Search Documents

Sort by

  • SME
    Mine haul road design and management: a review of current practice - SME Transactions 2010

    By R. J. Thompson

    Well-designed and maintained haul roads are the key to minimizing truck haulage onroad hazards and costs, as well as increasing productivity. In practice, however, designing and managing a haul road f

    Jan 1, 2010

  • CIM
    Industrial clay resources and opportunities in Saskatchewan

    By Paul Guliov

    Industrial clays, including a variety of bentonites and kaolinbased clays in southern Saskatchewan are hosted by Late Cretaceous and Early Tertiary sediments. Ofparticular significance are the deposit

    Jan 1, 2001

  • SME
    Seismic Potential Forecasting in a Deep Longwall Mine

    By J. Fuller, J. Beale, Q. Justice, Z. Agioutantis, S. Hicks, Z. Khademian

    Seismic events can be induced by mining due to unstable rock failures or slips along geologic structures leading to the sudden release of strain energy stored within the rock near underground openings

    Jun 25, 2024

  • SME
    A Comparative Analysis of Deep‑Level Mine Water Wastage Identification Techniques - Mining, Metallurgy & Exploration (2024)

    By J. H. van Laar, C. S. L. Schutte, M. Le Roux

    Highly energy-intensive systems prone to wastage are significant causes of unnecessary energy losses in industry. Deep-level mine chilled water reticulation systems fall within this category of ineffi

    Jan 31, 2024

  • SAIMM
    Rockburst risk management in deep hard rock mines: A multi-tiered approach with dynamic ground support as the last line of defense

    By B. Simser

    Rockbursting around underground excavations continues to be a core risk for many deep mining operations. Numerous advancements in mine design, preconditioning, monitoring, mining equipment, exclusion

    Nov 24, 2025

  • TMS
    Effect of Slag Phase on Mixing and Mass Transfer in a Model Creusot Loire Uddeholm (CLU) Converter

    By R. H. Eric, A. Chaendera

    Gas jet was blown through bottom nozzles of a 1/5th scale CLU model in the presence and absence of slag. Kerosene and water were used to simulate the slag and metal phases respectively. Mixing time in

    Mar 1, 2017

  • TMS
    The Thermodynamics of Slag Forming Inorganic Phases in Biomass Combustion Processes

    By Daniel K. Lindberg, Fiseha Tesfaye

    To reduce the use of fossil fuels and increase self-sufficiency in energy, nowadays, there is an increasing interest to produce heat, power and transportation fuels from renewable resources. Solid biom

    Mar 1, 2017

  • SME
    Effect of Deck Length on Ground Vibration in Dragline Bench Blasting Using Artificial Intelligence Methods - Mining, Metallurgy & Exploration (2024)

    By Shankar Kumar, Arvind Kumar Mishra, Chitranjan Prasad Singh

    Formulating a predictive model for blast-induced ground vibration (BIGV) has always been challenging due to the complex non-linear relationship between the BIGV and its influencing factors. Researcher

    May 15, 2024

  • SAIMM
    A Finite Element Model Of A Søderberg Electrode With An Application In Casing Design

    By W. A. Gericke, B. Olmstead, I. Mc Dougall, C. F. R. Smith

    A finite element model was generated of a Søderberg electrode in a ferromanganese smelter. In this model, the casing and fins were modelled explicitly, and temperature-dependent material properties we

    Jan 1, 2004

  • CIM
    Commercial Aspects of Gold Applications : From Materials Science to Chemical Science

    By Christopher W. Corti

    A major aim of the GOLD 2003 conference, is to promote new gold related science and technology with a view to developing new useful industrial applications for gold. Current industrial uses have provi

    Oct 1, 2003

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • CIM
    Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’

    By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond

    "Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control

    Jan 1, 2010

  • AUSIMM
    Notes on Practical Mining in Bendigo

    In undertaking to write a few notes on practical mining in Bendigo, the great quartz mining centre of Victoria, which just now is celebrating its fiftieth anniversary of gold mining, satisfaction must

    Jan 1, 1902

  • ISEE
    Breakthrough in the Portrayal of Explosive Energy

    By Claude Cunningham

    Difficulty has always attended the evaluation of rock breaking energy available from explosives, owing to the complexity of the way in which it is released, and the destructive amplitude of the pressu

    Jan 1, 2000

  • SME
    The Next Step Change In The Size Of Mining Projects

    Many of the world?s largest existing mines are considering substantial step changes in production volumes, compensating for declining ore grades while trying to address increases in world demand for r

    Feb 27, 2013

  • NIOSH
    IC 9446 - Proceedings: New Technology for Ground Control in Retreat Mining (527573bb-29f1-4fad-af4c-300b18740c2b)

    By Christopher Mark

    This proceedings volume contains papers presented at technology transfer seminars sponsored by the National Institute for Occupational Safety and Health (NIOSH) on New Technology for Ground Control in

    Jan 1, 1997

  • SME
    Proposal for a top-down/bottom-up Approach to build up Indicators of Sustainable Development for Use in the Mining Industry in Africa

    By G. Récoché, A. Chamaret, M. O’Connor

    Building indicators that respond to all stakeholders' needs is a time-consuming and complex exercise, with certain questions still unsolved. The aim of the current three-year research project, ca

    Jan 1, 2005

  • SME
    Diesel Particulate Matter –So What’s The Big Deal?

    By E. A. Metz

    Perfect combustion in an engine would produce only water vapor, carbon dioxide and nitrogen as by-products; however, complete combustion is never achieved. As a mobile power plant, the diesel engi

    Jan 1, 2001

  • CIM
    The Platinum-Group Minerals

    "7.1. Glossary of the Platinum-Group Minerals7.1.1. IntroductionA glossary of the platinum-group minerals (POM) serves as a useful introduction to a chapter on their mineralogy. Earlier glossaries (Ca

    Jan 1, 1979

  • NIOSH
    OFR-11(2)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume II - Appendices

    By Daniel I. Carey

    Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It

    Jan 1, 1981