Search Documents

Sort by

  • DFI
    Geophysical Methods for Site Characterization for Marine Foundations (2dc87bb8-7bfd-4523-92cd-c3dfe612556c)

    By Richard E. Sylwester

    Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is prim

    May 11, 2007

  • DFI
    Quality Control of Production Pile Installations for US-90 Replacement Bridge Over St. Louis Bay

    By Kevin Kuhl

    With the destruction of the US-90 Bridge spanning St. Louis Bay by Hurricane Katrina, the State of Mississippi awarded its first major design-build contract in order to have a completed four-lane brid

    May 11, 2007

  • DFI
    Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)

    By William B. Conway

    This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du

    May 11, 2007

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)

    By Robert B. Bittner

    The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in

    May 11, 2007

  • DFI
    Construction Of The Main Tower Pier Caissons For The Greenville Bridge In Mississippi

    By F. Keith Jacobson

    To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus

    May 11, 2007

  • DFI
    Construction of Large Drilled Shafts the 2nd Annual Mike O'neill Lecture

    By Dan Brown

    Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.

    May 11, 2007

  • CIM
    Sudden slumping of hydraulic fills inside geotextile bags

    By H. J. lgner

    Hydraulic fills are widely used in the tabular, steeply dipping stopes of the South African gold and platinum mines as an integrated process within a daily cycle of drill and blast. There is therefor

    May 1, 2007

  • CIM
    The Hydrogen Economy: Current Reality and Future Prospects from the Perspective of a Major Producer

    By Pierre Gauthier

    Is the hydrogen economy of the future just another fish story? Absolutely not! There have been many changes affecting the energy equation over the last 10 years and conditions have changed. In this

    May 1, 2007

  • CIM
    Energy/GHG Management Assessment Using TSM Indicators

    By Lauri Gregg

    Key Message Energy focused Change Management Process that engages operations managers is the missing tool needed to build capacity for energy/GHG management

    May 1, 2007

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    Use of Thickening for Sustainable Management of Mine Tailings

    By Catherine N. Mulligan

    Thickening of mine tailings is a relatively new concept for their sustainable management. Removal of water from the tailings to form a paste instead of slurry disposal decreases environmental and geot

    May 1, 2007

  • CIM
    The Integration of Photovoltaic and Solar Ventilation Technologies into a Pre-fabricated Outdoor Room

    By Himanshu Dehra

    The pre-fabricated outdoor rooms are often utilised near the mines and construction sites for office purposes. The paper has presented modelling and simulation results of the integration of commercial

    May 1, 2007

  • CIM
    Iron Ore in Northern Labrador -The Rejuvenation of an Historic Mining Camp at Schefferville

    By John F. Kearney

    After World War II Canada?s fledgling iron ore mining industry developed along the ill-defined Quebec / Labrador border near what became the town of Knob Lake and later renamed Schefferville. For abo

    May 1, 2007

  • CIM
    Hydraulic Fill Research at James Cook University in the new Millennium

    By K. Pirapakaran

    The Geotechnical Engineering research group at James Cook University has been working closely with all the leading mines in Australia in the area of minefills. They have carried out substantial resear

    May 1, 2007

  • CIM
    Energy Initiatives Ontario Operations

    Ontario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co

    May 1, 2007

  • CIM
    Rationale for Quantum Leap Innovations in Mine Fill

    By J. H. Nantel

    Indications are that underground mining is gaining favour with large and small mining companies due to environmental and sustainability concerns. Dramatic changes to mine fill technologies will be nee

    May 1, 2007

  • CIM
    Using Effective Stress Theory to Characterize the Behavior of Backfill

    The importance of understanding the behaviour of cemented paste backfill (CPB) within the framework of the effective stress concept is highlighted in this paper. Only through an understanding built on

    May 1, 2007

  • CIM
    Towards 5.0 million tonnes of pellets per annum

    By Ronald C. Schimmel

    In 2006, the Corus IJmuiden pellet plant produced approximately 4.6 mln tonnes of pellets. Corus IJmuiden is about to increase its pig iron production to 6.4 mln tonne HM per annum. The burden of th

    May 1, 2007

  • CIM
    New Support Concepts for Hard Rock Mining Applications

    By Thomas M. Barczak

    A critical safety component for all underground mining is intrinsic and standing support systems. Specifically, tabular hardrock mining exploits a wide variety of deposits that require various metho

    May 1, 2007