  • AUSIMM
    Determining Gold Particle Size in Gravity Ores for Sampling and Metallurgical Characterisation - Discussion and Test Protocol

    Sampling protocols and metallurgical flow sheets should be designed to suit the style of mineralisation in question. In support, the a priori need for evaluation programs is the characterisation of th

    Aug 1, 2010

  • AUSIMM
    Maximising Payable Gold in Base Metal

    Breakwater Resources Ltd is a Canadian base metals producer with Cu-Pb-Zn operations in Canada, Honduras, and Chile. Two of its operations contain economical gold levels which are recovered in both gr

    Aug 1, 2010

  • CIM
    Design and Permitting of a New Uranium Mill Facility in the United States

    By Kimberly Morrison

    Strategically located within the Uravan Mineral Belt District of western Colorado, the Piñon Ridge Project is the first new uranium mill being proposed for construction in the United States in over 25

    Aug 1, 2010

  • CIM
    Electric Resistance Heating for Thawing of Frozen Uranium Tailings

    The Rabbit Lake In-Pit Tailings Management Facility contains frozen layers of tailings due to subaerial deposition during the coldest periods of winter. Thawing is required to ensure full consolidatio

    Aug 1, 2010

  • CIM
    Cover Systems for the Uranium Industry: Are We Doing it Right?

    By Ward G. Wilson

    Best practice in the design and construction of soil cover systems for mine waste management has advanced extensively over the past two decades. While significant progress has been achieved, we still

    Aug 1, 2010

  • CIM
    Inflows in Uranium Mine of Northern Saskatchewan: Risks and Mitigation

    By James F. A. Hatley

    Northern Saskatchewan comprises an area of about 350 000 km2 and boasts some of the world's largest known high-grade uranium deposits. The successful mining of these deposits, however, can not be

    Aug 1, 2010

  • CIM
    The Development of Uranium Mining in Australia: a Look from the Past to the Future

    By John Battista

    Uranium mining in Australia has a chequered history. This paper reviews the development of the Australian uranium mining industry from the 1930?s to the present day. It outlines the geology of the var

    Aug 1, 2010

  • CIM
    Selenium and Molybdenum Removal from Contaminated Mill Process Effluent: Cameco Key Lake Operation

    By Arthur Lieu

    The mill effluent treatment circuit (Bulk Neutralization (BN)) in the Cameco Key Lake Operation was modified in 2008 to enhance the removal efficiency of selenium (Se) and molybdenum (Mo) from the mil

    Aug 1, 2010

  • AUSIMM
    Development of the Sao Chico Gold Project, Brazil - ABSTRACT ONLY

    The Sao Chico gold project is located on the Tocantinzinho trend which is the most mineralised zone in the Tapajos Mineral Field of Brazil (see Figure 1). The Tapajos goldfi eld was the site of the bi

    Aug 1, 2010

  • CIM
    Autogenous and Semiautogenous Mills 2010 Update

    By Stuart M. Jones

    This paper is derived from a document that compiles autogenous and semi-autogenous mill installations worldwide, through the end of 2010. Updates have been solicited from all major mill manufacturers

    Aug 1, 2010

  • CIM
    Hadean Uranium Activity 3rd International Conference on Uranium (Uranium 2010), 40th Annual Hydrometallurgy Meeting

    By Therese Schneck

    The presence of xenon isotopes from in-situ spontaneous fission of short-lived Pu244 has been confirmed in Hadean detrital zircons from Western Australia. Hadean and meteoritic zircons can retain seco

    Aug 1, 2010

  • CIM
    Australia?s in situ Recovery Uranium Mining best Practice Guide: Groundwaters, Residues and Radiation Protection

    By I. B. Lambert

    The guide has been developed by officials from resources and environment agencies in the Australian Government and the South Australian and Northern Territory Governments. It elaborates on the Austral

    Aug 1, 2010

  • CIM
    Theoretical Investigation of Structural and Mechanical Changes of Urania Oxidized to U3O8

    By B. Szpunar

    Structural and mechanical changes of urania are investigated when oxidized to U3O8. The CASTEP ab-initio quantum mechanical program, employing density functional theory is used. The total energy techn

    Aug 1, 2010

  • CIM
    Uranium Developments: Aquatic Risk Assessment and Management

    By P. M. Chapman

    Risks to aquatic receiving environments from uranium mining and milling fall into three categories: physical (habitat change), chemical (e.g., uranium, selenium, total dissolved solids [TDS], metals i

    Aug 1, 2010

  • CIM
    Translation of Environmental Leadership Objectives Into Routine Project Execution for the Uranium Mining Industry.

    By Jeremy Breker

    Cameco aligns its social and environmental responsibilities with its vision, mission and values. Environmental Leadership is established as a corporate objective that emphasizes the triple-bottom-line

    Aug 1, 2010

  • AUSIMM
    Recovery of Gold from Gravity Tailings by Flotation

    The purpose of this study was to investigate the effectiveness of froth fl otation for the recovery of gold from the gravity tailing stream of the former Lihir Gold Limited (LGL) operation in Ballarat

    Aug 1, 2010

  • CIM
    Chemical Analysis of Uranium Ores

    By H. Polkowska-Motrenko

    Analytical methods for the determination of uranium and other precious elements in ores, industrial wastes and by-products have been developed. The analytical techniques employed are NAA and ICP-MS. T

    Aug 1, 2010

  • CIM
    A Reliability Based Design Procedure for Mine Dewatering Systems

    By Rashid Bashir

    The presence of groundwater in the form of large aquifers can have an important influence on investment decisions for underground mines. The design for such mines requires development of special minin

    Aug 1, 2010

  • CIM
    Evaluation of a new Milling Process for the Caetité-Brazil Uranium Ore

    By L. A. Gomieroa

    The Caetité-Brazil uranium facilities produce about 340 t/y of uranium from an ore averaging 0,25 U %. The process steps are ore crushing, heap leaching with sulfuric acid, U separation and purificati

    Aug 1, 2010

  • CIM
    Dissolution-Precipitation Processes on the Surface of Uranyl-Minerals

    By Michael Schindler

    Uranyl mineral dissolution appears to be complex, affected by factors such as solution pH and the presence of various cations in solution, and sometimes involving formation of secondary surface precip

    Aug 1, 2010