Search Documents

Sort by

  • ISEE
    Relative Shock And Heave – Underwater, Rock And Thermodynamic Irreversibility

    By Michael Wieland

    The work principle from thermodynamics is used to model the shock and heave for explosives shot in rock or under water, with the latter compared to reported results. The work principle utilizes restri

    Jan 1, 2007

  • SAIMM
    Field and laboratory research into the undrained behaviour of tailings at the University of Pretoria

    By S. W. Jacobsz, Y. Narainsamy

    Several high-impact tailings dam failures around the world in recent years have placed a renewed focus on the stability of tailings dams and pointed to potential shortcomings in traditional drained de

    Jun 2, 2022

  • IIMP
    Climate Risk and Ecosystem-based Adaptation Strategies: Opportunities for the Mining Industry

    By Gabriel Castillo

    The global warming and the associated changes in climate variability would increase the risk to the mining industry in both magnitude and frequency. Consequently, extreme climate conditions would dist

    Sep 29, 2023

  • DFI
    Turning the Valley of Ashes into a Tennis Haven: The Development History of the USTA Site in Queens, NY

    By Athena C. Denivo, Pablo V. Lopez, Michael McMaster, Sissy Nikolaou, Alfred H. Brand

    "The paper presents the history of development of the United States Tennis Association (USTA) site, focusing on geotechnical, geoseismic, and foundation engineering challenges associated with it. The

    Jan 1, 2016

  • SAIMM
    Exploring the use of chemical indicators for determining recoverable value in PGM tailings by froth flotation, R.M. Manenzhe, M. Tadie, and K.C. Corin

    By K. C. Corin, M. Tadie, R. M. Manenzhe

    The near depletion of high-grade ores, among other factors, has necessitated the consideration of alternative PGM sources. Various factors in the metallurgical processing of ores result in valuable mi

    Jan 1, 2020

  • SME
    The Sage Mill Project

    The Sage Mill Project w approved by Santa Fe Pacific Gold Corporation's Board of Directors in October 1994. The Sage Mill Project included a pressure oxidation plant designed and constructed to p

    Jan 1, 1999

  • SME
    A New Tool In Financial Decision-Making Under Uncertainty

    By R. K. Singhal

    This new tool can be used for the proper assessment of the potential economic wealth of any risky capital project. It does provide an unambiguous recommendation of the type "go or no go" to the deci

    Jan 1, 1993

  • AUSIMM
    Ventilation contaminant characterisation for a greenfield project

    By A Hatt

    This paper presents a case study of characterisation work undertaken at a greenfield exploration project to provide engineering and OH&S inputs for the design of a ventilation system. The paper discus

    Oct 12, 2022

  • AUSIMM
    Electrodeposition and electrochemical behaviour of molybdenum ions in ZnCl2-NaCl-KCl molten salt

    By H Zhang, S Li, J Song, Z Lv

    In this paper, a method for extracting and refining metallic molybdenum using low-temperature ZnCl2- NaCl-KCl molten salt was proposed. The electrochemical behaviour of molybdenum ions in ZnCl2- NaCl-

    Aug 21, 2024

  • AUSIMM
    Collaboration and change management, keys to successful automation implementation

    By D Kilkenny, D Nardini, P Kline

    This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate

    Mar 15, 2021

  • AUSIMM
    In situ study of mineral liberation at the onset of fragmentation of a copper ore using X-ray micro-computed tomography

    By R W. Henley, L Knuefing, M Turner, Y Zhang, M Saadatfar, A Limaye, R Cruikshank, M A. Knackstedt, A Kingston, L Beeching, N Francois

    A better understanding of ore fragmentation and the textural features of ore is a key to the energy efficient extraction of targeted minerals from low-grade ore deposits. In this study, X-ray microcom

    Aug 24, 2022

  • AUSIMM
    The effect of FeO/SiO2 ratio on the feasibility of utilising iron silicate slags as supplementary cementitious materials

    By R A. Anand, N N. Viswanathan, M M. Pande

    Slags are the most voluminous solid by-products generated in pyrometallurgical operations, and, as such, finding an application for these oxidic materials is pertinent to maintaining resource efficien

    Jun 19, 2024

  • AUSIMM
    Nova-Bollinger unfolding versus DA estimate

    By P M. Hetherington, M P. Murphy, K E. Crook, F Pym

    Resource characterisation is critical for informed decisions in both strategic and operational space. The sources of information for resource characterisation are limited by: direct measurement of res

    Mar 22, 2022

  • AUSIMM
    Measuring circular economy through life cycle assessment – challenges and recommendations based on a study on recycling of Al dross, bottom ash and shavings

    By G Tranell, E Pastor-Vallés, A Vallejo-Olivares, J B. Pettersen

    Metals are essential for the sustainability transition and decarbonisation of society. Yet, it will be paramount to produce them sustainably and minimise the affiliated resource and energy use and the

    Aug 21, 2024

  • DFI
    Comparing Conflicting Conclusions from Different Integrity Testing Methods on the Same Drilled Shafts

    By Alex Ryberg, Matthew L. Becker

    Several integrity testing methods exist which may be used to evaluate drilled shafts. Each test method has advantages and limitations. On occasion, the results from different test methods may lead to

    Sep 8, 2021

  • DFI
    Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, Connecticut

    By Theodore von Rosenvinge

    Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har

    Jan 1, 2011

  • DFI
    Deep Foundation Advancements in Fargo

    By Ezra Ballinger, Matthew R. Glisson

    Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground

    Jan 1, 2019

  • DFI
    Deep Foundation Ground Anchors In The Wind Energy Industry - Current Status Of Design And Construction Practices And Introduction Of A Patented System To Improve Foundation Performance

    By Josef K. Alter

    Long-term performance and behavior of post-tensioned ground anchors subjected to axial cyclic loading constitutes an important aspect of the stability, reliability and overall performance of wind turb

    Jan 1, 2010

  • DFI
    Design Build of the New NY Bridge Foundations

    By Leykam Chris J., Jacobs Scott. A.

    "Construction of the New NY Bridge over the Hudson River 25 miles north of New York City is one of the largest civil infrastructure projects presently underway in the United States (formerly Tappan Ze

    Jan 1, 2016

  • SAIMM
    PYRAMP – A platform for resource assessment and mine planning in Jupyter APCOM 2021

    By F. Navarro, F. Soto, G. Díaz, E. Jélvez, G. Morales, N. Morales

    The increasing availability of tools on the web provides a great opportunity for the research community to boost investigation by accessing computational resources from all over the world. For example

    Sep 1, 2021