Search Documents

Sort by

  • CIM
    Daily Production Planning Efforts at Phelps Dodge Miami Smelter

    By V. Ushakov, P. Bogdan

    Daily production scheduling in a highly dynamic smelter environment has always been a great challenge for the operation management due to a significant amount of uncertainties. Planned and unexpected

    Jan 1, 2007

  • CIM
    Operational Strategy At Chagres Smelter, Maximizing Installed Capacity

    By R. Bonifaz

    The Chagres Smelter, part of the Anglo American plc group situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its opera

    Jan 1, 2007

  • AUSIMM
    The Geometry of the Heavy Sulfide Zone - A Challenge for Mine Planning and Geotech at Grasberg

    By S C. Sc, J Young, N Belluz, D Nicholas

    The heavy sulfide zone (HSZ) of the Grasberg deposit has the geometry of a funnel and is located at the contact of the mineralised intrusive and the relatively barren sedimentary rock types. The geome

    Jan 1, 2007

  • SME
    Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft

    By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker

    The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P

    Jan 1, 2007

  • CIM
    Data mining mine data: Truck-shovel fleet management systems

    By S. Dessureault, M. Yildirim

    More mining companies are now investing in IT, including updating one of the traditional IT process control tools used in the mining industry: real time in-pit truck allocation control and monitoring

    Jan 1, 2007

  • SME
    The 1980’s – Hard Times With a Golden Lining

    By William R. Yernberg

    The early part of the decade was marked by world-wide problems and economic difficulties. In 1980, President Jimmy Carter ordered the failed military mission to rescue hostages in the U.S. Embassy in

    Jan 1, 2007

  • CIM
    SABC Circuit Energy Consumption Optimization

    By K. G. Markkola

    Since 2005, Compafifa Contractual Minera Candelaria (CCMC) has defined various strategies which aim to optimize the usage of the available energy in each of the SAG grinding circuit modules (SABC-A co

    Jan 1, 2007

  • AUSIMM
    Argyle Diamonds - Closing a Large Open Pit During a Mining Boom

    The Argyle AK1 Pit has been operating and producing over 25 per cent of the worldÆs diamonds by volume for over 20 years. The mining boom in Western Australia is creating upward cost pressures to Argy

    Jan 1, 2007

  • NIOSH
    Administrative controls for reducing worker noise exposures

    By E. R. Bauer

    Noise-induced hearing loss (NIHL) continues to be a concern of the mining industry. A new noise standard (30 CFR, Part 62) is aimed at reducing NIHL in mining through engineering and administrative no

    Jan 1, 2007

  • AUSIMM
    Risk Analysis and Decision-Making - A Case Study

    Solid EnergyÆs project evaluation process utilises a standard staged gate approach, with five levels leading ultimately to project execution (level 6). For a project to progress through each level, sp

    Jan 1, 2007

  • SME
    Guadarrama Tunnel Construction with Double Shield TBMs

    By F. Mendaña

    The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented

    Jan 1, 2007

  • AUSIMM
    The Challenges of Success

    Mining in the twenty-first century brings with it a new range of challenges, some unfamiliar to our industry. Skilled staff recruitment and retention is a significant issue. Equipment supply lead time

    Jan 1, 2007

  • AUSIMM
    Leaching of a Refractory Gold Ore Sample from the Central Zone, Clarence Stream Property, New Brunswick, Canada

    By J Pric, M Fulton, C Xia

    A cyanidation study was conducted on a mild refractory gold ore sample from the Central zone of Clarence Stream Property, owned by Freewest Resources Canada, to develop a leaching strategy to extract

    Jan 1, 2007

  • AUSIMM
    Production Schedule Optimisation in Underground Hard Rock Mining Using Mixed Integer Programming

    By E Topal

    There are presently no suitable underground mine production scheduling optimisation models available for application to sublevel stope mining. Scheduling underground production for maximum return is t

    Jan 1, 2007

  • SME
    The United State?s Role In The International Tunnelling Association

    By Harvey Parker

    This is part two of an article on the prominent role that the United States and its industry leaders have played on the International Tunnelling and Underground Space Association (ITA), which represen

    Jan 1, 2007

  • CIM
    Distribution of Gold in Hypogene Ore at the Ernest Henry Iron Oxide Copper-Gold Deposit, Cloncurry District, NW Queensland

    By P. J. Williams, A. R. Foster

    Petrographic studies, assay records, and laser ablation-inductively coupled plasma-mass spectrometer (LA-ICP-MS) analyses of major sulfides suggest nearly all of the gold at the Ernest Henry Cu-Au dep

    Jan 1, 2007

  • DFI
    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • SME
    Elm Road Generating Station Water Intake Tunnel

    By Brendan Reilly, Jon Isaacson, Paul McDermott

    Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.

    Jan 1, 2007

  • AUSIMM
    Life of Business Optimisation - The Mathematical Programming Approach

    A new approach to strategic planning, the Life of Business Optimisation System (LOBOS) optimises production systems from the scale of stopes in a single mine to an entire business strategy consisting

    Jan 1, 2007

  • AUSIMM
    Process Design of a Regrind Facility at the Leinster Nickel Operations to Improve Concentrator Recovery

    By K E. Barns, P J. Sharman, S A. Thomas and

    This paper presents the development of a regrind facility design at BHP BillitonÆs Leinster Nickel Operations (LNO) in Western Australia. The recovery opportunity was identified from an analysis of pl

    Jan 1, 2007