alluvial gold mining project at Waikaka near Gore, Southland is described. In 2000 mining operations started to recover alluvial gold beneath historical
Jan 1, 2003
-
Geochemical Studies to Characterise the Complex Sulfur Mineralogy at Red Dog Pb-Zn MineBy Stephen Day, Maria Falutsu, Gary Coulter
Open-pit mining began at Red Dog in 1989. Mining is expected to continue past 2030 but closure planning is an ongoing process. Geochemical studies of rock and tailings were begun in 1996 as part of de
Jan 1, 2000
-
Hydraulic Stope Filling on the Golden MileCut and fillstoping using hydraulically placed mill tailings has become an essential feature of stoping operations in Kalgoorlie. ' Approximately 30 per cent of the total production is current
Jan 1, 1964
-
Development of the Primary Ventilation System at Mount Isa: II. Aerodynamic Design of New FansFull aerodynamic design development of the proposed fans for the enlarged primary ventilation system at Mount Isa Mines Limited was initiated before tender specifications were prepared. Theoretical an
Jan 1, 1967
-
Beneficiation Technique Provides A Means For Capitalizing On Domestic Sources Of Cobalt ? ObjectiveDevelop new technolgies and techniques which enable recovery of strategic and critical minerals such as cobalt from domestic resources, thereby easing the U.S. dependence upon foreign producers for th
Jan 1, 1989
-
A Technical And Operational Audit Of The First 10 Years Of The Teniente Converter Operations At Nkana Smelter.By Milton Syamujulu
In 1994, Nkana smelter commissioned a Multimillion US$ Dollar Chilean Teniente converter (CT) in its operations in order to improve its smelting technological base. The main objective was to reduce th
Jan 1, 2005