The Design Criteria Of A New Precision Weighing High Capacity Conveyor ScaleBy Donald Babbitt
In 1971, during the planning and design stages of a $300 million expansion, the Iron Ore Company of Canada Ltd. through its Engineers, Canadian Bechtel Ltd., came out with a preliminary request for tw
Jan 1, 1975
-
Arsenic Depression in the Flotation of Broken Hill Lead ConcentratesBy Quast K
A series of laboratory flotation tests were conducted to evaluate the effectiveness of various depressants as arsenic (and zinc) depressants in the lead cleaner stage of the NBHC mill at Broken Hill
Jan 1, 1991
-
LibraryThe Library of the above-named Societies is open from 9 A.M. to 9 P.M. on all week-days, except holidays, from September 1 to June 30, and from 9 A.M. to 6 P.M.. during July and August. The Library co
Jan 5, 1913
-
Exxon Minerals Company, U.S.A. Highland Uranium Operations Geology And Mining MethodsBy Ronald A. Murdock
INTRODUCTION Exxon's Highland Uranium Operations in eastern Wyoming consists of an open pit, an underground mine and a mill complex. The geology of the deposit is reviewed in this paper, and
Jan 1, 1983
-
Applications of Exhaust Steam Turbines to The Power Plants of Mines.The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Mining Engineers, as well as the engineering and mining profes
Jan 1, 1911
-
Extensive Duct‐Fan Systems with In‐line Booster Fans: Planning for Partial Vacuum and an Algorithm for In‐line Booster Fan Positioning (Mining, Metallurgy & Exploration)By J. R. R. Bowling, A. McFadden, M. Francoeur
The abstract discusses the increasing use of extensive duct-fan systems in underground hard-rock mine development. It highlights the challenges of designing these systems, particularly the risk of par
Mar 17, 2022
-
Introduction To Mine Planning And Scheduling ApplicationsBy Betty L. Gibbs
Mine planning and scheduling done with computer programs is possible only after extensive work has been completed to define the geologic extent of an ore body and an overall mine design. Mine planning
Jan 1, 1989
-
RI 4031 Studies on Explosives & Explosions, Fiscal Year 1945By Walter J. Huff
"INTRODUCTION The technical studies conducted by the Explosives Division of the Bureau of Mines have been summarized in a series of publications issued annually for the past 10 years. 3/ The following
Oct 1, 1946
-
Image Analysis Evaluation of Mineral Behaviour during a Laboratory Flotation Test of the Zinc-Lead Volcanogenic Ore from the Faro Deposit, YukonBy William Petrul
Image analysis studies were performed on mill products from laboratory flotation tests of the Zn-Pb ore from the Faro deposit in Yukon, Canada, to determine mineral liberations at specific grinds and
Jan 1, 1989
-
The Oil Demand, Supply And Price In 1928By Campbell Osborn
FROM the viewpoint of practical economic engineering the main value in studies of demand and supply lies in the information they give concerning the next movement of price. The title of this discussio
Jan 1, 1928
-
SPOTLIGHT on project management in the metallurgical industryBy J. D. Koch
The past ten years or so have seen many changes in the methods and approach adopted for projects in the metallurgical and mining industry in South Africa. These changes have led to an increased use by
Jan 1, 1981
-
Recent Developments In Air ClassificationBy Fred T. Towne
There are a number of air classifiers manufactured throughout the United States and the rest of the world. The classifiers manufactured by Alpine, A. G. of Augsburg, Germany, are unique in their abili
Jan 1, 1965
-
Laser Synthesis of Conductive Phases in Silicon Carbide and Aluminum NitrideBy Nathaniel R. Quick
"Nd: YAG, KrF excimer, and Cu-vapor lasers are used in air to synthesize conductors and semiconductors as a second phase in silicon carbide and aluminum nitride. Conductor resistivities as low as 104
Jan 1, 1994
-
A technique for estimating the sound power level radiated by pneumatic rock drills and the evaluation of a CSIR prototype rock drill with engineering noise controls ? Synopsis (NIOSH, Pittsburgh, Pa., USA.)By P. G. Kovalchik
Overexposure to noise remains a widespread, serious health hazard in the US mining and other industries despite 25 years of regulation. Most categories of illnesses and injuries associated with mining
Jan 1, 2009
-
Benefits Of Small Taconite PelletsBy Herbert F. Nyberg
The Black River Falls Mine is owned and operated by Jackson County Iron Company, a wholly owned subsidiary of Inland Steel Company. It is located in vest central Wisconsin, seven miles east of the cit
Jan 1, 1976
-
Depósitos de plomo y zinc de la cordillera negra, Dpto. de Ancash, Perú (IV)By Alfred Bodenlos
El presente texto señala los depósitos de zinc y plomos encontrados en los cateos del flanco noroeste del cerro Huancapetí, perteneciente a la Cordillera Negra. En el flanco noroccidental del cerro Hu
Nov 1, 1957
-
Savage River Mines -The World's First Long-Distance Iron Ore Slurry PipelineBy W. F. McDermott
This paper covers the development, construction and operation of a 53-mile slurry pipeline operating in Tasmania, Australia. Special development techniques are discussed, as well as the operation of t
Jan 1, 1970
-
Modeling multiple geologic domains in mineral deposits with an implicit signed distance function approach - SME Transactions 2016By C. V. Deutsch, D. A. Silva
The geologic modeling of multiple domains is required for the prediction of mineral resources and reserves. In general, explicit methods have wide acceptance among modelers due to the ability to manua
Jan 1, 2016
-
A High Level Dynamic Analysis Tool To Study The Impact Of Surge Capacity/stockpile Sizing Early Stage Of The Iron Ore ProjectsBy Dennis Travagini Cremonese
In the early stage of front end studies of an Iron Ore Project, the sizing of surge capacities and stockpiles are normally assumed based on the experience of the study team. Understanding and sizing o
Aug 1, 2018
-
The Use of Dynamic Programming for Determining Mine-Mill Production SchedulesBy Ronald J. Roman
All mining and milling complexes can, within limits, operate at a variety of production rates. Factors of economic importance that are affected by production rates are costs per unit production, recov
Jan 1, 2014