Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Golden Giant Mine Mill Process Description and Operating HighlightsBy R. Tessier, C. R. Larsen
"INTRODUCTIONOn November 10, 1982 Nor and a Inc signed an agreement with Golden Sceptre Resource Ltd. and Goliath Gold Mines Ltd. to construct a mine and milling facility.The Golden Giant mine is loca
Jan 1, 1986
-
A Techno-Economic Assessment of the Coal Gold Agglomeration Gold Recovery ProcessBy I. G. Townsend, S. A. Buckley, C. I. House
"SummaryBritish Petroleum plc is developing a new gold recovery process known as coal gold agglomeration (CGA) for the recovery of gold from its ores. Liberated gold grains are recovered with high eff
Jan 1, 1989
-
The use of wetlands for effluent polishing at Placer Dome, Campbell MineBy Benoit Bissonnette, David Gelderland
"The Campbell Mine Constructed Wetlands has been in full operation, processing effluent from the water treatment plant of the mill circuit for the last two years.The overall results are extremely posi
Jan 1, 2003
-
The Implementation of Floatstar Grade-Recovery Optimisation Control Solutions using Blue Cube Online Grade Analysers on Industrial Flotation Circuits (95bc70ac-0a71-42d0-95cb-764715f2cd9c)By P Moswate, D Phillpotts, S M. Mantsho, P Strobos
A challenge on many industrial flotation circuits is controlling concentrate mineral grades using measurements that are provided infrequently. The mineral grades in concentrate streams are a critical
Jul 15, 2013
-
The Aurora Super-Pump, a Large Diameter Slurry Pump for Aurora NorthBy D. Wolfe, R. Cleminson
"The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The slurry systems at Aurora experience high rates of wear, and miss
Jan 1, 2013
-
Real-time slurry elemental analyser for iron ore beneficiation plant controlBy E Portes, G Noble, J Roberto, A Stabile
Iron ore beneficiation plants are facing economic pressures to treat more challenging ore types, improve efficiency and improve product quality. Better control and stability of the plant process in th
Jul 24, 2017
-
Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant ResultsBy D. Kidby, A. Briggs
"Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating
Jan 1, 1992
-
Process Development at the Raglan ConcentratorBy Joe Holmes, Peter Langlois
"Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high
Jan 1, 2001
-
On-Site Daily Mineralogy - SIDMIN ProgramBy Fuzail Siddiqui
"The SIDMIN program aims at filling the mineral processor’s need to know the deportment of ‘minerals of interest’ not just ‘elements of interest’ that pass through the processing plants. Generally, ch
Jan 1, 2000
-
Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
-
Cyanide Recovery and Detoxification Study on Seabridge Gold’s KSM ProjectBy Dean Lindsay, Inna Dymov, Mariam Melashvili, Jim Smolik, Chris Fleming
"This paper presents results from the proposed cyanide detoxification circuit for Seabridge Gold’s KSM project. The proposed flowsheet uses a two-stage CCD (counter-current washing/decantation) circui
Jan 1, 2015
-
Determination of Silver Bearing Minerals in the Lady Loretta oreBy Donald Leroux, Dave Scott, Giovanni Di Prisco
"The Lady Loretta lead-zinc deposit in Northwest Queensland, Australia contains an average of 5.9% lead, 17.1% zinc and 97 g/t silver. Ore mineralization is mostly comprised of fairly complex intergro
Jan 1, 2002
-
The Phytoremediation and Phytomining of Heavy MetalsBy B R, R Brooks, R Simcock, R Stewart
As environmental costs incurred by the mining industry become increasingly subject to critical analysis, new technology is necessary to ensure the further development of good relationships between the
Jan 1, 1999
-
Air Tabling of Beach Sand Non-Conductors for Zircon RecoveryAir tabling of zircon-rich non-conductor products containing quartz enables most of the fine quartz present to be rejected without a markedloss of zircon. The coarser quartz in the air table feed can
Jan 1, 1962
-
Development of the SII “Mission” Mineral Sands ProjectBy D. Settles, R. Rose, P. L. Dunn
"A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre
Jan 1, 2015
-
Mineral Indicators - Aluminum: (5c12ea66-3e5c-498f-9e0e-429d4e322050)U.S. producers for more than 5 months have priced 99.5 percent primary aluminum ingot at 486 per pound. Sales by independent dealers in this same period reportedly declined by 0.5$-2.5$ to 43.50- 44.5
Jan 1, 1977
-
IC 9367 Cost-Benefit Analysis Of Computer-Assisted Mining Through Production And Cost Modeling: An Update Of IC 9281By Suresh K. Bhatt
A mathematically simulated modeling technique is used in this U.S. Bureau of Mines report to represent a hypothetical mining operation with existing mining technology and prevalent mining costs. Minin
Jan 1, 1993
-
The 1983 Economic Recovery And Measures Of Structural Change In The U.S. Economy And Mining IndustryThe last issue included a discussion of recent indications of a 1983 recovery and a brief analysis of the contribution of the U.S. mining industry to the gross national product (GNP). In this issue we
Jan 1, 1983
-
OFR-147-84 Front-End Loader Training SystemBy Jane Applegate
This report documents efforts to design, develop and test a training approach which would assist front-end loader operators in the acquisition of skills and awareness to reduce the probability of thei
Jan 1, 1983
-
IC 7436 Safety Catches on Mine Cages and Methods of Testing ThemBy J. H. East, D. Harrington
"INTRODUCTION Shaft mines, coal and noncoal alike, have a common hoisting problem that remains largely unsolved - how to obtain a mechanical device that will suspend a cage or skip in a mine shaft if
Feb 1, 1948