Search Documents

Sort by

  • AUSIMM
    Creating a Geotechnical Baseline Report for Project Hobson, Auckland

    Project Hobson involves the replacement of an existing 90-year-old above-ground sewer that crosses Hobson Bay in Auckland, New Zealand, and which is nearing the end of its economic life, with a 3 km l

    Jan 1, 2008

  • AUSIMM
    Development of a Taxonomy for Indexing Web-Based Mining Safety and Health Research

    To solve the mining safety and health needs of the future, access to, and sharing of, timely and relevant information will be crucial. The next generation of the Web will provide tools (RDF, OWL, SPAR

    Jan 1, 2008

  • AUSIMM
    Internet-Based Remote Machinery Control

    By W R. Hancock

    Control of complex machinery through the internet is investigated through the construction of a vehicle prototype developed using off-the- shelf hardware. The vehicle was able to be controlled remotel

    Jan 1, 2008

  • TMS
    On Promoting Energy Conservation In Hydrometallurgical Processing Of Complex Materials

    By K. Sarveswara Rao

    The present paper firstly describes some recent trends from literature on energy management via process intensification to arrive at sustainable technologies for aqueous processing of minerals, metals

    Jan 1, 2008

  • AUSIMM
    The Ore Deposits of the South-East Missouri Cobalt-Copper-Lead-Zinc District û Mineralogy, Ore Textures, Applied Mineralogy and Ore Controls

    The south-east Missouri cobalt-copper-lead-zinc district is the worldÆs largest lead producer and a significant producer of by-product zinc, copper, cobalt, silver and cadmium. Current production in t

    Jan 1, 2008

  • TMS
    Decomposition Process For Polychlorobiphenyl Containing 1 To 5 Chlorine By Using Basic Molten Salts As Reaction Field

    By Osamu Takeda

    A decomposition process for PCBs by using basic molten salts as a reaction field was investigated in order to establish a safe, simple and highly efficient decomposition process for polychlorobiphenyl

    Jan 1, 2008

  • TMS
    CFD Simulation of a Copper Converter With Bottom Air Injection

    By Jesus Gonzalez

    Peirce-Smith converters (PSC) are long cylindrical chemical reactors where copper matte reacts with air. Traditionally, air is injected laterally through submerged tuyeres at different subsonic veloci

    Jan 1, 2008

  • AUSIMM
    Supergene Dispersion of Antimony and a Geochemical Exploration Model for Antimony Ore Deposits

    By P A. Williams, P Leverett

    Many of the worldÆs stibnite deposits are found in orogenic zones and are mesothermal or epithermal in origin. They commonly occur near contacts between intrusives and metasediments. However, the spat

    Jan 1, 2008

  • NIOSH
    Metal Operator Mining Facts ? 2006 - Mining Operations

    In 2006, a total of 280 metal mining operations reported employment to the Mine Safety and Health Administration (MSHA).1 Metal mines were the smallest mining commodity sector, comprising 1.9% of all

    Jan 1, 2008

  • SME
    Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer - Addressing Environmental Issues

    By Adrian Coombs

    The York Durham Sewage System (YDSS) Interceptor Tunnel Project is located in the Town of Richmond Hill, Ontario, Canada, just north of Toronto. Construction commenced in September 2006 and completion

    Jan 1, 2008

  • AUSIMM
    A Chronostatistical Approach to Hydrometallurgical Plant Process Control

    By R C. A Minnitt

    This paper illustrates the use of variography and moving average plots as an aid to analysing variations in the process that can be used to direct the improvement efforts. The hydrometallurgical proce

    Jan 1, 2008

  • AUSIMM
    Big Diameter Tunnelling Beneath Low Rock Cover

    By N McKenzie, F Brodbeck

    The North-South Bypass Tunnel is the first project to get underway as part of BrisbaneÆs transport plan, which aims to improve the urban road network. The total length to be excavated is 6.8 km, which

    Jan 1, 2008

  • TMS
    Electrocatalytic Reduction of CO2 to C2H4 at a Gas/Solution/Metal Interface

    By Kotaro Ogura

    "The electrolysis process in which CO2 is selectively reduced to C2H4 at a three-phase(gas/solution/metal) interface on a copper-mesh electrode has been developed in a concentrated solution of potassi

    Jan 1, 2008

  • SME
    Comparison of Different Blast Design Models, Using a Blasting Software

    By Roozbeh Afzali

    Designing an appropriate tunnel blasting pattern reduces the cost of rock breakage and subsequent operations such as loading, haulage and support of tunnels. For that reason, we developed a software t

    Jan 1, 2008

  • DFI
    Challenges And Recommendations For Quality Assurance Of Deep Foundations

    By Frank Rausche

    Although Quality Control (QC) during construction is preferable for deep foundations, there are many instances when it is necessary to resort to Quality Assurance (QA) methods if, for various reasons,

    Jan 1, 2008

  • AUSIMM
    Microtunnelling the Ocean Outfall Pipeline, Christchurch, New Zealand

    By R Fleming, G Jones

    An ocean outfall is currently under construction in Christchurch, New Zealand to transfer treated wastewater from the existing treatment ponds at the city wastewater treatment plant to diffusers locat

    Jan 1, 2008

  • TMS
    Waste Heat Recovery: Opportunities And Challenges

    By Ilona Johnson

    United States metals and non-metallic minerals manufacturing consume about 5,000 trillion Btu annually. Various studies estimate that as much as 20 to 50 percent of this energy is lost as excess or wa

    Jan 1, 2008

  • SME
    Pre-Support Measures for Shallow NATM Tunneling in Urban Settings

    By Vojtech Gall

    Pre-support measures for urban tunneling have seen a substantial development in the recent past. Ground improvement techniques, pipe-arch and spiling methods now allow for non-disruptive tunneling at

    Jan 1, 2008

  • SME-ICGCM
    Detecting Strata Fracturing and Roof Failures from a Borehole Based Microseismic System

    By Tara Bajpayee

    Modern, highly productive underground mining operations need to assure the safety of their workforce by understanding where major strata fractures and roof failures could occur. Mines depend on a hos

    Jan 1, 2008

  • CIM
    Application of the SART Process to Heap Leaching of Gold-Copper Ores at Maricunga, Chile

    By Kevan J. R. Ford, Chris A. Fleming, Robert D. Henderson

    "Kinross Gold Corporation’s Maricunga mine in Chile presents an ideal opportunity to apply the SART process to a heap leach operation. Given increasing levels of cyanide complexed copper in current pr

    Jan 1, 2008