Search Documents

Sort by

  • SME
    Design of the Epping to Chatswood Rail Line, Sydney, Australia

    By Jim Rozek, Robert A. Gee

    The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc

    Jan 1, 2005

  • AUSIMM
    Upgrading of the Mechanical Braking System of a Large Blair Multi-Rope Rock Hoist

    By J Harmse

    This paper deals with the modernisation of the brakes on an electrically coupled Blair multi-rope hoist and covers the removal of the old calliper brakes and hydraulic control system, and its replacem

    Jan 1, 2005

  • AUSIMM
    Sampling, Metallurgical Accounting and Reduction of Balance Estimation Variance

    A metallurgical balance drawn around a mineral processing plant or smelter must involve all process streams crossing the plant boundary. Modern sampling theory, as formulated by Gy, and sound statisti

    Jan 1, 2005

  • SME
    Analyses Of A Hydrothermal Bentonite Deposit In Nevada

    By Haydn H. Murray

    A hydrothermal bentonite located in the high Sierras in Nevada is being mined and processed to produce a natural dietary supplement. The minerals present are smectite, gypsum, jarosite, quartz, feldsp

    Jan 1, 2005

  • SAIMM
    Recent Developments In Flotation Reagents To Improve Base Metal Recovery

    By S Sondashi, F. J. Chidley, W. A. Grobler

    Some of the challenges facing the flotation of base metal sulphides are the opening of new and varying ore bodies as well as maintaining essential skills in plants. Flotation reagent research focuses

    Jan 1, 2005

  • TMS
    Preliminary Investigation Of Fluid Mixing Chracteristics In Bath During Side And Top Combined Blowing AOD Refining Process Of Stainless Steel

    By Ji-He Wei

    Keywords: stainless steel, AOD refining, side and top combined blowing, mixing characteristics, water modeling The fluid mixing characteristics in the bath during the side and top combined blowin

    Jan 1, 2005

  • ISEE
    An Improved Technique for Predicting Vibration Levels from Tunnel Blasting

    By W. J. Birch, M. Kirke

    Despite increasing competition from mechanical methods of tunnelling, the drill and blast method is often still the most viable method of excavating tunnels in strong and abrasive rock. To advance a t

    Jan 1, 2005

  • SME
    Trends In Hard Rock Mined Land Reclamation And Financial Assurance Requirements

    By Dalva L. Moellenberg

    Introduction Hard rock mine closure (often referred to as decommissioning), mined land reclamation and financial assurance requirements are receiving considerable attention by governments and organ

    Jan 1, 2005

  • AUSIMM
    Development of Sampling and Assaying Protocols at the New Bendigo Gold Project, Victoria, Australia

    By S C. Dominy

    The Bendigo Goldfield is located in the state of Victoria, Australia, and is one of a number of quartz-reef fields that make up the greater Central Victorian Goldfield. At Bendigo gold particles are c

    Jan 1, 2005

  • IMMS
    Developing A Geological Model For The Clarion-Clipperton Polymetallic Nodule Deposits

    By Nii Allotey Odunton

    One of the primary responsibilities of the International Seabed Authority?s Secretariat (the Secretariat) is to assess the quantities of metals present in seabed polymetallic nodules in the Internatio

    Jan 1, 2005

  • SME
    Considerations for Baselining Groundwater Conditions for Tunneling Projects

    By Steven W. Hunt, Isabelle Lamb, Steven B. Fradkin

    Groundwater control is generally an important consideration and significant source of risk during most tunneling projects. Proper baselining of groundwater conditions requires: 1) a thorough understan

    Jan 1, 2005

  • AUSIMM
    Geological Solutions to Short-Term Planning in Iron Ore ù A Pilbara Iron Example, Mt Tom Price

    By J Austin, R Bitencourt

    Differences between the long-term model (LTM) and mine geology system (MGS) grade control block-outs on a blast block scale can impose difficulties to planning crusher feed grade and tonnes on a month

    Jan 1, 2005

  • TMS
    Thermodynamic Evaluation Of Electronic Waste Treatment

    By Scott A. Shuey

    Keywords: E-Waste, Pyrometallurgy Many might think addressing the issue of e-waste is a new area of study. Electronics disposal has been discussed in some circles for at least the past 25 years. Th

    Jan 1, 2005

  • SME
    Characterization of Sewage Sludge and Clays for Application in Ceramic Bricks

    By M. P. D. Ingunza, Júnior Santos, F. S. D. Araújo, A. L. C. Araújo, J. Y. P. Leite

    Wastewater sludge is a problem for environmental control and it is necessary alternative researches for its reuse. Industries can research the association of clay and sewage sludge as a source of cera

    Jan 1, 2005

  • SME
    Owner Procured Tunnel Boring Machines––A Discussion

    By A. R. Biggart, A. Walters, G. J. E. Kramer

    The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma

    Jan 1, 2005

  • AUSIMM
    Leveraging Accuracy and Precision ù Multi-Phase Mass Balancing and Reconciliation as a Tool for Quality Data Management

    By M Dunglison, P M. Cameron

    Simultaneous mass-balancing of a mineral processing flow sheet results in adjustments to each data point that reflects the accuracy and precision across the full set of data. In this way, all the good

    Jan 1, 2005

  • AUSIMM
    Granite Gold Mineral Systems in New Zealand

    By G A. Partington

    Recent research has highlighted the potential of a relatively new style of gold mineralisation related to granite intrusion. New discoveries in Alaska, Central Europe and Asia and Eastern Australia wi

    Jan 1, 2005

  • SME
    Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero Emissions

    By Tuncel M. Yegulalp, Anuta Belova

    This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu

    Jan 1, 2005

  • AUSIMM
    Comparative Evaluation of Fogging Phenomenon in the Ramp of Three Mines in Finland

    In Finland fogging in mine ramps is a common problem. Fog forms when warm and humid exhaust air moves upwards the ramp, where the skin temperature of surrounding wallrock decreases to about 10¦C. Chan

    Jan 1, 2005

  • AUSIMM
    Integrating North American Shaft Sinking Practices into Australian Operations ù Telfer Hoist Shaft Development

    By P Bonniwell

    As a part of the Newcrest, Telfer Expansion Project, a consortium of Australian, Canadian and South African Mining Contractors in joint venture have been contracted to develop the hoisting shaft. The

    Jan 1, 2005