Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geophysical Methods for Site Characterization for Marine Foundations (2dc87bb8-7bfd-4523-92cd-c3dfe612556c)By Richard E. Sylwester
Evaluating surface and subsurface conditions for marine foundations (bridges, causeways, terminals, etc.) is often done with a limited amount of data. Subsurface information for these projects is prim
May 11, 2007
-
Quality Control of Production Pile Installations for US-90 Replacement Bridge Over St. Louis BayBy Kevin Kuhl
With the destruction of the US-90 Bridge spanning St. Louis Bay by Hurricane Katrina, the State of Mississippi awarded its first major design-build contract in order to have a completed four-lane brid
May 11, 2007
-
Caisson Foundations For Mississippi River Bridges In The New Orleans Area (2e66a216-6dc8-4479-804e-25f5836f407e)By William B. Conway
This paper will describe the large caisson pier foundations for four of the bridges crossing the Mississippi River in the New Orleans area; and will discuss some of the unusual problems encountered du
May 11, 2007
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, WisconsinBy Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
Drilled Shaft Foundations for the Float-in Dam on the Monongahela River at Braddock, PA (6c19e969-5f09-43f8-9e6e-1837d4537e5e)By Robert B. Bittner
The new gated dam on the Monongahela River at Braddock, Pennsylvania, was built for the US Army Corps of Engineers using an innovative "In-the-Wef' technology. A key feature of this technology in
May 11, 2007
-
Construction Of The Main Tower Pier Caissons For The Greenville Bridge In MississippiBy F. Keith Jacobson
To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus
May 11, 2007
-
Construction of Large Drilled Shafts the 2nd Annual Mike O'neill LectureBy Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
May 11, 2007
-
Sudden slumping of hydraulic fills inside geotextile bagsBy H. J. lgner
Hydraulic fills are widely used in the tabular, steeply dipping stopes of the South African gold and platinum mines as an integrated process within a daily cycle of drill and blast. There is therefor
May 1, 2007
-
The Hydrogen Economy: Current Reality and Future Prospects from the Perspective of a Major ProducerBy Pierre Gauthier
Is the hydrogen economy of the future just another fish story? Absolutely not! There have been many changes affecting the energy equation over the last 10 years and conditions have changed. In this
May 1, 2007
-
Energy/GHG Management Assessment Using TSM IndicatorsBy Lauri Gregg
Key Message Energy focused Change Management Process that engages operations managers is the missing tool needed to build capacity for energy/GHG management
May 1, 2007
-
The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground VoidsSafe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such
May 1, 2007
-
Use of Thickening for Sustainable Management of Mine TailingsBy Catherine N. Mulligan
Thickening of mine tailings is a relatively new concept for their sustainable management. Removal of water from the tailings to form a paste instead of slurry disposal decreases environmental and geot
May 1, 2007
-
The Integration of Photovoltaic and Solar Ventilation Technologies into a Pre-fabricated Outdoor RoomBy Himanshu Dehra
The pre-fabricated outdoor rooms are often utilised near the mines and construction sites for office purposes. The paper has presented modelling and simulation results of the integration of commercial
May 1, 2007
-
Iron Ore in Northern Labrador -The Rejuvenation of an Historic Mining Camp at ScheffervilleBy John F. Kearney
After World War II Canada?s fledgling iron ore mining industry developed along the ill-defined Quebec / Labrador border near what became the town of Knob Lake and later renamed Schefferville. For abo
May 1, 2007
-
Hydraulic Fill Research at James Cook University in the new MillenniumBy K. Pirapakaran
The Geotechnical Engineering research group at James Cook University has been working closely with all the leading mines in Australia in the area of minefills. They have carried out substantial resear
May 1, 2007
-
Energy Initiatives Ontario OperationsOntario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co
May 1, 2007
-
Rationale for Quantum Leap Innovations in Mine FillBy J. H. Nantel
Indications are that underground mining is gaining favour with large and small mining companies due to environmental and sustainability concerns. Dramatic changes to mine fill technologies will be nee
May 1, 2007
-
Using Effective Stress Theory to Characterize the Behavior of BackfillThe importance of understanding the behaviour of cemented paste backfill (CPB) within the framework of the effective stress concept is highlighted in this paper. Only through an understanding built on
May 1, 2007
-
Towards 5.0 million tonnes of pellets per annumBy Ronald C. Schimmel
In 2006, the Corus IJmuiden pellet plant produced approximately 4.6 mln tonnes of pellets. Corus IJmuiden is about to increase its pig iron production to 6.4 mln tonne HM per annum. The burden of th
May 1, 2007
-
New Support Concepts for Hard Rock Mining ApplicationsBy Thomas M. Barczak
A critical safety component for all underground mining is intrinsic and standing support systems. Specifically, tabular hardrock mining exploits a wide variety of deposits that require various metho
May 1, 2007