Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design of the Epping to Chatswood Rail Line, Sydney, AustraliaBy Jim Rozek, Robert A. Gee
The Epping to Chatswood Rail Line project is the largest publicly funded infrastructure project in New South Wales. Construction commenced in November2002 with opening scheduled for 2008. The work inc
Jan 1, 2005
-
Upgrading of the Mechanical Braking System of a Large Blair Multi-Rope Rock HoistBy J Harmse
This paper deals with the modernisation of the brakes on an electrically coupled Blair multi-rope hoist and covers the removal of the old calliper brakes and hydraulic control system, and its replacem
Jan 1, 2005
-
Sampling, Metallurgical Accounting and Reduction of Balance Estimation VarianceA metallurgical balance drawn around a mineral processing plant or smelter must involve all process streams crossing the plant boundary. Modern sampling theory, as formulated by Gy, and sound statisti
Jan 1, 2005
-
Analyses Of A Hydrothermal Bentonite Deposit In NevadaBy Haydn H. Murray
A hydrothermal bentonite located in the high Sierras in Nevada is being mined and processed to produce a natural dietary supplement. The minerals present are smectite, gypsum, jarosite, quartz, feldsp
Jan 1, 2005
-
Recent Developments In Flotation Reagents To Improve Base Metal RecoveryBy S Sondashi, F. J. Chidley, W. A. Grobler
Some of the challenges facing the flotation of base metal sulphides are the opening of new and varying ore bodies as well as maintaining essential skills in plants. Flotation reagent research focuses
Jan 1, 2005
-
Preliminary Investigation Of Fluid Mixing Chracteristics In Bath During Side And Top Combined Blowing AOD Refining Process Of Stainless SteelBy Ji-He Wei
Keywords: stainless steel, AOD refining, side and top combined blowing, mixing characteristics, water modeling The fluid mixing characteristics in the bath during the side and top combined blowin
Jan 1, 2005
-
An Improved Technique for Predicting Vibration Levels from Tunnel BlastingBy W. J. Birch, M. Kirke
Despite increasing competition from mechanical methods of tunnelling, the drill and blast method is often still the most viable method of excavating tunnels in strong and abrasive rock. To advance a t
Jan 1, 2005
-
Trends In Hard Rock Mined Land Reclamation And Financial Assurance RequirementsBy Dalva L. Moellenberg
Introduction Hard rock mine closure (often referred to as decommissioning), mined land reclamation and financial assurance requirements are receiving considerable attention by governments and organ
Jan 1, 2005
-
Development of Sampling and Assaying Protocols at the New Bendigo Gold Project, Victoria, AustraliaBy S C. Dominy
The Bendigo Goldfield is located in the state of Victoria, Australia, and is one of a number of quartz-reef fields that make up the greater Central Victorian Goldfield. At Bendigo gold particles are c
Jan 1, 2005
-
Developing A Geological Model For The Clarion-Clipperton Polymetallic Nodule DepositsBy Nii Allotey Odunton
One of the primary responsibilities of the International Seabed Authority?s Secretariat (the Secretariat) is to assess the quantities of metals present in seabed polymetallic nodules in the Internatio
Jan 1, 2005
-
Considerations for Baselining Groundwater Conditions for Tunneling ProjectsBy Steven W. Hunt, Isabelle Lamb, Steven B. Fradkin
Groundwater control is generally an important consideration and significant source of risk during most tunneling projects. Proper baselining of groundwater conditions requires: 1) a thorough understan
Jan 1, 2005
-
Geological Solutions to Short-Term Planning in Iron Ore ù A Pilbara Iron Example, Mt Tom PriceBy J Austin, R Bitencourt
Differences between the long-term model (LTM) and mine geology system (MGS) grade control block-outs on a blast block scale can impose difficulties to planning crusher feed grade and tonnes on a month
Jan 1, 2005
-
Thermodynamic Evaluation Of Electronic Waste TreatmentBy Scott A. Shuey
Keywords: E-Waste, Pyrometallurgy Many might think addressing the issue of e-waste is a new area of study. Electronics disposal has been discussed in some circles for at least the past 25 years. Th
Jan 1, 2005
-
Characterization of Sewage Sludge and Clays for Application in Ceramic BricksBy M. P. D. Ingunza, Júnior Santos, F. S. D. Araújo, A. L. C. Araújo, J. Y. P. Leite
Wastewater sludge is a problem for environmental control and it is necessary alternative researches for its reuse. Industries can research the association of clay and sewage sludge as a source of cera
Jan 1, 2005
-
Owner Procured Tunnel Boring Machines––A DiscussionBy A. R. Biggart, A. Walters, G. J. E. Kramer
The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma
Jan 1, 2005
-
Leveraging Accuracy and Precision ù Multi-Phase Mass Balancing and Reconciliation as a Tool for Quality Data ManagementBy M Dunglison, P M. Cameron
Simultaneous mass-balancing of a mineral processing flow sheet results in adjustments to each data point that reflects the accuracy and precision across the full set of data. In this way, all the good
Jan 1, 2005
-
Granite Gold Mineral Systems in New ZealandBy G A. Partington
Recent research has highlighted the potential of a relatively new style of gold mineralisation related to granite intrusion. New discoveries in Alaska, Central Europe and Asia and Eastern Australia wi
Jan 1, 2005
-
Thermodynamic Optimization Of Hydrogen Production For A Coal Based Power Plant With Zero EmissionsBy Tuncel M. Yegulalp, Anuta Belova
This paper expands on the ZECA (Zero Emission Coal Alliance) technology, which is aimed at making coal a sustainable source of clean energy in the near future. The technology proposed immediate captu
Jan 1, 2005
-
Comparative Evaluation of Fogging Phenomenon in the Ramp of Three Mines in FinlandIn Finland fogging in mine ramps is a common problem. Fog forms when warm and humid exhaust air moves upwards the ramp, where the skin temperature of surrounding wallrock decreases to about 10¦C. Chan
Jan 1, 2005
-
Integrating North American Shaft Sinking Practices into Australian Operations ù Telfer Hoist Shaft DevelopmentBy P Bonniwell
As a part of the Newcrest, Telfer Expansion Project, a consortium of Australian, Canadian and South African Mining Contractors in joint venture have been contracted to develop the hoisting shaft. The
Jan 1, 2005