Search Documents

Sort by

  • AUSIMM
    Checking Precision and Bias Before and After Construction of Sampling Systems

    Sampling systems are never perfect. They all have some bias and give variable sampling errors. The ways of thinking about bias and precision should be different before and after construction (or recon

    Jan 1, 2008

  • NIOSH
    Empirical Design of Span Openings in Weak Rock based upon Support Type Employed

    By A. M. Ouchi

    Existing empirical design tools have been developed from fair-to-good quality rock masses (RMR76 >50). This paper presents a focus of ground control research presently being conducted by the Roc

    Jan 1, 2008

  • SME
    Small Mine Contractor Safety - Case Studies

    By F. Calizaya

    The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind

    Jan 1, 2008

  • SME
    Role Of The Mill In A Competitive Minerals Company - Is Low Cost Enough?

    By Bruce Cavender

    Historically, the processing function has been regarded as efficiently managed as long as production costs were kept low, recovery was adequate and sufficient plant capacity was avail-able. In this pa

    Jan 1, 2008

  • CIM
    Selection of optimum ferronickel grade for smelting nickel laterites

    By B. Wasmund, M. Y. Solar, I. Candy

    The nickel laterite industry is divided into two camps when it comes to the grade of the ferronickels produced. One group, led by Falcondo and Cerro Matoso, markets high-grade ferronickels in the rang

    Jan 1, 2008

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • AUSIMM
    Designing Feedwells for the 21st Century

    In the current climate, there is a real need to bridge the gap between theory and the real world mining considerations, and develop viable, cost-effective, high performance thickeners. With a greater

    Jan 1, 2008

  • TMS
    Desulfurization during Calcination of Anode-Grade Petroleum Coke

    By Xiping Chen, Wangxing Li, Jiemi Zhou

    "Desulfurization methods suitable for anode-grade petroleum coke (coke for short) used in primary aluminum industry are coke desulfurization during calcination, desulfurization in soakage and desulfur

    Jan 1, 2008

  • SME
    Final Tunnel Liner at Mill Creek 3 Project - Case Study

    By M. Schafer

    The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac

    Jan 1, 2008

  • SME
    Transbay Transit Center - Keeping DTX on Track

    By Derek J. Penrice

    A critical element of the Transbay Transit Center Program, the Caltrain Downtown Extension (DTX) will extend commuter rail service into downtown San Francisco and accommodate future statewide high-spe

    Jan 1, 2008

  • AUSIMM
    Microtunnelling Solution for Bulimba Creek Trunk Sewer

    By A Domanti, C Jewkes

    This paper describes the design and constructability issues investigated in the selection of a trenchless solution in comparison to trenched construction options as part of a scoping study for the aug

    Jan 1, 2008

  • AUSIMM
    A Day in the Life of a Mine Worker in 2025

    By V Srinivasan, P Knights, C T. Farrelly

    By 2025, with the widespread industry adoption of remote operation centres and advanced analytics, mining companies will find themselves making better, more informed decisions across the value chain.

    Jan 1, 2008

  • AUSIMM
    Use of Scanning Electron Microscopy-Based Automated Quantitative Mineralogy for the Characterisation of Ni-Rich and Ni-Poor Goethite in Laterites

    By B Snook, G Rollinson, R Fairhurst, R Herrington

    Nickel laterites constitute a significant proportion of the worldÆs Ni reserves and are considered environmentally friendly alternatives to traditional sulfide resources. Subsequently they are of incr

    Jan 1, 2008

  • NIOSH
    Effects of Sampling Artifacts on Occupational Samples of Diesel Particulate Matter

    By James Noll

    Total carbon (TC) is sometimes used to measure or characterize diesel particulate matter (DPM) in occupational settings such as underground mines. DPM samples are collected on quartz fiber filters. Wh

    Jan 1, 2008

  • AUSIMM
    The Black Mountain Porphyry Copper-Gold Deposit, Baguio District, Philippines

    By P Waters, P Hollings, M Baker, D R. Cooke

    Over the last three million years, porphyry and epithermal mineralisation in the Baguio Mineral District has been driven by calc-alkaline magmatism associated with the subduction of the South China Se

    Jan 1, 2008

  • AUSIMM
    Fluid Inclusion Insights into the Origins of Fluids and Metals in Porphyry Copper Deposits

    By A H. Hofstra, G P. Landis, P Emsbo, A G. Hunt

    Models of the evolution of the hydrothermal systems that form porphyry Cu (Mo-Au) deposits are compromised because aqueous magma-derived fluids in the ore zones of most deposits have changed from thei

    Jan 1, 2008

  • NIOSH
    The Modified Direct Method: A Solution For Obtaining Accurate Coal Desorption Measurements

    By W. P. Diamond

    The direct method test was developed for general mine safety applications by the U.S. Bureau of Mines in the early 1970's to measure the gas content of coal samples obtained from the relatively s

    Jan 1, 2008

  • TMS
    Recovery of Metal Values from Industrial Waste Water in Galvanization Process

    By M. A. Rabah, F. E. Farghaly, M. A. Motaleb

    "Wastewater from industrial galvanization industry was reclaimed under current flow stream conditions. Results showed that the raw water contains 0.7 % by weight total suspended solids (TSS) causing t

    Jan 1, 2008

  • SME
    Mill Feed: By 8 m Ore Block Assay, Or By 8 cm Rock Sensing? Sorting Technology Can Fill The Gap Between Mine And Mill.

    By G. Van Weert

    Mining project feasibility is projected from a geological model and a mining plan. Ore grade is assumed to be continuous, based on drill hole assays as much as 80 m apart. Eighty meter is 80,000,000 m

    Jan 1, 2008

  • AUSIMM
    On the Use of Dry Pulp Duplicates in Quality Assurance/Quality Control - A New Tool of the Trade

    Same-batch and non-blind as well as blind pulp duplicates are often submitted as quality assurance/quality control (QA/QC) control samples to a routine laboratory along with routine assays (and other

    Jan 1, 2008